HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast > Atlanta


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted May 17, 2019, 5:37 PM
MARTAisSmarta MARTAisSmarta is offline
Registered User
 
Join Date: Jul 2017
Posts: 263
Quote:
Originally Posted by montydawg View Post
They usually do this with road striping. A crew will come in and mock up the striping to get drivers used to the new road pattern right after paving. A dedicated team and separate crew will come in and do the permanent striping sometime later, sometimes a few weeks later.
There is a city/state requirement for a waiting period between asphalt paving and thermoplastic striping
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast > Atlanta
Forum Jump



Forum Jump


All times are GMT. The time now is 9:38 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.