Quote:
Originally Posted by Migrant_Coconut
They're overhauling Arbutus & 41st to accommodate the B-Line. When even Kerrisdale is on board with the changes, then no, there's not much chance of anybody else getting in the way.
|
Well, in this case, it's just queue jumpers in Kerrisdale.
Remember when they were saying the 98B would destroy the neighborhood?
Quote:
Originally Posted by VancouverOfTheFuture
the ROW there is already wide enough for sidewalks and 8 lane of traffic. get rid of parking, as there shouldn't be any on arterial's at all anyways, and there is enough space for the lanes needed.
|
Quote:
Originally Posted by logan5
As long as the stretch of 41st around Oakridge is being redeveloped, they should be planning for dedicated bus lanes in the median. Looking at the development so far, the new buildings aren't stepped back to provide for this. With the ongoing redevelopment of 41st, and the introduction of a B-Line route, you would ultimately want to provide an actual rapid transit service. It's quite likely we will see the redevelopment of most of the stretch of 41st from Joyce Station to UBC, so this would be a realistic long term goal.
|
41st is only 8 lanes total at its widest parts. Deeper into Point Grey, say Dunbar St., it's only 4 lanes wide.
Median bus lanes would require median bus stops and road reconstruction, and then you're basically asking for BRT, which there's not money for.
They need to extend the bus priority lanes to the rest of Point Grey westbound, not just eastbound, and turn the excess centre lane between Dunbar and Kerrisdale into a left-turning lane (or remove a lane on westbound to turn into a bus lane, and leave a parking lane, whichever's more palatable.