Quote:
Originally Posted by lrt's friend
So much for the Stanley Cup monument as well.
|
A tremendous loss
Quote:
|
A tramway that will shrink Confederation Square is also a no go. So using Sparks gets Gatineau passengers no further than Lyon Street.
|
I posted a sketch-up of what a Sparks-Rideau alignment could look like without significantly impacting the size of Confederation Sq. We have to remember that there is actually a lot of redundant roadspace in that area. Think two-block lane for parking a seasonal amphibus.
Quote:
|
Transfers between local buses to Rapibus, in Hull and at Lyon Street requiring a block walk?
|
I mean, keep in mind that the distance between Queen and Sparks is about 50 metres. I'd be much more concerned about the distance between the metro platforms and the surface, which is likely to be a bigger dissuasion to transferring for anyone going less than a few stations.
I would agree that you'd want to avoid forcing a Lyon transfer, which is why I think the STO should continue rapid transit service at least as far as the eastern CBD (O'Connor, Metcalfe, Elgin area).
Quote:
|
Is nobody thinking about the customers? Needing more LRVs just from Hull to Lyon Street to accommodate Rapibus transferring passengers and a massive transfer station that close to downtown. What kind of logic is this? The size of that Hull station can only be contained by not running local buses to that transfer station.
|
The logic is that the STO's ridership is growing by leaps and bounds (15% increase over last year alone), and is outstripping the capacity of at-grade buses. We need to start moving to a higher-capacity mode for trunk routes.
Running local buses along the Rapibus is an interim solution until that Eastern trunk is also converted to LRT, kind of like a better Tunney's pre-Phase 2. Better, because instead of having almost everyone needing to transfer like Tunney's or Blair, only about half will be going any further than Hull.
But here's the bottom line: in 10 years (the STO's objective for this project), the STO's ridership between Hull and Ottawa will be too high for it to be effectively served by buses at peak. We can eke out an extra year or two here and there with some band-aid solutions (all-door boarding, lane reconfigurations, etc.), but the reality is that a higher-capacity mode will be necessary. There are a million reasons why one scenario will be more or less difficult or desirable than another, but anything that involves buses doing the heavy lifting between cores on the surface or a transfer-less ride downtown at peak will just not be geometrically possible.