Quote:
Originally Posted by dharper
Geez Louise, is the construction on this project slow. In the last 2 months there is only a few workers visible on the whole project. A fraction of the workers that use to be visible on it. I don't know if something is taking longer than expected, but the 2 traffic diversions under the 216 overpass desperately need their lines repainted, as they disappear when driving through there at night when it is raining.
|
We drove through on a rainy night and there were virtually no painted lanes. In fact you see the old lane marker imprints easier at night, which throw drivers off and almost cause collisions. This is totally unacceptable.