Quote:
Originally Posted by TheMatth69
I don't get Watson's desire to expend the C-line passed to Green Belt. It just wouldn't be reliable in the long term. The advantage of a Light-Metro or even Heavy Metro is to serve heavily dense areas where ridership in stations is pretty constant throughout a day. Such a network going out in the suburbs would mean that these stations would be empty during most of the day and after 8pm. That's not what you're looking for when you build an LRT or a Metro.
|
This is a very simplistic viewpoint. There's no need for your system to be busy all day to be worthwhile. And you most definitely don't want your trains leaving their terminus (or immediate thereafter) full. That's a recipe for significant overcrowding down the line.
Also, in Ottawa's case, it's mostly existing Transitway being converted and/or replicating Transitway routes. This is replacing a network of routes with lower utility ratios caused by tons of deadheading during the morning rush, with all day two-way service that is fully electrified. Running costs of the LRT should be cheaper while adding capacity. And all the remaining bus routes terminate earlier, allowing OC Transpo to either save on feeder bus service costs or to boost service.
Quote:
Originally Posted by TheMatth69
The long C-Line like Watson wants would only result in long term problems like, delay, undercapacity on the line's main trunk and any problem at one point of the line would impact the whole network passed the Green Belt. In Paris Line 13, is the longuest line, has two branchs and goes into suburbs. Result, it's the most overcrowded line in the entire network and has the most delays during rush hours and I know many cases like this one.
|
Comparing Paris to Ottawa? Really?
There's just no valid reason to worry here. A problem on one of the branches is actually easier to compensate for than a problem on a straight line that blocks service beyond a certain point. And capacity should not be an issue if the system is sized for max capacity at peak. Which they say it is.
Quote:
Originally Posted by TheMatth69
There's a solution much cheaper and much more appropriate. Build a real and efficient Commuter Train network! We have tracks going to Stittsville, North of Innovation, East to Vars and even South to Rural communities. Why not use them. The only real expense would be buying the tracks from CN, trains and station. That's what we should aim for. Commuter train are more flexible, because you don't have to run them at a high-frequency during 18 to 21 hours a day like the C-line. It's the best way to deal with Ottawa's high In/Out bound commuting.
|
You are worried about delays and propose a system that would have to be run on rail corridors not owned by OC Transpo? How well do you think that would go?
Also, the goal here is to provide suburban service that approximates the existing Transitway services that are there. Having suburban buses feed suburban rail stations with 30 min frequencies just isn't going to work in an Ottawa where even the suburbs are used to higher frequency services.
There's also the issue of cost and access to the core, which others have covered..... Hardly trivial.