Posted Sep 30, 2019, 2:33 AM
|
|
|
|
Join Date: Jul 2015
Posts: 144
|
|
There's too much opportunity at the Washington Bottoms site.
I'll give it 6 months before something is proposed again.
So far downtown...
A crane at St. Jude (more soon)
A crane at One Beale.
A crane at the Clipper site. No dirt has moved, but there's one sitting there.
Convention center may get a crane with its next phase starting.
Union row starting demolition here in a month or two.
Wiseacre Brewery in construction mode.
South city construction on the 2nd phase
Some apartments near the Civil Rights museum are being constructed
Fedex Logistics HQ at old Gibson Factory
I'm sure I'm missing a few. Not including minor projects. These are what I notice driving downtown every other day.
|