HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


Reply

 
Thread Tools Display Modes
     
     
  #641  
Old Posted Mar 12, 2019, 6:29 PM
Multi-modal Multi-modal is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,154
Quote:
Originally Posted by zzptichka View Post
Interesting that they appear to be cantilevering a sidewalk off the west side of the bridge. That will be a big improvement.
Reply With Quote
     
     
  #642  
Old Posted Mar 12, 2019, 6:34 PM
zzptichka zzptichka is online now
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,381
Quote:
Originally Posted by Multi-modal View Post
Interesting that they appear to be cantilevering a sidewalk off the west side of the bridge. That will be a big improvement.
This graphic is from 2015 and in the renders above it's hard to see the sidewalk, so I'm not sure about that.
Reply With Quote
     
     
  #643  
Old Posted Mar 13, 2019, 1:24 PM
OTownandDown OTownandDown is online now
Registered User
 
Join Date: Jul 2018
Posts: 1,628
Quote:
Originally Posted by zzptichka View Post
That's what I thought.
Hopefully they can at least install flexi-posts in the summer and allow sharing sidewalk with pedestrians during the winter.
I bike through here all the time in the summer, and never have a problem with the actual bridge. Its the 4-lane configuration due south of the bridge that's the problem.

When crossing the bridge, there's lots of space for everyone, a good 6 feet between me and the car in my lane. South of that, four small lanes is not conducive to sharing a lane.

Also, is the 'split bridge' west side permanently closed?

Follow my logic here about the lanes on the crossing. The pinch point is the bridge, at two traffic lanes. So why not just make the entire thing two lanes wide, and have turning bays at every intersection?
Reply With Quote
     
     
  #644  
Old Posted Mar 13, 2019, 2:18 PM
zzptichka zzptichka is online now
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,381
Quote:
Originally Posted by OTownandDown View Post
I bike through here all the time in the summer, and never have a problem with the actual bridge. Its the 4-lane configuration due south of the bridge that's the problem.

When crossing the bridge, there's lots of space for everyone, a good 6 feet between me and the car in my lane. South of that, four small lanes is not conducive to sharing a lane.

Also, is the 'split bridge' west side permanently closed?

Follow my logic here about the lanes on the crossing. The pinch point is the bridge, at two traffic lanes. So why not just make the entire thing two lanes wide, and have turning bays at every intersection?
That's what they plan to do according to their original plan and no, the split bridge will re-open.

The problem I see with current configuration is not on the bridge itself but on approach. Some drivers, especially new to the area don't realize the bridge is 1-lane per direction and keep driving in two lanes squeezing in at the last second.
Reply With Quote
     
     
  #645  
Old Posted Mar 13, 2019, 6:23 PM
Gat-Train Gat-Train is offline
BANNED
 
Join Date: Nov 2018
Posts: 508
Quote:
Originally Posted by J.OT13 View Post
Nice rendering, but that is still a very tight fit for both cyclists and pedestrians.

That bridge is shut down for weeks, sometimes months every couple years. I think its time to demolish it and build a new span that better serves all modes of transportation. After 119-192 years, it's time to move on with something that better meets our needs.
I agree, and if/when it gets rebuilt they should coordinate with Ottawa and Gatineau to put some tram tracks on it, or at the very least reserve space for such.
Reply With Quote
     
     
  #646  
Old Posted Mar 13, 2019, 6:24 PM
OTownandDown OTownandDown is online now
Registered User
 
Join Date: Jul 2018
Posts: 1,628
Quote:
Originally Posted by zzptichka View Post
That's what they plan to do according to their original plan and no, the split bridge will re-open.

The problem I see with current configuration is not on the bridge itself but on approach. Some drivers, especially new to the area don't realize the bridge is 1-lane per direction and keep driving in two lanes squeezing in at the last second.
Yes, that is the sketchy part. The entire road should to go two lanes in front of the War Museum, and on land in Quebec.
Reply With Quote
     
     
  #647  
Old Posted Mar 14, 2019, 8:49 PM
zzptichka zzptichka is online now
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,381
Zibi set up this website with information about rebuilding the crossing: https://transformationchaudiere.ca/
Good to see this kind of attention to details.
Not much on it yet, except this render looking the other way (in addition to the one published above):
Reply With Quote
     
     
  #648  
Old Posted Mar 14, 2019, 9:34 PM
Multi-modal Multi-modal is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,154
Quote:
Originally Posted by zzptichka View Post
Zibi set up this website with information about rebuilding the crossing: https://transformationchaudiere.ca/
Good to see this kind of attention to details.
Not much on it yet, except this render looking the other way (in addition to the one published above):
You can tell in that render that the east-west green bicycle crosswalks don't lead to any internal zibi bike lanes. That is fine, but then they need to give the edge between the bike lane and the sidewalk a smooth corner radius where it meets the cross street. It's hard to explain with words, but basically they designed it so there is a right angle corner for bikes going from the chaudiere crossing to the internal roadway and vice versa. Not hard to fix, but I doubt anyone will realize it's an issue until its built.
Reply With Quote
     
     
  #649  
Old Posted Mar 15, 2019, 1:16 PM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
I wonder if the plaza next to the bridge is a part of the project.
Reply With Quote
     
     
  #650  
Old Posted Mar 15, 2019, 5:06 PM
zzptichka zzptichka is online now
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,381
Quote:
Originally Posted by kevinbottawa View Post
I wonder if the plaza next to the bridge is a part of the project.
Yeah they are demolishing Booth Board Mill on the island. Plaza is probably termporary until they build a hotel there or something in 10+ years.
Reply With Quote
     
     
  #651  
Old Posted Mar 16, 2019, 12:54 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,943
Quote:
Originally Posted by zzptichka View Post
Yeah they are demolishing Booth Board Mill on the island. Plaza is probably termporary until they build a hotel there or something in 10+ years.
That's too bad. I guess they couldn't save it.
Reply With Quote
     
     
  #652  
Old Posted Apr 12, 2019, 5:05 PM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,408
12 april 2019

Reply With Quote
     
     
  #653  
Old Posted Apr 13, 2019, 4:27 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,943
Thanks for all the pics today!

Looks like they might not be demolishing the entire Board Mill.
Reply With Quote
     
     
  #654  
Old Posted Apr 14, 2019, 9:36 AM
Glenlivet Ave's Avatar
Glenlivet Ave Glenlivet Ave is offline
Registered User
 
Join Date: Feb 2010
Location: Ottawa
Posts: 191
Have they hinted as to which residential building will be next for sales and construction? Will there be any rental apartments in the pipelines? At this rate, this development will take an eternity to complete.
Reply With Quote
     
     
  #655  
Old Posted Apr 24, 2019, 5:08 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,628
Developers hold exclusive preview party for new Zibi House in Gatineau
Building features observational tower with views of sustainable community and redevelopment project

By: Caroline Phillips, OBJ
Published: Apr 24, 2019 2:00am EDT


Even with wet, grey skies, the views from the new observatory tower at Zibi are impressive.

Special guests were invited Tuesday to an exclusive preview of a new building that will serve as a hub for what developers hope will become one of the most eco-friendly urban waterfront communities around. It's called Zibi, which means "river" in Algonquin.

Thirty-seven acres of former industrial land are being turned into a mixed-use residential, retail and commercial space, spanning both the Quebec and Ontario sides of the Ottawa River. Once it's done, the downtown community will feature condos, shops, offices, waterfront parks and pathways.

Reaching the present construction stage has been a complex process, due to the involvement of multiple jurisdictions and government bodies, said Jeff Westeinde, one of the key developers behind the ambitious $1.5 billion redevelopment.

“I feel like I’ve been pushing a rock up a big hill for four years and it’s finally starting to roll down the other side,” Westeinde told OBJ.social at the party.

The new building, called Zibi House, is located at 25 rue Jos-Montferrand, just off Laurier Street, in Gatineau. It will serve not only as a presentation centre but also as a cultural and community centre for hosting events and for giving the public a feel for what Zibi is offering.

Tuesday’s event invited members of the media, community partners and collaborators, and prospective tenants. Zibi aims to have 50 percent of its retail space occupied by local independent businesses. “In the next six months we’ll announce some really cool partnerships,” said Westeinde.

Andrew Bassett, co-owner of Little Victories Coffee Roasters, was eyeing the space for a possible expansion. So were Carley Schelck and her husband, Oliver Schelck, co-owners of the Urban Element cooking studio and event space.

So earthy is the vibe inside Zibi House that there's even a serviceberry tree growing right in the front lobby. It's part of Zibi's efforts to reintroduce native species back to the area. Guests were served such dishes as cured salmon gravlax, presented on boughs of spruce and pine.

The building includes a series of rooms that allow the public to experience Zibi through all five senses. In one room, there’s the fresh scent of growing switchgrass while, in another, a spot where guests can taste honey that’s been harvested on the property. There's a cosy room with a cushioned seating area for listening to the music of Jeremy Dutcher, a classically-trained Canadian Indigenous tenor and winner of the 2018 Polaris Music Prize. Another of the rooms features tranquil images of moving water.

Guests were invited to take a freight elevator up to the observatory on the top floor to soak up the views, which included the Ottawa River's mighty Chaudière Falls and Parliament Hill.

Zibi House officially opens to the public next Wednesday.

[email protected]

https://obj.ca/article/developers-hold-exclusive-preview-party-new-zibi-house-gatineau

Video Link
Reply With Quote
     
     
  #656  
Old Posted Apr 24, 2019, 5:11 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,628
Zibi House VIP reception

Ashley Fraser, Ottawa Citizen
Updated: April 24, 2019



3D architectural diorama of the Ottawa River’s only 8-storey observation deck.


Views from the Ottawa River’s only eight-storey observation deck looking out to the high water levels rushing past the area Tuesday evening.

https://ottawacitizen.com/sponsored/soci...otors-of-ottawa-zibi-house-vip-reception
Reply With Quote
     
     
  #657  
Old Posted Apr 24, 2019, 10:42 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,628
Zibi House wants to be the National Capital Region's next 'destination' spot

Peter Hum, Ottawa Citizen
Updated: April 24, 2019




On the outside, it looks like a collection of dark blue shipping containers. Inside, it feels more like a sleek, tranquil spa. And when you ride its freight elevator eight storeys up, it affords you a birds-eye view of Chaudière Falls and Parliament Hill that might make you rethink the heart of the National Capital Region.

All of these aspects come together at the unique, multi-purpose facility called Zibi House, on the Gatineau shore of the Ottawa River. It opened Wednesday following a prayer in Algonquin Anishinaabe, which saluted the fact that it sits on unceded Algonquin territory.

Zibi House and its observation deck will open to the public May 1. It will be the sales centre for the 34-acre redevelopment of abandoned downtown waterfront that straddles the Quebec and Ontario border, encompassing Chaudière and Albert islands as well as a portion of the Gatineau shoreline. But it is also envisioned as a cultural centre that will attract visitors from beyond the development through varied programming such as gourmet dinners.

“This is not a regular sales centre. This is a dream centre,” said Alexander Josephson, co-founder of PARTISANS, the Toronto architecture and design firm that conceived of Zibi House.

Zibi House is a stone’s throw from the first Zibi condominium to open, a six-storey building simply called O that has sold 60 of its 70 units. Begun in 2015 and expected to finish more than a dozen years from now, the Zibi project, whose builders are Toronto-based Dream Unlimited and Ottawa-based Theia Partners, is forecast to have 5,000 residents, as well as offices and businesses, that bring 6,000 people to the property.

The project has lofty goals regarding sustainability, such that it is designated a One Planet Community, which places it among a growing global network of über-green neighbourhoods. Zibi will include eight acres of parks and public plazas, its waterfront will be publicly accessible and there will be streets that prioritize pedestrians over cars.

A public square on Zibi’s Gatineau side is to open this summer. Also this summer, the Cirque du Soleil production Alegria will be staged under its big top on the Zibi grounds.

The interior of Zibi House was designed by Toronto-based furniture and interior designer Paolo Ferrari. Ferrari has created a series of starkly different rooms, each of which is dedicated to a different sensory experience.

“We just want you to leave with a sense of joy,” Ferrari said.

The room dedicated to the sense of smell features fragrant plants and nods to local biodiversity. That room connects to the “sound” room, where Algonquin Anishinaabe music plays from an overhead dome, which in turn connects a room with mirrored ceiling and walls that is dedicated to “touch.” There, visitors can touch a screen that shows water, and which responds accordingly.

A tasting room showcases local foodstuffs — at the moment, honey made by the 2,000 bees on the Zibi site. The “sight” room is eight storeys up, at the top of the observation tower. “I never get tired of coming up here,” Ferrari said. “The sight is so majestic.”

Zibi House is to begin hosting dinners prepared by chef Jean-Philippe Cloutier, who has cooked not only at Beckta Dining and Wine, but also the world-class restaurants Noma and Atelier Crenn, said Scott Simpson, Zibi’s lead for events and community. Information regarding the dinners and other events will be posted at zibi.ca.

The abandoned industrial land that’s in the process of becoming Zibi was in the National Capital Region’s “blind spot,” Simpson said. “Nobody sees it anymore.

“We want to make this a destination.”

[email protected]
twitter.com/peterhum



https://ottawacitizen.com/news/local-new...al-capital-regions-next-destination-spot

Last edited by rocketphish; Apr 25, 2019 at 1:29 AM.
Reply With Quote
     
     
  #658  
Old Posted Apr 25, 2019, 2:13 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,943
A representative from Dream and Zibi on CTV today mentioned a "new office building this year" and "we've got our first apartment that we're gonna start in the fall in Gatineau".

https://ottawa.ctvnews.ca/new-zibi-observation-tower-offers-new-view-of-ottawa-river-1.4393592

Awesome new rendering of the entire Zibi site as proposed when completed as their Twitter page wallpaper.

https://twitter.com/zibicanada?lang=en
Reply With Quote
     
     
  #659  
Old Posted Apr 25, 2019, 2:42 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
Quote:
Originally Posted by J.OT13 View Post
Awesome new rendering of the entire Zibi site as proposed when completed as their Twitter page wallpaper.

https://twitter.com/zibicanada?lang=en
Reply With Quote
     
     
  #660  
Old Posted Apr 25, 2019, 3:19 AM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,686
I’m not sure what to think of this. It looks like a random collection of buildings and the materials seem clash with the natural setting.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 8:55 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.