  #421  
Old Posted Oct 16, 2019, 8:57 PM
MetroYVR MetroYVR is offline
 
Join Date: Jul 2019
Posts: 134
they locked you in the moment the 7-day contract rescission period has passed... there is no urgency to complete

Last edited by MetroYVR; Oct 16, 2019 at 9:09 PM.
Reply With Quote
     
     
  #422  
Old Posted Oct 16, 2019, 9:04 PM
Spr0ckets Spr0ckets is offline
 
Join Date: Oct 2015
Posts: 1,993
Quote:
Originally Posted by VarBreStr18 View Post
Fair enough, very few developers sit on multi million dollars for their projects , with the exception of Hong Kong Li Ka Shing’s Concord Pacific. They all borrow from somewhere using their proposed project as leverage. That is exactly why all developers want to sell out fast and get on construction in timely manner to repay their loan .
Pretty much.
That's why pre-sales are super vital to these big developments because often times you have to hit a certain thresshold or percentage of units sold to show you're viable to financiers to push the project through

You're probably not going to sell out the entire project (even though some do in certain cases) before or during construction, but if you can show enough demand with a decent amount sold, that's typically decent leverage or collateral to use to get (more) funding.

Quote:
Originally Posted by VarBreStr18 View Post
Look at Thind which is relatively new and small ish company . They wasted no time to build Lumina. Even Bosa “s Solo District is completed reasonably on time with only 4 to 6 months delay. My argument is private smaller company much more conscientious with time and finance management, they don’t have much juggle room . The sooner they can finish and hand over to consumer the better financial sense.

Your logic is sound but with one small caveat.
When you use your own money, you carry ALL of the inherent risk in the case of the project failing or stalling (stalls are usually expenses added on top of your budget because all that equipment is usually rented, and then you have insurance/liability fees and whatnot on top of everything).

That might seem like a welcome incentive to get it done as soon as possible, but these sort of projects always come with huge amounts of uncertainty and risks associated with them that you have little to no control over as just the developer or the owner (most typically, they're on the contractor's end), and even though you might have stipulations in the contracts that limit your risk factor and losses in the event of delays, there's only so much delay that any project can carry before the costs begin to accrue even on the developer.

Hence the reason why,....'other people's money'....always the preferred route.
Reply With Quote
     
     
  #423  
Old Posted Oct 16, 2019, 10:13 PM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,834
Quote:
Originally Posted by VarBreStr18 View Post
Talking about delay, I just realize TAB Tower 1 was marketed in the spring of 2014. It is now end of 2019, tower 1 is not even fully occupied. So it is also 2 years delay and counting. Kinda disheartening to see all surrounding projects which comes much later yet completed much ahead of TAB. ....
It's a mega project. It's more complex and takes longer to build.
If you want a shorter completion time, buy into a smaller development.
You also won't have the headaches of dealing with mall traffic in the parking garage, noise or vandalism that you might encounter in the "core" of the Brentwood town centre.
Reply With Quote
     
     
  #424  
Old Posted Oct 17, 2019, 3:47 AM
VarBreStr18 VarBreStr18 is offline
 
Join Date: Nov 2014
Posts: 750
Quote:
Originally Posted by officedweller View Post
It's a mega project. It's more complex and takes longer to build.
If you want a shorter completion time, buy into a smaller development.
You also won't have the headaches of dealing with mall traffic in the parking garage, noise or vandalism that you might encounter in the "core" of the Brentwood town centre.
I would had I known this project take so much longer to complete. I was already prepared for this to take longer than usual to complete because of the complexity.... but this long? Shape seems to take care of the renters more than the owners. There was never any periodic construction progress report to the owners. We were totally kept in the dark guessing where are we at. The amazing retails turns out to be Starbucks, Mcdonald, food court type eateries. I am sure Tim Hortens, KFC will be on the lists too. No real grocery store. The only consolation is I won't have to deal with mall traffic, because I won't be driving much.
Reply With Quote
     
     
  #425  
Old Posted Oct 17, 2019, 5:46 AM
fredinno's Avatar
fredinno fredinno is offline
 
Join Date: Jan 2012
Posts: 2,317
Quote:
Originally Posted by MetroYVR View Post
all developers are evil, especially Concord and Westbank
LOL

I guess you’re one of those NIMBYs?
Quote:
Originally Posted by VarBreStr18 View Post
Fair enough, very few developers sit on multi million dollars for their projects , with the exception of Hong Kong Li Ka Shing’s Concord Pacific. They all borrow from somewhere using their proposed project as leverage. That is exactly why all developers want to sell out fast and get on construction in timely manner to repay their loan . Look at Thind which is relatively new and small ish company . They wasted no time to build Lumina. Even Bosa “s Solo District is completed reasonably on time with only 4 to 6 months delay. My argument is private smaller company much more conscientious with time and finance management, they don’t have much juggle room . The sooner they can finish and hand over to consumer the better financial sense.
As far as I know, Concord with this one is particularly late, so there may have been problems they needed to sort out they’re not revealing, or it’s a game to sell in limited amounts at a time and build most of the complex at once to save money. If so, perhaps scummy, but the reality is that prebuyers get a discount for reason. No one is forcing Concord to work on an expedited schedule, especially if they’re using their own money.
Reply With Quote
     
     
  #426  
Old Posted Oct 26, 2019, 3:38 AM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,834
By City of Rain Oct 10th:

Quote:
Originally Posted by City Of Rain, post: 1494109, member: 70034
DSC04222 by Hung Lam, on Flickr
DSC04223 by Hung Lam, on Flickr
DSC04224 by Hung Lam, on Flickr
DSC04225 by Hung Lam, on Flickr
DSC04226 by Hung Lam, on Flickr
DSC04227 by Hung Lam, on Flickr
DSC04301 by Hung Lam, on Flickr
DSC04302 by Hung Lam, on Flickr
DSC04303 by Hung Lam, on Flickr
DSC04304 by Hung Lam, on Flickr
Reply With Quote
     
     
  #427  
Old Posted Oct 26, 2019, 2:48 PM
Klazu's Avatar
Klazu Klazu is offline
 
Join Date: Apr 2012
Posts: 10,408
You guys were not kidding. It is all moving forward as one project which will be amazing for the area.

Seems that the parkade will be split in two separate instead of one mega parkade.
Reply With Quote
     
     
  #428  
Old Posted Oct 28, 2019, 9:20 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
 
Join Date: Nov 2005
Posts: 13,169
Could go either way, could be knockout panels with the sheer wall for seismic stability or could be separate. My guess would be separate, no reason for a larger connected parkade with no major retail or office component.
Reply With Quote
     
     
  #429  
Old Posted Nov 30, 2019, 11:10 PM
Lexus's Avatar
Lexus Lexus is offline
 
Join Date: Jul 2018
Posts: 2,876
My photo November 29th, 2019
Well above the ground. Also a third crane came up about a week or so ago for Phase 1B .

Untitled by Lexus, on Flickr
Reply With Quote
     
     
  #430  
Old Posted Dec 1, 2019, 4:43 AM
Marshal Marshal is offline
 
Join Date: Dec 2015
Posts: 1,493
Quote:
Originally Posted by Klazu View Post
You guys were not kidding. It is all moving forward as one project which will be amazing for the area.

Seems that the parkade will be split in two separate instead of one mega parkade.
Right, + this should be one dramatic build, especially from the south. All of Brentwood is quite dramatic from Hwy 1.
Reply With Quote
     
     
  #431  
Old Posted Dec 23, 2019, 6:04 AM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,834
By City of Rain Dec 1st:

Quote:
Originally Posted by City Of Rain, post: 1512920, member: 70034
2 parts series

IMG_6686 by Hung Lam, on Flickr
IMG_6688 by Hung Lam, on Flickr
IMG_6690 by Hung Lam, on Flickr
IMG_6692 by Hung Lam, on Flickr
IMG_6694 by Hung Lam, on Flickr
IMG_6696 by Hung Lam, on Flickr
IMG_6698 by Hung Lam, on Flickr
IMG_6700 by Hung Lam, on Flickr
IMG_6702 by Hung Lam, on Flickr
Reply With Quote
     
     
  #432  
Old Posted Dec 23, 2019, 11:56 PM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,834
More:

Quote:
Originally Posted by City Of Rain, post: 1513390, member: 70034
IMG_6704 by Hung Lam, on Flickr
IMG_6706 by Hung Lam, on Flickr
IMG_6708 by Hung Lam, on Flickr
IMG_6710 by Hung Lam, on Flickr
IMG_6712 by Hung Lam, on Flickr
IMG_6714 by Hung Lam, on Flickr
IMG_6718 by Hung Lam, on Flickr
IMG_6722 by Hung Lam, on Flickr
IMG_6726 by Hung Lam, on Flickr
Reply With Quote
     
     
  #433  
Old Posted Dec 24, 2019, 12:18 AM
excel excel is offline
 
Join Date: Oct 2005
Posts: 3,484
Thanks for the update.
Reply With Quote
     
     
  #434  
Old Posted Jan 15, 2020, 10:19 PM
Lexus's Avatar
Lexus Lexus is offline
 
Join Date: Jul 2018
Posts: 2,876
My pics today from Skytrain 2020/01/15

Train was very slow today, so I used a chance to take a lot of good photos.
Also a base is ready for a fourth care to be erected anytime soon.

Untitled by Lexus, on Flickr

Untitled by Lexus, on Flickr

Untitled by Lexus, on Flickr

Untitled by Lexus, on Flickr

Untitled by Lexus, on Flickr

Untitled by Lexus, on Flickr

Untitled by Lexus, on Flickr

Untitled by Lexus, on Flickr

Untitled by Lexus, on Flickr

Untitled by Lexus, on Flickr

Untitled by Lexus, on Flickr
Reply With Quote
     
     
  #435  
Old Posted Jan 15, 2020, 10:41 PM
Lexus's Avatar
Lexus Lexus is offline
 
Join Date: Jul 2018
Posts: 2,876
I appears that there might be crane #4 and #5, or #5 will go eventually onto #4. We all will find out pretty soon.

Untitled by Lexus, on Flickr
Reply With Quote
     
     
  #436  
Old Posted Jan 15, 2020, 10:43 PM
osirisboy's Avatar
osirisboy osirisboy is offline
 
Join Date: Mar 2006
Posts: 6,431
No. 5 is most likely for a concrete pump
Reply With Quote
     
     
  #437  
Old Posted Jan 18, 2020, 1:26 AM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
 
Join Date: Nov 2005
Posts: 13,169
Agreed it does look like a normal location for a concrete pump, but in the last image posted by Lexus (below) you can see two crane cabs sitting in the yard, so there may be a 5th crane added here.

Reply With Quote
     
     
  #438  
Old Posted Jan 18, 2020, 2:02 AM
osirisboy's Avatar
osirisboy osirisboy is offline
 
Join Date: Mar 2006
Posts: 6,431
I think concord just uses that space as storage
Reply With Quote
     
     
  #439  
Old Posted Jan 25, 2020, 12:18 AM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
 
Join Date: Nov 2005
Posts: 13,169
Sure, but I don't think they own these cranes, so presumably the storage of these cranes would be for this site, or possibly their Surrey project.
Reply With Quote
     
     
  #440  
Old Posted Jan 27, 2020, 6:02 PM
Joshmaxlo's Avatar
Joshmaxlo Joshmaxlo is offline
 
Join Date: Sep 2019
Posts: 115
2 Luffing cranes as well as 2 Tower cranes. 1 Crawler crane outside the view of this pic. Concord doesn't mess around.

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 12:19 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.