Quote:
Originally Posted by Horus
Uninformed guess, but is it because the buses can't get out of the trench until Tunneys?
|
Hundreds of buses will need to put through the transitway in order to empty all those FULL commuter trains leaving downtown. HUNDREDS. Starting from only Tunneys, and not spread along the line. Imagine taking normal transitway service and just stopping it at one spot, then starting it up again.
I posted this to Westsideaction last week:
I’ve been saying this for years now. I feel sad for the Kanata commuter, to go from a direct express bus from the stix, to the future of THREE transfers and a subway station maze exit. If the train was finished it would be FAR superior to busing. But…no such luck for now.
Picture this: The end of the day (3:30pm for those Federal employees). You walk down to your station heading west, then the 600 people in your train are quickly whisked away to Tunney’s Pasture. Replacing 10 buses on the street above is great for everyone downtown. But then…EVERYONE alights at the platform at Tunney’s, resulting in a foot-race, to get to your transfer bus that will take you to Kanata. This is at best 6 buses which happen to be waiting around, empty. HOWEVER not everyone is going to Kanata and the buses may be already half-full, so we’re talking probably 15-30 destination-specific buses coming at differing frequencies. This used to be spread out through the downtown, resulting in hundreds waiting at each individual transit station downtown, now concentrated at Tunney’s Pasture. A logistical nightmare.
Lets assume your transfer bus comes every 15 minutes. I’ll illustrate the min/max passengers waiting at Tunney’s:
At 5 minutes into your wait, another 600 people arrive. (600-to-1200 people waiting)
THEN, at 5 minutes into your wait, another 600 people arrive. (600-to-1800 people waiting)
Then at 5 minutes into your wait, another 600 people arrive (600-to-2400 people waiting!!!)
The trains can run at less than 3 minute frequency (not required yet, but possible). If this were the case, up to 3600 passengers can arrive in just 15 minutes.
Has Tunney’s been built with a multi-platform, huge area for buses to queue and wait for passengers? Hopefully so, but I haven’t been there lately.
You see where I’m going with this, right?
By 4:30pm, Tunney’s pasture is a madhouse, each and every day, until the train extension arrives, pushing the madhouse out to some godawful field 1km past Bayshore mall, negating the ability to shop while you wait for your transfer or the chaos to die down.
The solution (and what I think should happen?): Kanata express commuter buses continue to operate to the downtown core for the next 10-15 years to ease the chaos at Tunney’s until the train is sufficiently extended to reduce passenger load to manageable levels at the final Transfer station.
The reality: OC Transpo will lose 50% of it’s Kanata ridership due to commuting chaos going unchecked and unsolved until the train is finished.