Quote:
Originally Posted by roger1818
It has been hot but it isn’t uncommon for us to get a few days like this in July. It just goes to show how hard it is to design around the temperature extremes we get. Increasing the amount of shade on the ROW would help a lot (there is a reason why railways would plant trees beside their tracks).
|
Good Day.
The issue of rail (and by extension, OCS) reaction to both high and low temperature has been pointed out before, and still obviously remains a concern..... this occurrence of OCS, and just previous was mentioned rail warpage, raises just how they designed for the extremes - which were part of the contract conditions. They (presumeably) got it right at the Hurdman over the Rideau bridge, where they have rail slip joints at all 4 rails at both ends (unless this was where the warpage was ?) and so, did they :
a) not design enough give in the rails through the curves , or,
b) not place enough slip joints,
throughout the alignment to accommodate for rail expansion / contraction.
Now I know that even heavy mainlines have difficulties in this type of weather, but my point remains - that this is a more limited area (Ottawa proper) with more well-defined parameters of temperature and weather to be accommodated, by a far more localized and frequent operations and maintenance surveillance.
To me, it shows another cheap-out, and edge-cutting construction cost .vs. ongoing maintenance performance-penalty cost trade-off.
As for the OCS...... I would sincerely hope that it is a one-off slip-up in the installation quality, a bug to be rectified, and move on. The rail is more serious and concerning.
IMO.