Quote:
Originally Posted by k.evans
I was most surprised about how the train primarily serves empty fields. I wish we had had a visionary city council who paid the money to put the train where people already live and would use it, and not theoretical future neighbourhoods like Tunney's, Pimisi, Hurdman, and Cyrville. I imagined what it would have been like had the train, after UOttawa, turned and served Vanier, or after Lyon, tunneled under Richmond Road. We walked from Tunney's into Wellington West and I realized that this neighbourhood will never see high-order transit, despite its relative density since the Confederation Line is a 10-15 minute walk away instead of serving where already people live. I think the same about Stage 2 and its primary service routes of more fields and highways. People came second in both stages.
|
I fully support the intention behind everything you said, but the cost is prohibitive. In order to build an underground LRT through Vanier and even 5 km of Montreal road, you'd have to cancel the entire stage 2 project to pay for it. Yup, cancel all 44 km of stage 2 and the 24 stations to build 5 km of LRT at montreal road. It's that expensive. You'd have to tunnel the entire length of Vanier. There's no above ground option there. Even 3 km through Vanier, would be more expensive than the entire 11 km through Orleans. The reason stage 2 is so dirt cheap through Orleans, is that the train runs in the median of highway 174. No need to build costly over/underpasses, no need to forcefully buy properties from existing owners, no need to build any tunnels. This is also why the Kanata extension and the Orleans extension are both 11-12 km, but the Kanata extension is twice as expensive as Orleans. That's not hyperbole. It's literally twice as expensive. Kanata has no existing corridor, and requires plenty of grade separations.
Stage 2 west involves tunnelling under the SJAM. It's cut and cover, but that's still way more expensive than not tunnelling at all (Like we can for Orleans). There's a reason they didn't go through Vanier. It's ridiculously expensive. And whether we like it or not, 70% of Ottawans live in suburbs, and 10% live in exurbs/rural areas. Only 20% live in the urban central area. We can't build transit that solely serves the central urban area. That's not where most of the residents are, nor is it the type of transit that will generate the most transit ridership.
I can understand not wanting to send rail to the middle of bumfuck nowhere, but the major suburbs should be served by rail. Orleans has higher ridership than anywhere else in the city. It's worth sending rail there. Kanata currently does not have any grade separation, so a LRT would be a massive improvement, and would skyrocket ridership. This would also massively reduce car traffic, congestion and emissions. Ditto for Barrhaven.
I absolutely support improved transit, including rail service to the inner urban areas, but we can't just, not send rail to suburbs. That's where all the ridership is.
edit: Stage 2 construction costs including expropriating properties, but excluding the Trillium Line maintenance.