Quote:
Originally Posted by ssiguy
I think you guys are missing a few valid issues.
First, the Valley Line could become a truly regional connector and not just SoF. It could be easily extended over the Fraser to stop at , for example Sapperton, and then run express to Broadway and then terminate at Waterfront. This would give the people SoF far superior access to the city than a SkyTrain would. SkyTrain to Langley will be a lot of things but to those going to Vancouver, fast is not one of them. It will take at LEAST 50 minutes to get from LC to downtown. It would also help relieve {or at least halt} further capacity issues on the current Expo Line.
Second, if the SkyTrain is better for people going downtown/inner city to Langley and Metro wants to encourage it then that will mean a massive upgrade to all Expo stations to 110 meters to allow for longer trains to meed demand. That is an inevitable expense that SkyTrain proponents are ignoring.
Third, a SkyTrain does absolutely, positively nothing to relieve the congestion on HWY#1 nor serve any post-secondaries or major employment centres outside downtown Langley. That leaves 2 Kwantlen campuses, Trinity Western, 2 UCFV campuses unserved as well as absolutely no service to the massive employment area of Glouster Industrial Park which currently doesn't have a single bus.
Fourth, SkyTrain will completely bleed dry and further monies for other needed projects SoF. The $2 billion difference between a 16km SkyTrain and an 80 km Surburban rail means that extra $2 billion won't be available for any improved services to Guilford, South Delta, Newton, White Rock, Gloucester, to say nothing of Abby/Chill. No B-Lines, no Transitways, no LRTs, no express buses, no new transit centres.
Fifth, SkyTrain/Metro cost more per-rider the further out to the suburbs they go...……...diminishing returns. This is why very few cities extend Metros/subways into suburban area, they simply don't have the density {population, academic, and employment} to support it. Cities hence provide more suburban rail type systems to serve those areas such as Toronto's GO/RER. They make far superior use of existing infrastructure and can cover far greater areas and populations than a single Metro...…….far more bang for the buck.
|
Okay, let's do this point by point.
First, the most realistic schedule for Rail for the Valley is twice or thrice a day, and even just the SoF segment takes almost three hours to get to Chilliwack. It'll have to slow down considerably for the downtown segment while it crosses the street grid, and/or stop entirely for a considerable amount of time while a freight train passes like the WCE does. Hardly competitive with SkyTrain.
You want more? Gotta spend at least a SkyTrain's worth of funding on a tunnel downtown and a twinned track SoF. Might as well build a SkyTrain instead.
Second, most Langley riders get out at Surrey; that's where the jobs are. There's hardly going to be a sudden surge of riders going all the way downtown, there's going to be a trickle as SoF gets bigger and bigger. That's what the platform upgrades and additional trains are for. 110m platforms is a problem for 2049's TransLink, not 2019's.
Third, exactly what difference will the Valley's three trains a day make to Valley congestion? Even twice the FVX service is a smarter investment.
OTOH SkyTrain every two minutes provides connectivity and capacity for increased transit in the region, and takes traffic away. Drivers from Guildford, Fraser Heights, Fort Langley and Aldergrove can opt to take improved bus service to the SkyTrain. The FVX can stop at Langley and head back, improving frequency and thereby attracting more riders. Every driver switching to transit is one less on Highway 1, so the goal should be a system that attracts as many drivers as possible. TransLink's run the numbers, and it turns out, hey whaddya know, that's SkyTrain.
Fourth, additional bus service is already funded in the Ten Year Plan; the rail projects are just the big ticket items. SkyTrain can relieve the bus system, and can break even and help fund additional bus service. Valley rail will have no passengers, will not integrate with or complement existing transit, and will be a money sink for its entire lifespan.
Fifth..... again, I believe the same was said about Burnaby and New West. Look at them now. Surrey and Langley will grow into city centres in their own right with or without rapid transit, and the last thing we need is to intentionally underbuild their network like we did the Canada Line. Won't make that mistake again, that's for damn sure.