  #101  
Old Posted May 10, 2019, 11:07 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,905
Really good progress on solar panel installs on office building. They were finishing up the 10 floor elevator and stairwell concrete shafts on apartment building today.
Reply With Quote
     
     
  #102  
Old Posted May 14, 2019, 5:11 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,172
Also not nearly as exciting but the solar parkade garage is about done, it sort of sits behind the 4 story office building and between the main West 5 building and the animal clinic.

They are also digging for the foundation of the retirement building which is right on the corner of Riverbend & Shore Road.
Reply With Quote
     
     
  #103  
Old Posted May 17, 2019, 10:48 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,905
Most of the 10th floor posts are now installed. Forming for mechanical core started as well.
Reply With Quote
     
     
  #104  
Old Posted May 20, 2019, 1:23 AM
Djeffery's Avatar
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,204
Quote:
Originally Posted by MrSlippery519 View Post
Also not nearly as exciting but the solar parkade garage is about done, it sort of sits behind the 4 story office building and between the main West 5 building and the animal clinic.
Was over there today and took this pic. View is from the parking lot at the west end of the West 5 building (corner of which is the extreme right edge of the photo), looking north east.

Reply With Quote
     
     
  #105  
Old Posted May 30, 2019, 11:52 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,905
Windows now going in. Up to 4th floor on east side.
Reply With Quote
     
     
  #106  
Old Posted May 31, 2019, 1:18 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,172
Quote:
Originally Posted by jammer139 View Post
Windows now going in. Up to 4th floor on east side.
Cladding has begun as well on the north/west corner as of last night.
Reply With Quote
     
     
  #107  
Old Posted Jun 9, 2019, 12:09 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,905
Roofing on apartment now started. Exterior on office nearing completion.
Reply With Quote
     
     
  #108  
Old Posted Jun 12, 2019, 2:16 AM
Bsanders Bsanders is offline
Registered User
 
Join Date: Mar 2019
Location: London
Posts: 13
Quote:
Originally Posted by Djeffery View Post
Was over there today and took this pic. View is from the parking lot at the west end of the West 5 building (corner of which is the extreme right edge of the photo), looking north east.

thanks for the pic!
__________________
Lets talk not shout...
London Property Management
Get Healthy People!
Reply With Quote
     
     
  #109  
Old Posted Jun 14, 2019, 6:41 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,905
Concrete footings poured for next building on Shore Rd. Even have the base for a tower crane set.
Reply With Quote
     
     
  #110  
Old Posted Jun 21, 2019, 10:44 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,905
Tower crane went up today.
Reply With Quote
     
     
  #111  
Old Posted Jul 2, 2019, 10:01 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,905
Sifton took down the tower crane for the 10s apartment building today. The new building still is working on the underground level and pouring footings.
Reply With Quote
     
     
  #112  
Old Posted Jul 18, 2019, 9:36 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,905
Alot of concrete pours for L1 level of the retirement building. Should be forming the ground level slab within the next few weeks.
Reply With Quote
     
     
  #113  
Old Posted Jul 23, 2019, 11:15 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,905
4 story office building floors were all lit up on the weekend. Any indication of whether they have leased any space to tenants yet.
Reply With Quote
     
     
  #114  
Old Posted Aug 3, 2019, 8:15 PM
K85's Avatar
K85 K85 is offline
Sanity merchant
 
Join Date: Dec 2010
Posts: 549
Taken yesterday

Reply With Quote
     
     
  #115  
Old Posted Aug 21, 2019, 7:19 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,905
Still forming L1 foundation walls and posts for the retirement building.
Reply With Quote
     
     
  #116  
Old Posted Aug 27, 2019, 9:43 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,905
Reply With Quote
     
     
  #117  
Old Posted Sep 6, 2019, 7:54 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,905
Progressing on exterior brick on east side of apartment building. Retirement home is still in the pit working on the foundation posts and walls. They haven't yet poured the L1 floor slab. The office building appears vacant with no action on any tenants as of yet. Sifton may be asking too much per sq meter at this point.
Reply With Quote
     
     
  #118  
Old Posted Sep 9, 2019, 8:30 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,172
Quote:
Originally Posted by jammer139 View Post
Progressing on exterior brick on east side of apartment building. Retirement home is still in the pit working on the foundation posts and walls. They haven't yet poured the L1 floor slab. The office building appears vacant with no action on any tenants as of yet. Sifton may be asking too much per sq meter at this point.
No question they are asking to much, but they do not seem to mind at the moment. I think they are getting so many incentives to build this community that will be sit on space for when the demand is there.
Reply With Quote
     
     
  #119  
Old Posted Sep 10, 2019, 12:54 AM
Djeffery's Avatar
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,204
The electronic sign up on the side of the new office building has as one of its rotating messages "West 5 Physio Now Open". But not sure if that is in the new building or the existing Sifton building. The building certainly does look empty from the front, but I haven't looked at it from the west side after dark when the building is all lit up to see if there is anything on that side.
Reply With Quote
     
     
  #120  
Old Posted Sep 11, 2019, 7:36 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,172
Quote:
Originally Posted by Djeffery View Post
The electronic sign up on the side of the new office building has as one of its rotating messages "West 5 Physio Now Open". But not sure if that is in the new building or the existing Sifton building. The building certainly does look empty from the front, but I haven't looked at it from the west side after dark when the building is all lit up to see if there is anything on that side.
For some reason I thought there was at least 1 secured tenant for the 4 story office building but now I am questioning myself.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 5:02 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.