Quote:
Originally Posted by Vin
(1) And does the city enjoy having the trains sit in there and impede traffic flow? Doesn't the city want something of a win-win? I thought a meeting between feds and local government to solve problems is what governments are supposed to do?
(2) No, it won't be halfway into their yard: it would encroach the yard at around William Street but not halfway. Plus since the trench is relatively narrow, there is still ample storage space on both sides of the yard.
(3) Union is close enough to Venables to not render any longer trench. Look at the map! The two streets are only 55m apart.  . So yeah, no additional roads will be closed don't be so dramatic.
(4) This is not to save just one right turn, but a couple of right turns, and also to save the costs of having a new road bridge while other roads still have on-grade railway crossings that can be made worse once double tracking occurs.
|
1. No, the federal government has much bigger issues than forcing a railroad servicing Canada's biggest port to trench their lines since Vin doesn't want to build a bridge.
2. Yes, it would be halfway into their yard. The 600m you claim to have takes it well into the yard to Grant as I said before. At 500m the bare minimum needed to hit the grade, it is between Grant and Charles.
This means that a decent portion of CN's shunting yard is now on a slope and unusable for storage. Given that this is their only yard immediately supporting their port operations, why would they do this?? They clearly wouldn't. Also to get their trains in storage north to the port they would need to back them up to the trench entrance then run them forward to get into the trenched portion. This would be an operational nightmare and once again this is a non-starter, they would NEVER agree to this.
3. You have two choices, continue the trench under union at 21 feet deep, and ramp up after union. This means the 500 m needed to get back up to grade is now putting you out past Raymuir, so no I'm not being dramatic, it's a grade issue at Raymuir or a grade issue at Union. The other option is closing Union, but now were again closing another road, and this one happens to be the City's main E/W bike-route. Don't see this happening.
4. You're not saving any costs here. This is a very expensive solution and there's a reason the professional engineers who do this work did not advocate this solution, it's inferior to the bridge. It causes many issues for both the surrounding roads and the rail operations, all for limited cost savings to a potential increase, all of which the bridge does not incur. Also Prior is a terrible street, it is too narrow, fronts residential, and has many crossings. The new road makes much more sense.
Anyway this is all moot because CN, and the other rail operators would never play ball, ever. They would tell you to build the bridge and continue on with their day. So I'm going to stop arguing about a situation that could never occur due to the limitations of the railroads and go out and enjoy my weekend. I suggest you do the same.