Bank Street Underpass Multi-Use Pathway

This one seems to be flying under the radar - the NCC and city are apparently starting construction on a pathway under the south side of Billings Bridge in September - taking 8 to 10 weeks to complete.

http://ncc-ccn.gc.ca/our-projects/bank-street-underpass-multi-use-pathway-project/






Quote:
Background
This project was initiated because of cyclist and pedestrian safety concerns. Currently, there is no dedicated crossing for cyclists, and the intersection configuration does not allow for an upgrade to the at-grade crossing itself.

The proposed design provides a grade-separated crossing below Bank Street, adjacent to the abutment along the eastern shore of the Rideau River, greatly increasing pedestrian and cyclist safety. The proposed design also minimizes the impact to the Rideau River and the surrounding embankment.

Bank and Riverside Rendering (Southwest)
Bank and Riverside Rendering (Northeast)

The project will include:
  • Three-metre-wide concrete multi-use pathway below the two-year high-water mark
  • Three-metre-wide asphalt multi-use pathway above the two-year high-water mark
  • New tie-in points to the existing multi-use pathway on Riverside Drive
  • Concrete block retaining walls with limestone face texture
  • Pedestrian handrail along the full length of the retaining wall

The existing multi-use pathway at the intersection will remain in place. As the Rideau River is prone to periodic flooding, the proposed grade-separated pathway will, on occasion, need to be closed temporarily. During such flooding events, cyclists and pedestrians will be able to approach Bank Street via the existing multi-use pathway and cross at the signalized intersection.

To allow equipment and materials to be moved to and from the site, temporary lane closures may occur from time to time over the duration of the project. Construction of the multi-use pathway is anticipated to last approximately 8 to 10 weeks. Traffic disruptions on both Bank Street and Riverside Drive will be kept to a minimum.

Next Steps
Construction is expected to begin in September 2018.
Reply With Quote
     
     
  #2  
Old Posted Aug 26, 2018, 6:10 PM
kwoldtimer kwoldtimer is offline
 
Join Date: Jan 2008
Posts: 26,253
Good initiative, but very prone to flooding, no?
Reply With Quote
     
     
  #3  
Old Posted Aug 26, 2018, 6:24 PM
AuxTown's Avatar
AuxTown AuxTown is offline
 
Join Date: Apr 2006
Posts: 4,657
Quote:
Originally Posted by kwoldtimer View Post
Good initiative, but very prone to flooding, no?
Given that adjacent professional building was under water earlier this year I would say yes
Reply With Quote
     
     
  #4  
Old Posted Aug 26, 2018, 7:41 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,174
Quote:
Originally Posted by kwoldtimer View Post
Good initiative, but very prone to flooding, no?
That was my first thought. Knowing this, they'll probably build it in a way that it can't be damaged by flooding. The NCC seems very aware nowadays, as shown by the Voyageurs pathway news story a few weeks ago.
Reply With Quote
     
     
  #5  
Old Posted Aug 27, 2018, 2:00 AM
lrt's friend lrt's friend is offline
 
Join Date: Dec 2006
Posts: 12,817
This will definitely flood every year.
Reply With Quote
     
     
  #6  
Old Posted Aug 27, 2018, 2:37 PM
TheBrain TheBrain is offline
 
Join Date: Dec 2007
Posts: 298
Quote:
Originally Posted by vtecyo View Post
... As the Rideau River is prone to periodic flooding, the proposed grade-separated pathway will, on occasion, need to be closed temporarily. During such flooding events, cyclists and pedestrians will be able to approach Bank Street via the existing multi-use pathway and cross at the signalized intersection.
They mention the flooding in the initial article.

I think it's great that they are doing it this way. Would I rather have a path that would never flood? Sure. But that would require a massive redoing of the whole intersection and bridge which would never happen. The solution they've chosen provides a safe passage for what is a deadly intersection ~11 months out of the year. I think it's a good compromise to get safe infrastructure done quickly.
Reply With Quote
     
     
  #7  
Old Posted Aug 27, 2018, 3:19 PM
zzptichka zzptichka is offline
 
Join Date: Dec 2015
Posts: 2,401
Quote:
Originally Posted by TheBrain View Post
They mention the flooding in the initial article.

I think it's great that they are doing it this way. Would I rather have a path that would never flood? Sure. But that would require a massive redoing of the whole intersection and bridge which would never happen. The solution they've chosen provides a safe passage for what is a deadly intersection ~11 months out of the year. I think it's a good compromise to get safe infrastructure done quickly.
I suppose 5 years that they've been talking about it, is indeed quickly by NCC standards.
Reply With Quote
     
     
  #8  
Old Posted Aug 27, 2018, 3:43 PM
roger1818's Avatar
roger1818 roger1818 is offline
 
Join Date: Feb 2016
Posts: 6,610
Quote:
Originally Posted by TheBrain View Post
They mention the flooding in the initial article.
From https://www.oldottawasouth.ca/news/item/5999-swallows-delay-underpass-construction

Quote:
The existing multi-use pathway at the intersection will remain in place, allowing cyclists and pedestrians to cross when spring flooding forces the closure of the underpass.
Given that they know it will flood, they are hopefully building it in such a way that it will survive a flood.

Quote:
I think it's great that they are doing it this way. Would I rather have a path that would never flood? Sure. But that would require a massive redoing of the whole intersection and bridge which would never happen. The solution they've chosen provides a safe passage for what is a deadly intersection ~11 months out of the year. I think it's a good compromise to get safe infrastructure done quickly.
Agreed.
Reply With Quote
     
     
  #9  
Old Posted Aug 27, 2018, 4:37 PM
dougvdh dougvdh is offline
 
Join Date: Jun 2017
Posts: 376
Quote:
Originally Posted by TheBrain View Post
. . . The solution they've chosen provides a safe passage for what is a deadly intersection ~11 months out of the year. . . ..
7-8 months of the year - the MUPs that it connects to are snow storage from December to March, and it will flood in April (and sometimes early May).
Reply With Quote
     
     
  #10  
Old Posted Aug 28, 2018, 12:52 AM
Catenary Catenary is offline
 
Join Date: Dec 2012
Posts: 1,403
Clearing and grubbing for this project actually started back in May IIRC. The project was delayed until now for environmental reasons I believe.

Though the path will flood, the existing path will remain to access Bank Street and provide backup when needed, which is nice to see.
Reply With Quote
     
     
  #11  
Old Posted Sep 6, 2018, 8:54 PM
danishh danishh is offline
 
Join Date: Dec 2013
Posts: 430
I really like this idea. Safety (and improved traffic flow for drivers) for 8 months of the year is better than just doing nothing. The 8 months its open will be the busiest months for ped/cycle traffic anyways.
Reply With Quote
     
     
  #12  
Old Posted Sep 7, 2018, 1:44 PM
TransitZilla TransitZilla is offline
 
Join Date: Dec 2006
Posts: 2,801
Quote:
Originally Posted by Catenary View Post
The project was delayed until now for environmental reasons I believe.
There were some nesting barn swallows that delayed things. (http://www.capitalward.ca/index.php/ward-newsletter/latest/1906-may-2018#anchor6)

Construction is supposed to start this month; I haven't been by there in a couple of weeks.
Reply With Quote
     
     
  #13  
Old Posted Jul 1, 2019, 3:50 AM
vtecyo vtecyo is offline
 
Join Date: Feb 2015
Posts: 332
This looks to be nearly complete - I'd guess within a week or two. There are still construction fences blocking the path - but it's paved and to my eye the only thing that looked unfinished was the landscaping.

Don't tell anybody... but I went around the fence and used it anyway...
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Urban, Urban Design & Heritage Issues
Forum Jump



Forum Jump


All times are GMT. The time now is 8:16 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.