Quote:
Originally Posted by azsunsurfer
We still have so much underutilized land along the existing line. Instead of chasing sprawl can we not just emphasize "growing" from the existing line?? 27 miles? That's longer than some European cities entire metropolitan areas. Can that be the catalyst of showing the benefits of future phases in the long run?
|
How is running a line down South Central, Capital Mall and Metrocenter chasing spawl? Not sure what you are referring to here. These are all older developed and more urbanized areas. There's also not that much land along the current line that is underutilized and any land that is not yet developed has current plans for development (i.e. along Apache in Tempe and Mesa).
Also, 27 miles is not that much. In comparison, Salt Lake City has 45 miles of track, LA has 105 miles, Denver has 59 miles, San Diego has 54 miles, Atlanta has 48 miles...I could keep going on and on. We are at about half the distance of the average LRT system in the US.
On a side note, I spoke with a co-worker who lives in Ahwatukee just a few minutes ago and he voted no on 105. His reasoning? He's done the math and he would save money in gas and have about the same amount of travel time if he could park at Baseline and Central and take the LRT up Central to our building instead of taking I-10 the entire distance and sitting in mass rush hour traffic.