Phase I has changed somewhat with the new office building on East Chaudière set to start construction this fall. The project had a slow start, but it's picking up.
Reply With Quote
     
     
  #702  
Old Posted May 28, 2019, 10:39 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,365
There was also the whole water from the river almost breached a lot of the area thingy during the spring...likely stalled a lot of progress for a week or more...
Reply With Quote
     
     
  #703  
Old Posted May 29, 2019, 12:53 AM
danishh danishh is offline
Registered User
 
Join Date: Dec 2013
Posts: 429
Zibi at sunset, May 28 2019
https://imgur.com/a/ZiaAhow


Last edited by harls; Jul 6, 2019 at 1:08 AM. Reason: too huge. Added h to your url.
Reply With Quote
     
     
  #704  
Old Posted May 29, 2019, 1:19 PM
OTownandDown OTownandDown is offline
Registered User
 
Join Date: Jul 2018
Posts: 1,637
Quote:
Originally Posted by Davis137 View Post
There was also the whole water from the river almost breached a lot of the area thingy during the spring...likely stalled a lot of progress for a week or more...
Actually I went for a walk a day after the peak. The hydro dam was sandbagged, but other than that it was a good 5 feet from the street-level at the western point. I think the ring dam controls immediate water levels surrounding the site quite well.

Also, regarding schedule, there was that whole 'Algonquin Land' court battle thingy over the last several years.
Reply With Quote
     
     
  #705  
Old Posted Jun 12, 2019, 2:38 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,399
Quote:
Originally Posted by Kitchissippi View Post
I think Hydro Ottawa had to rebuild that bridge as part of their project since it is part of the dam's water control. The last 50 feet is hinging on the Zibi development. I heard it might not open until next year at the soonest. I believe it all gets transferred to the NCC at the end, but they don't like to take ownership until it's all completed, so it might be caught in a liability limbo.
Noticed today they are working on it. Nice. Hopefully it opens sooner rather than later.

Reply With Quote
     
     
  #706  
Old Posted Jun 24, 2019, 7:58 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
New York real estate firm taps Zibi development for first Canadian property

David Sali, OBJ
June 24, 2019


Zibi announces separate deal to supply office space to federal government


The federal government will lease space from Zibi's forthcoming office building starting in 2021.

A company that rents communal living spaces in major cities such as New York and Los Angeles has chosen Ottawa’s Zibi mixed-use development for its first project outside the United States.

New York-based Common announced Monday it will open a 24-storey, 252-bed rental housing complex at Dream Unlimited’s Zibi redevelopment project on the Ottawa River. Common currently owns properties in Chicago, Los Angeles, New York City, San Francisco, Seattle and Washington, D.C., and plans to expand to more than a dozen in the U.S. and foreign markets over the next three years.

“Cities are facing similar housing challenges throughout the world ​– urban populations are rising, and housing supply is not keeping up,” Common’s founder and CEO, Brad Hargreaves, said in a statement.

“With Dream and their Zibi development, we have found a fantastic partner with a longstanding history in Canada and an unparalleled location to bring co-living to Ottawa.”

The company said its Ottawa project will feature a mix of co-living suites – where residents have their own bedrooms but share other facilities such as bathrooms, lounges and kitchen space – and traditional apartments. The building will also include a rooftop patio and a gym.

Common says rents at the new complex will start at about $1,225 a month for a bedroom in a co-living suite, which it claims is about 30 per cent less than the going market rate for a one-bedroom apartment in the area. Rents for traditional residential units will start at about $2,065 a month.

The project is expected to be completed in 2022 and will also include “local retail” on the ground floor, the company said.

“Common is a great way for people to be able to live affordably in the centre of the most urban cities and neighbourhoods in homes that are fun and exciting,” Dream president Michael Cooper said in a statement.

Since opening its first co-living space in New York City in 2015, Common has grown to more than 800 rooms in 27 buildings in the U.S. The company recently announced a US$300-million expansion into four more cities south of the border, with plans to add units in several other cities, including 500 rooms in Toronto.

Zibi also announced Monday it has signed a 15-year agreement to supply office space to the federal government – the first major commercial lease deal at the 34-acre development.

Under the agreement, the feds will lease about 158,000 square feet of space in an eight-storey, 185,000-square-foot Class-A office building next to Chaudière Falls. The building is expected to be ready for occupancy in early 2021.

A partnership between Dream Unlimited, Dream Hard Asset Alternatives Trust and Ottawa-based Theia Partners, the $1.5-billion Zibi project is expected to include more than four million square feet of residential, retail and commercial development once complete, along with eight acres of riverfront parks and public plazas.

Zibi’s first residential condo opened in the fall of 2018, with the second expected to be ready for occupancy early next year. The entire development, which is located at former industrial lands on Chaudière and Albert islands, is eventually slated to house up to 5,000 residents and employ 6,000 people.

https://obj.ca/article/new-york-real-estate-firm-taps-zibi-development-first-canadian-property
Reply With Quote
     
     
  #707  
Old Posted Jun 24, 2019, 11:49 PM
UrbOttawa UrbOttawa is offline
Registered User
 
Join Date: Oct 2014
Posts: 415
Quote:
Originally Posted by J.OT13 View Post
New York real estate firm taps Zibi development for first Canadian property

David Sali, OBJ
June 24, 2019


Zibi announces separate deal to supply office space to federal government

A company that rents communal living spaces in major cities such as New York and Los Angeles has chosen Ottawa’s Zibi mixed-use development for its first project outside the United States.

New York-based Common announced Monday it will open a 24-storey, 252-bed rental housing complex at Dream Unlimited’s Zibi redevelopment project on the Ottawa River. Common currently owns properties in Chicago, Los Angeles, New York City, San Francisco, Seattle and Washington, D.C., and plans to expand to more than a dozen in the U.S. and foreign markets over the next three years.


https://obj.ca/article/new-york-real-estate-firm-taps-zibi-development-first-canadian-property
not too shabby! Judging by the Gatineau skyline in the background, and the columns in the plaza my guess would be that this is across from the new Kanal building?

(sorry about the size, not sure how to scale it down)





source

Last edited by UrbOttawa; Jun 25, 2019 at 12:02 AM.
Reply With Quote
     
     
  #708  
Old Posted Jun 25, 2019, 1:24 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Estimated completion date for the office tower is late 2020. That seems very ambitious. The only way they could achieve that is if they start building now using steel frame construction and no parking garage.

The renal tower's 2022 is more realistic.

Glad to see these projects going forward. Some good quality architecture at last.
Reply With Quote
     
     
  #709  
Old Posted Jun 25, 2019, 2:30 AM
kwoldtimer kwoldtimer is offline
Registered User
 
Join Date: Jan 2008
Location: La vraie capitale
Posts: 26,251
Ottawa finally getting a Balzac's?
Reply With Quote
     
     
  #710  
Old Posted Jun 25, 2019, 6:19 AM
Nowhere Nowhere is offline
Registered User
 
Join Date: May 2018
Posts: 228
$1,225 for a room and $2,065 for an apartment...

This forum may love hating on Claridge, but there's a reason they're so successful. Claridge understands that most people aren't willing to pay such insane housing costs to live in a building that looks like a museum.
Reply With Quote
     
     
  #711  
Old Posted Jun 25, 2019, 2:57 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,399
Quote:
Originally Posted by UrbOttawa View Post
not too shabby! Judging by the Gatineau skyline in the background, and the columns in the plaza my guess would be that this is across from the new Kanal building?
Looks like they are building it in place of a 4-storey hotel which they were planning to build it somewhere in phase 5 originally.
Also interesting that the announced office tower next to the Kanaal building was supposed to be residential in the master plan.

Reply With Quote
     
     
  #712  
Old Posted Jun 26, 2019, 1:53 AM
silvergate's Avatar
silvergate silvergate is offline
Registered User
 
Join Date: Apr 2014
Location: Ottawa
Posts: 629
Quote:
Originally Posted by Nowhere View Post
$1,225 for a room and $2,065 for an apartment...

This forum may love hating on Claridge, but there's a reason they're so successful. Claridge understands that most people aren't willing to pay such insane housing costs to live in a building that looks like a museum.
Doubt you can find much cheaper anywhere downtown in a new build.
Reply With Quote
     
     
  #713  
Old Posted Jun 26, 2019, 4:39 AM
Nowhere Nowhere is offline
Registered User
 
Join Date: May 2018
Posts: 228
Quote:
Originally Posted by silvergate View Post
Doubt you can find much cheaper anywhere downtown in a new build.
The Claridge Onyx on Lisgar asks 1564$ for a one bedroom. They also have bachelors, but I haven't been able to find the price as they're already all leased.

You can also rent a one bedroom condo at SoBa for 1695$ beside the Canadian Museum of Nature.
Reply With Quote
     
     
  #714  
Old Posted Jun 26, 2019, 4:07 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by Nowhere View Post
The Claridge Onyx on Lisgar asks 1564$ for a one bedroom. They also have bachelors, but I haven't been able to find the price as they're already all leased.

You can also rent a one bedroom condo at SoBa for 1695$ beside the Canadian Museum of Nature.
But Onyx isn't even close to the same quality and SoBa doesn't have as good of a location (which could arguably be said for Onyx as well).
Reply With Quote
     
     
  #715  
Old Posted Jul 5, 2019, 5:00 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,706
Reply With Quote
     
     
  #716  
Old Posted Jul 6, 2019, 8:50 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
Kanaal from last week...

Reply With Quote
     
     
  #717  
Old Posted Jul 12, 2019, 2:46 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,399
Kanaal from the other side.

Reply With Quote
     
     
  #718  
Old Posted Jul 12, 2019, 3:04 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
I was at the sales centre yesterday and there are only three units left in this building and all three were cancellations that were sold and have now become available. This bodes very well for future development on the site.
Reply With Quote
     
     
  #719  
Old Posted Jul 13, 2019, 3:14 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,654
This is such a cool project as it comes together. Anyone considering a bid to redevelop Lebreton should reference them as how things should be done. On these sites (Zibi and Lebreton) the location should speak for itself and only — design and leadership should be able to sink such a project. Looking forward to strolling through this neighbourhood in a few years.
Reply With Quote
     
     
  #720  
Old Posted Jul 16, 2019, 2:16 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,399
I bike across Chaudiere almost daily and noticed yesterday they are building another footing next to the bridge for what it appears to be an adjacent pathway?

For some reason it's set to be several feet higher than the bridge itself. And on the other end they've already built these awkward stairs that are ugly and inaccessible. What the hell is going on?



Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 3:02 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.