Just an observation yesterday. I was driving on Vic east and then onto Ring Road south yesterday around noon. Very little semi's compared to before. I know it will not eliminate semi's completely, but I thought the traffic was flowing smoothly at lunch time compared to other days I've been in that area at that time of day.

A big factor that would go a long way in eliminating even more truck traffic will be to move the Husky House outside of the city limits. The Flying J in Balgonie will help, but there are still brand loyal drivers out there that will continue to use the Husky House.
Reply With Quote
     
     
  #1462  
Old Posted Oct 31, 2019, 4:01 PM
Stormer's Avatar
Stormer Stormer is offline
 
Join Date: Jan 2008
Posts: 8,089
I took another rip last night and the main through road southbound at TCH is still closed. WTF. You can still get to the south leg using the exit lane but there is a 60kph speed zone.

Also what does "Exit OC" mean? This is Highway 11 so different numbering than TCH which now uses KM's from the Manitoba boundary.

Reply With Quote
     
     
  #1463  
Old Posted Oct 31, 2019, 4:21 PM
city rep city rep is offline
 
Join Date: Jun 2018
Posts: 19
maybe 0C is zero Cilometers. Worst typo ever made
Reply With Quote
     
     
  #1464  
Old Posted Oct 31, 2019, 4:25 PM
esquire's Avatar
esquire esquire is offline
 
Join Date: Oct 2001
Posts: 37,480
Quote:
Originally Posted by city rep View Post
maybe 0C is zero Cilometers. Worst typo ever made
Not a chance. It's probably just an exit numbering scheme where the western start of the ring road is kilometre zero, and each separate ramp gets a different letter. So you have 0A, 0B, 0C, etc.
Reply With Quote
     
     
  #1465  
Old Posted Oct 31, 2019, 4:35 PM
Stormer's Avatar
Stormer Stormer is offline
 
Join Date: Jan 2008
Posts: 8,089
Quote:
Originally Posted by esquire View Post
Not a chance. It's probably just an exit numbering scheme where the western start of the ring road is kilometre zero, and each separate ramp gets a different letter. So you have 0A, 0B, 0C, etc.
The TCH part of the Bypass from Balgonie to Pinkie Rd (highway 11/TCH mega-interchange west of Regina) has exit numbering based on KM from Manitoba. The existing Highway 11 has exits numbered A,B,C starting at Regina toward Saskatoon. The new stretch of 11 from Condie to Pinkie interchange comprising the west leg of the Regina Bypass has at least 6 exits, so I do not know how they arrive at C.
Reply With Quote
     
     
  #1466  
Old Posted Oct 31, 2019, 5:09 PM
ceedub1170's Avatar
ceedub1170 ceedub1170 is offline
 
Join Date: Sep 2006
Posts: 451
Quote:
Originally Posted by Stormer View Post
If you don't count a few right-hand-turn-only accesses, yes unfortunately there are 2 at grade intersections to accommodate local landowners who complained about having to drive their tractors and combines great distances. One is a Courtney Street in the far SW corner of the Bypass and the other is at Armour Rd. in the NW sector. Both are in remote rural areas.

There are no traffic lights or speed zones. Very little cross traffic is expected.
The Armour Road At-Grade crossing will be quite busy. I drive it almost everyday in the spring and summer and there is always tons of traffic on Armour Road. There are lots of people going to and from Sherwood Forest (Commuting, golf, pool, ...) and Armour Road is by far the most used route.

I'm not looking forward to crossing the By-Pass at grade daily.

Last edited by ceedub1170; Oct 31, 2019 at 5:31 PM.
Reply With Quote
     
     
  #1467  
Old Posted Oct 31, 2019, 5:11 PM
bomberjet bomberjet is offline
 
Join Date: Nov 2012
Posts: 16,385
Interchange at km 0 of the bypass, exit C.

I assume it is planned to have a complete outer ring road at some point?
Reply With Quote
     
     
  #1468  
Old Posted Oct 31, 2019, 5:40 PM
LittleBoy's Avatar
LittleBoy LittleBoy is offline
 
Join Date: Feb 2019
Posts: 198
Did we get a nice project for $1.8 billion? Sure

Did we need this nice project for $1.8 billion? Not a chance

Sad to see so many people on here that are apparently proponents of urban development and densification acting as if this was a good investment. There was absolutely zero necessity for a project of this scale, and a nice finishing project will not change my mind. This project has terrible long-term social and economic implications for the city. This will only aid the development of the far out suburbs, pushing investment away from core areas. Really wish that we could've seen this massive amount of money going to something that was actually needed.
Reply With Quote
     
     
  #1469  
Old Posted Oct 31, 2019, 5:40 PM
Stormer's Avatar
Stormer Stormer is offline
 
Join Date: Jan 2008
Posts: 8,089
Quote:
Originally Posted by ceedub1170 View Post
The Armour Road At-Grade crossing will be quite busy. I drive it almost everyday in the spring and summer and there is always tons of traffic on Armour Road. There are lots of people going to and from Sherwood Forest (Commuting, golf, pool, ...) and Armour Road is by far the most used route.

I'm not looking forward to crossing the By-Pass at grade daily.
I was on the Hill Ave interchange yesterday. It is literally in the middle of nowhere. It does not even connect to Hill Ave or the Airport. Could have spent that money on Armour Rd.
Reply With Quote
     
     
  #1470  
Old Posted Oct 31, 2019, 5:42 PM
Stormer's Avatar
Stormer Stormer is offline
 
Join Date: Jan 2008
Posts: 8,089
Quote:
Originally Posted by bomberjet View Post
Interchange at km 0 of the bypass, exit C.

I assume it is planned to have a complete outer ring road at some point?
There is a route planned to go from Tower Rd, and TCH to the new Highway 11 interchange near Condie. You can see in the Condie interchange that it is designed to add the NE leg of the Bypass.
Reply With Quote
     
     
  #1471  
Old Posted Oct 31, 2019, 5:45 PM
bomberjet bomberjet is offline
 
Join Date: Nov 2012
Posts: 16,385
Thanks.

Just for my info, where exactly is that photo taken? Trying to parse it out with the maps available on the bypass website. But can't make sense of it.
Reply With Quote
     
     
  #1472  
Old Posted Oct 31, 2019, 5:51 PM
Stormer's Avatar
Stormer Stormer is offline
 
Join Date: Jan 2008
Posts: 8,089
Future NE connection at Highway 11

Reply With Quote
     
     
  #1473  
Old Posted Oct 31, 2019, 5:53 PM
jigglysquishy's Avatar
jigglysquishy jigglysquishy is offline
 
Join Date: Jul 2010
Posts: 3,326
Quote:
Originally Posted by LittleBoy View Post
Did we get a nice project for $1.8 billion? Sure

Did we need this nice project for $1.8 billion? Not a chance

Sad to see so many people on here that are apparently proponents of urban development and densification acting as if this was a good investment. There was absolutely zero necessity for a project of this scale, and a nice finishing project will not change my mind. This project has terrible long-term social and economic implications for the city. This will only aid the development of the far out suburbs, pushing investment away from core areas. Really wish that we could've seen this massive amount of money going to something that was actually needed.
For the $1.2 billion the capital construction cost (the other $600 million is for future maintenance) we could have gotten a Calgary style LRT from the new Costco to the stadium via downtown, widen the Arcola bridge, and do a full interchange at 9th Avenue N/Pasqua.

Every sane person would choose those over the Bypass.
Reply With Quote
     
     
  #1474  
Old Posted Oct 31, 2019, 5:55 PM
Stormer's Avatar
Stormer Stormer is offline
 
Join Date: Jan 2008
Posts: 8,089
Quote:
Originally Posted by bomberjet View Post
Thanks.

Just for my info, where exactly is that photo taken? Trying to parse it out with the maps available on the bypass website. But can't make sense of it.
Heading south at blue circle. the Pinkie interchange is not fully illustrated here. Hill Ave Interchange shown where it says "Sherwood No. 159".

Reply With Quote
     
     
  #1475  
Old Posted Oct 31, 2019, 6:05 PM
sask1982's Avatar
sask1982 sask1982 is offline
 
Join Date: Sep 2002
Posts: 916
Quote:
Originally Posted by ceedub1170 View Post
The Armour Road At-Grade crossing will be quite busy. I drive it almost everyday in the spring and summer and there is always tons of traffic on Armour Road. There are lots of people going to and from Sherwood Forest (Commuting, golf, pool, ...) and Armour Road is by far the most used route.

I'm not looking forward to crossing the By-Pass at grade daily.
I agree that intersection was not a good decision.
Reply With Quote
     
     
  #1476  
Old Posted Oct 31, 2019, 6:06 PM
Stormer's Avatar
Stormer Stormer is offline
 
Join Date: Jan 2008
Posts: 8,089
Help get the Bypass on Google Maps:

To report a missing road
  • Make sure you have the latest version of the Google Maps app.
  • Go to the location where the missing road should appear.
  • Open the Menu and tap Send Feedback.
  • Select Report a Missing Road.
  • Tap the location of the missing road.
  • Add the name of the road and any additional information.
Reply With Quote
     
     
  #1477  
Old Posted Oct 31, 2019, 6:58 PM
bomberjet bomberjet is offline
 
Join Date: Nov 2012
Posts: 16,385
Thanks for all the info. Curious, what numbers are shown for the exits at the other interchange locations. The next interchange either direction should have the end mileage for the entire bypass if the numbering was done properly. It should jump from 0 to like 60 or something.
Reply With Quote
     
     
  #1478  
Old Posted Oct 31, 2019, 7:11 PM
Stormer's Avatar
Stormer Stormer is offline
 
Join Date: Jan 2008
Posts: 8,089
Quote:
Originally Posted by bomberjet View Post
Thanks for all the info. Curious, what numbers are shown for the exits at the other interchange locations. The next interchange either direction should have the end mileage for the entire bypass if the numbering was done properly. It should jump from 0 to like 60 or something.
Yes for the blue and green sections. the yellow section uses Hwy 11 numbering. For example White City is Exit 223 and Hwy 6 is 247.

Reply With Quote
     
     
  #1479  
Old Posted Oct 31, 2019, 7:25 PM
ceedub1170's Avatar
ceedub1170 ceedub1170 is offline
 
Join Date: Sep 2006
Posts: 451
Quote:
Originally Posted by Stormer View Post
Yes for the blue and green sections. the yellow section uses Hwy 11 numbering. For example White City is Exit 223 and Hwy 6 is 247.

Ring Road is now a complete ring. It connects to the bypass at the Trans-Canada highway interchange and again at the 9th Ave N Interchange (although, there are 4 sets of lights starting a Lewvan)
Reply With Quote
     
     
  #1480  
Old Posted Oct 31, 2019, 7:57 PM
Missinglink Missinglink is offline
 
Join Date: Nov 2014
Posts: 54
Quote:
Originally Posted by djforsberg View Post
Pasqua St, you mean. Lewvan ends at Sherwood Dr. Also Ring Rd turns into 9th Ave N west of Pasqua St. I know, not confusing at all.
No worse than 1st Ave N intersecting with 7Ave N. Regina has never been known for being smart.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 5:23 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.