4th high rise of the zoning applications. See the other 3 in my previous posts. This time for Carroll for the parcel between Aberdeen and May. Also known as the City Technology Center - it would include office as well as a 200 room hotel with 282 parking spots, 100 bicycle parking spots, and 5500 sq ft of ground floor commercial space. Building is 18 floors with a maximum height of 330 feet.
Site was a Ryder Truck Rental lot:
Oh and also there's another zoning app up for a parcel of land to be built out for industrial/manufacturing near the Ashland Orange Line stop. Guess who it's for? Cougle. It specifically mentions how they're moving from Fulton Market to this parcel. Guess who has the land across the street from this proposal to the east? Cougle. What shares one intersection with Cougle? Google! Bunch of stuff proposed for this immediate area..
Anyway, I'm not sure how I feel about these drawings. Feels like someone was trying too hard to be different in some way:
Source: Pappageorge Haymes