Quote:
Originally Posted by acottawa
I haven't seen any origin/destination studies for the Trillium Line, but I am somewhat doubtful that around 20-25 percent of Trillium passengers are headed to Quebec. Unless there were some reason why Quebec-working employees are more likely to live along the Trillium Line, then there would be massively more people piling onto Quebec bound buses throughout the system during the morning rush hour, which we do not see. But even if that were the case, a single bus with 10-15 minute service would pretty easily absorb that demand.
|
I also haven't seen such a study, but it seems pretty important to do before we rule out the PoW.
My guesstimate was based on the fact that roughly 25% of the Federal jobs are in Gatineau. Hull represents around that same proportion of jobs downtown.
I imagine that at the moment, most people working in Gatineau likely drive because the transit service is terrible and because parking is much cheaper in Hull. Having Trillium cross might encourage more users from the south and west to take transit.
Watson quotes additional "studies" or "staff reports" as the reason for dumping PoW, but it I've only ever seen STO's reports saying that Bayview can't handle an STO line. Nothing about OC crossing.
Under Watson, all has been done to try and sabotage any chance of interlining Trillium with Confederation OR crossing the PoW, OR even a proper terminus station for that matter. No surprise he decided on his own to cancel the PoW transit option to save more money for suburban Ottawa.