Quote:
Originally Posted by passwordisnt123
I think we should prioritize double-tracking the Trillium line as a matter of principle. Unfortunately that doesn't seem to be the priority for the city. So, given the city's current half-assed and neglected approach to the Trillium line, we're going to have to make some tough choices. (Almost) Everybody in the NCR needs occasionally to get to and from the airport. That should have been the operational priority from the start even if it meant sacrificing ridership in the southern suburbs.
Should the "needs" of the relatively small number of people who live in Riverside south or Leitrim outweigh the needs of literally everybody else in the entire capital region to have access to our airport?
|
None of this makes any sense. The ridership on the main Trillium Line is literally more than 10 times higher than the airport spur. Why would you sacrifice the ridership of 90%+ of the line, to help the 10% or less going to the airport? Why is everyone obsessed with the airport? Studies show that airports are horrible at generating public transit trips. The best trip generators are employment nodes (including universities), followed by residential density. Airports are at the bottom of the list.
So why is everyone obsessed with getting to the airport? How often do you go to the airport? Once a year? Less? Annual vacation? We should spend hundreds of millions on a LRT extension to a low ridership airport, and on top of that, you want to sacrifice service on the main line, to serve a low ridership airport? Why on earth is everyone obsessed with the airport? I don't get it.
Not to mention that the Trillium Line already has very low frequencies for a "rapid transit" rail line. 12 minutes is already pretty bad. Alternating trains would lead to 24 minute frequencies for both the main line and the airport spur. That would make all trips take longer. Transfers don't make trips longer, low frequencies do, much more so than the former.
Double tracking and electrifying the Trillium Line would have added over a billion dollars to the already high cost of the expansion. Can we really justify 1 billion EXTRA dollars? Here's some ridership stats, PPHPD = People per direction per hour.
Stage 1 Confed: 10,700 PPHPD
Stage 2 Confed: 15,000-18,000 PPHPD, with final capacity for 24,000 PPHPD
Existing Trillium: 1400 PPHPD
Stage 2 Trillium: 2800 PPHPD
Isn't it obvious that our limited transit dollars shouldn't be used on the Trillium Line? At least not for double tracking or reducing service on the mainline to support a low ridership airport spur.