Quote:
Originally Posted by J.OT13
That would have added hundreds of millions to the overall cost. That means it would have taken many more years to extend the line further out. And before someone says something about "at least it wouldn't cross the Greenbelt", chances are the urban area would have been sacrificed to get to the suburbs (i.e. fewer stations).
It's important to note that the platforms, as in the floors, will be heated. This might help keep the stations a little warmer than the Transitway predecessor.
|
I disagree that it would have been more than 10% max. Probably not even half that in real life.
It was estimated at $10 million per station by the TTC to install platform edge doors in 2010. But it would have been far easier and cheaper for Ottawa, to build enclosed platforms from scratch, with platforms originally designed to carry the edge wall or screen weight.
And since heavy rail trains have much higher capacity, shorter trains (and shorter stations) would meet Ottawa's needs for decades. A four-car Movia (TTC Rocket) would have a max crush capacity of just under 1000 pax, with 250+ seated, at just under 100m in length. Compare that to 700 pax in 100m long Citadis.
Improved operational costs would offset that added capital. Fully automated operation. No issues with debris from the platform ending up on the tracks. No risk of disruption from track incursions at stations. And possibly increased ridership from a higher quality of service.
For some crazy reason they (planners and council) didn't think Ottawa was ready for a "subway". Nor did they imagine a frequent service. I think they mostly envisioned a drop-in replacement for the Transitway. But then they ended up building much more anyway.