Old Posted Mar 23, 2019, 1:01 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
You do know they make dual mode buses? The Silver Line in Boston makes use of them. So, the arguement about ventilation is moot.

I think if we look at other bus RT, we would see that they are not nearly as high of frequency as Ottawa's. All transit modes have their breaking point. Look at Yonge Line in Toronto for proof of that. So, it is good that the city didn't build the downtown bus tunnel.
     
     
  #9842  
Old Posted Mar 23, 2019, 1:43 AM
corynv corynv is offline
Registered User
 
Join Date: Jun 2018
Posts: 171
Quote:
Originally Posted by swimmer_spe View Post
You do know they make dual mode buses? The Silver Line in Boston makes use of them. So, the arguement about ventilation is moot.

I think if we look at other bus RT, we would see that they are not nearly as high of frequency as Ottawa's. All transit modes have their breaking point. Look at Yonge Line in Toronto for proof of that. So, it is good that the city didn't build the downtown bus tunnel.
sure but then we'd need to replace a good chunk of the fleet with that, and that would cost a lot of money as well. Since none of the current buses are dual mode. Would that cost be worth it over doing an LRT? or just a diesel bus tunnel
     
     
  #9843  
Old Posted Mar 23, 2019, 1:53 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by corynv View Post
sure but then we'd need to replace a good chunk of the fleet with that, and that would cost a lot of money as well. Since none of the current buses are dual mode. Would that cost be worth it over doing an LRT? or just a diesel bus tunnel
The Transitway is about 30 years old.... Show me one bus that is that old in the fleet.
     
     
  #9844  
Old Posted Mar 23, 2019, 2:24 AM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Good Day.

I was downtown with some time to spare, so took a long look at some of the station entrances.

Lyon entrance on Queen St. from the PdV Podium bldg. :
The east side of the entrance, east of the escalator, over by the underground ramps to/from Queen St., seems to be a complete waste of space, unless they are planning a transit shoppe, kiosk, or pop-up-shop in there - in competition with PdV !! Makes no sense to me.

Lyon inside entrance from PdV mall level :
very tight - looks to me as if they do not expect very many people to use it at any one moment in time.

Parl entrance on Queen St. corner O'Connor, from 151 Queen Heritage bldg. :
Looking down through the doors, the staircase is three wide (wall, steps, handrail, steps, handrail, steps, wall). Seems to me there was room for an escalator there, on the O'Connor side of the well, unless they are expecting real crush traffic !! (yes, the angle of the new north wall makes for low headroom - that could have been accommodated by squaring out that wall.) Makes no sense - unless it was a cost-cutter.

The new bus shelters along Queen should have been 'operational' long ago, just after Queen was re-opened - just no reason for their delay.

The new northbound right-turn from Queen to Lyon :
still blocked off and 'under construction', and no action on the northern end from Sparks to Wellington for left turns from Lyon onto Wellington. Taking their time, or what !
(yes, not RTG, but part-and-parcel of delay delay delay. At the speed and inconvenience that they rebuilt Queen, they may as well have just cut-and-cover dug that part of the tunnel - cheaper.)

just my observation and opinion.

Last edited by PHrenetic; Mar 23, 2019 at 2:34 AM.
     
     
  #9845  
Old Posted Mar 23, 2019, 2:40 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,805
Quote:
Originally Posted by OtrainUser View Post
It had to be dismissed because there was no funding for a bus tunnel. If the city had the money then it would have been done.
We ultimately found far more money. For the same money as Phase 1, we could have built a bus tunnel and invested in other transit projects. For example, we could have already had the Baseline project completed and improved transit infrastructure on Carling, Rideau and Montreal Road. Because a bus tunnel would have dealt with the specific problem, and no more, we could have ended up with a better overall transit system while investing no more money. We could now be looking at projects serving Kanata and South Orleans, getting those projects completed several years earlier than we are now anticipating.
     
     
  #9846  
Old Posted Mar 23, 2019, 2:42 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,805
Quote:
Originally Posted by Kitchissippi View Post
Practically everything of the Transitway had to be ripped up and rebuilt for the LRT. What's to say that a bus tunnel would have been that cheap and easy to convert to rail?
As we have seen, there is no easy conversion, but Seattle managed to do it.
     
     
  #9847  
Old Posted Mar 23, 2019, 10:34 AM
OtrainUser OtrainUser is offline
Registered User
 
Join Date: Jul 2017
Posts: 619
Quote:
Originally Posted by lrt's friend View Post
We ultimately found far more money. For the same money as Phase 1, we could have built a bus tunnel and invested in other transit projects. For example, we could have already had the Baseline project completed and improved transit infrastructure on Carling, Rideau and Montreal Road. Because a bus tunnel would have dealt with the specific problem, and no more, we could have ended up with a better overall transit system while investing no more money. We could now be looking at projects serving Kanata and South Orleans, getting those projects completed several years earlier than we are now anticipating.
You are ignoring when the city got the funds which is my point. The city can only build with the funds they get, all of this they should have built this doesn't matter when they dont have the money for it.

I'm sure the city would have loved to build what you suggested but they couldn't because they didn't have the funds to do it. Money does matter whether we like it or not.
     
     
  #9848  
Old Posted Mar 23, 2019, 3:16 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,044
Quote:
Originally Posted by swimmer_spe View Post
The Transitway is about 30 years old.... Show me one bus that is that old in the fleet.
We had plenty of buses 10-40 years old when the N/S was cancelled. They were all scrapped when we switched to 100% accessible, which is a good thing, but brings up a lot of questions around the quality of the newer generations of buses.
     
     
  #9849  
Old Posted Mar 23, 2019, 3:27 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,691
Quote:
Originally Posted by lrt's friend View Post
As we have seen, there is no easy conversion, but Seattle managed to do it.
Except the plans for Ottawa's downtown bus tunnel were half-assed and nowhere as good as the current LRT tunnel. IIRC, it only dealt with the Albert/Slater corridor and still relied on the Mackenzie-King Bridge to the cross the canal. The grade from the bridge to 4 storeys underground at Metcalfe might be OK for a rubber-tired bus but not ideal for rail. I don't remember the details for the section between the bridge and Campus station I doubt they worked it out properly either, or just left it with at grade crossings and sharp turns.

I think the cost savings of having built the bus tunnel would have been marginal, and the throw-away infrastructure for the conversion would erase any of it. It would have also further delayed LRT, and we would have to live with the high operating costs of BRT for much longer.
     
     
  #9850  
Old Posted Mar 23, 2019, 5:04 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,805
Quote:
Originally Posted by Kitchissippi View Post
Except the plans for Ottawa's downtown bus tunnel were half-assed and nowhere as good as the current LRT tunnel. IIRC, it only dealt with the Albert/Slater corridor and still relied on the Mackenzie-King Bridge to the cross the canal. The grade from the bridge to 4 storeys underground at Metcalfe might be OK for a rubber-tired bus but not ideal for rail. I don't remember the details for the section between the bridge and Campus station I doubt they worked it out properly either, or just left it with at grade crossings and sharp turns.

I think the cost savings of having built the bus tunnel would have been marginal, and the throw-away infrastructure for the conversion would erase any of it. It would have also further delayed LRT, and we would have to live with the high operating costs of BRT for much longer.
As we saw, the LRT tunnel was relocated from the original plan. The bus tunnel never reached the point of final planning, so you are making assumptions that the plan from many years ago would have ended up being what actually would have been built. My only point is that it was dismissed based on a false assumption, that all the buses had to go through the tunnel and therefore, it would not have met our needs.

You are right that cost savings would have been marginal with a bus tunnel, but high operating costs don't matter when the massive capital costs for a rail conversion have to be repaid. It all comes from the same taxpayer pot.

I am not convinced that LRT would have been further delayed, however, it would have likely ended up with a more urban focus instead of being designed mainly for suburban commuters. It likely also would have become a semi-segregated plan more like what has been built in Calgary and Edmonton instead of a light metro.

Nevertheless, the decisions have been made, so we need to get on with it. We can't turn back the clock.
     
     
  #9851  
Old Posted Mar 24, 2019, 12:12 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,044
The question of whether a bus tunnel would have allowed us to re-invest in new transit lines is a good one, but I think the Bank-Rideau-Montreal subways, Calrling LRT, Baseline LRT or whatever you might want would have been a harder sell. It's all about politics and not public benefit. This east-west conversion and north-south upgrade goes through multiple medium to high income wards and ridings while the other projects only touch a few, mostly poorer areas. It's the same reason why Toronto's DRL hasn't picked up any steam over the last 60 years; not enough political gain.

The benefits of the Confederation Line are real. It will make it much easier and faster to get across town. Much more comfortable ride. It will open up more of the city to tourism; visitors are more willing to take trains than buses. Maintenance and operational costs will be much lower by eliminating paving, greatly reducing the number of drivers (no train drivers would have been better, but anyway), huge savings on gas. And of course, the environmental benefits can not be overstated.

The benefits of the Trillium Line as planned are more ambiguous. We're investing $800 million up-front and we're still getting sub-par frequencies. Investing in increased service to 8 minutes+ would have been more beneficial than lengthening the platforms to 80 meters. The airport spur forcing three transfers is an embarrassment considering how close the airport is to downtown and how relatively cheap it would have been for a direct connection. The diesel trains are still polluting the environment. The rail line's configuration in Riverside South limits the potential for a proper town centre. The Trillium Line truly was the most rail for the cheapest price, and we're getting it from a engineering company embattled in legal issues that didn't even meet the technical scoring criteria.
     
     
  #9852  
Old Posted Mar 24, 2019, 12:43 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,044
Great video of the Confederation running at night from Pimisi and Tunney's.

https://twitter.com/OttawaTomorrow/status/1109212190379294722
     
     
  #9853  
Old Posted Mar 24, 2019, 4:10 PM
NOWINYOW NOWINYOW is offline
Registered User
 
Join Date: Mar 2013
Location: Ottawa
Posts: 480
Quote:
Originally Posted by Uhuniau View Post
Except the "current tunnel" could never handle bus traffic, and the cost of building a tunnel to bus-traffic code would likely have eaten up even more cash than a rail tunnel.
Given the money spent changing the Queensway around to accommodate buses for a few years, the Scott Street redevelopment to accommodate buses, the transitway changes east and west of the tunnel portals? I'm quite confident the extra tunneling required for larger stations to permit pass-through bus lanes and perhaps 2 lanes in each direction for loading/offloading, would have been much cheaper. Plus no real interruptions to the original lines.
     
     
  #9854  
Old Posted Mar 24, 2019, 4:52 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Richard Eade View Post
A tunnel for buses would have needed to be wider, since OC Transpo would have insisted on passing at stations.
Not just at that, but since buses require longer dwell times and are less platform efficient, the platforms would need to be longer. Also, the tunnel itself would need to be wider to accommodate driver error (trains follow the tracks, so don't need as much clearance).

Quote:
However, bus platforms could have been staggered; the west-bound and east-bound platforms don’t need to be across from each other. Remember, buses can make relatively small-radius turns to adjust their path quickly. The east-bound station could consist of a single west-bound bus lane, two east-bound bus lanes (one for stopping in and one for passing), and the platform. The west-bound platform, further along the tunnel would have a similar, but opposite, configuration. Thus, the total width would be three bus lanes and a platform – instead of two train ‘lanes’ and two platforms. Yes, the tunnel would have been wide for a longer length, but it still would have had no problem fitting within the city’s Rights of Way under Queen and Rideau.
But with staggered platforms, would have required a larger concourse area, meaning more rock to be excavated, thus increasing cost.

Quote:
Ramps can be much steeper for buses, which might have allowed for a shorted tunnel length.
True about buses handling steeper grades, but I don't see how, given current tunnel configuration, it would have resulted in a shorter tunnel. The western portal is at Nanny Goat Hill, so I don't think they would have saved any tunnel length there (I can't imagine the portal being any further east). The eastern portal is just over 100m south of Laurier. I don't think they would want it much further north as there is an advantage to keeping it grade separated with Laurier.

Quote:
The tunnel ventilation system would have had to be much more expensive. Perhaps so, but the requirements for the ventilation system are already a lot higher than most people realize. Even with an electric train, the ventilation system must be able to handle any possible smoke and chemicals within the tunnel. Thus, there are already huge ventilation shafts and fans which are designed to keep fumes away from the stations. It might simply be a case of running them at a slow speed all the time. There is also the option of running buses with 100% electric propulsion through the short tunnel.
Were hybrid buses available 30 years ago? There were trolley buses but I don't know of anyone using a hybrid bus then. Because you can't use the wheels for a return feed, trolley buses require two pickups and aligning them is typically a manual process, so the transition would have required the driver getting out and manually connecting it, which would slow everything down.

Quote:
A bus tunnel would simply move the bus lines from the surface to underground. I don’t believe that there was ever a plan to completely strip the surface of buses. Cities need buses on the surface; even when those cities have a well-developed underground transit network. Of the approximately 200 buses per hour (during the peak periods) running through the core, probably only about 70% would have been moved underground. At 140 buses per hour, I believe that the underground station would have run relatively smoothly.
I don't think anyone is suggesting that all buses be removed from the surface. Even with the Confederation Line, we will still have local buses downtown. I don't think anyone would want the rapid and express buses bypassing an over capacity tunnel though. There would be pressure to expand or twin the tunnel or convert to rail.

Quote:
A bus tunnel would have cost a lot more. I expect that this is true, but, remember, the cost of the LRT system is $2.1B for Stage 1 + $4.6B for Stage 2 + $??B for Stage 3. This is because the entire line needs to be completely converted before it is useful. The LRT tunnel itself came in about $650M and the rest of the BILLIONS of dollars are REQUIRED to convert the Transitway to rail. If a bus tunnel had been built, then the remaining Transitway could have been used. There is no need to convert the rest of the Transitway to a Transitway. So, even if the bus tunnel cost, say, $1B, that would be the total of what was REQUIRED for the line to be functional. Of course, there could still have been a lot of upgrades to the existing Transitway and the completion of missing links, but the total cost would likely only have been a portion of what it is costing to convert to a different technology.
You are assuming that a bus tunnel built 30 years ago would meet today's capacity needs. I don't think this is a valid assumption. The most logical next move would have been to convert it to rail, and that would have required all the same extensions we are looking at today.

Quote:
People like to ride trains more than they like buses. Well, if a person is given the choice between taking a bus to transfer to a train to get to work verses taking a single bus directly to work, with most of the trip on a dedicated Transitway, they might opt for the bus. The speed of the trip might actually be faster on the single-seat bus ride. And, if the bus tunnel works as well as I believe it should, the buses will be reliable enough for people to schedule when they leave work to catch ‘their’ bus home.
There is no way we could have crowds of people waiting for their 1 of 30 different bus routes in a downtown tunnel. We would have had a couple different routes using the tunnel and people transferring to their Connexion bus in the suburb, similar the way STO's Rapibus line works

Quote:
So, there is some thought added to the knee-jerk statements that people make about a bus tunnel. Yes, it would likely have cost more FOR THE TUNNEL, but the over-all system cost would likely have been much lower. Also, the buses could have maintained the single-seat ride that commuters have gotten used to.
Don't forget the Transitway as it was built went way over budget and ended up costing more than the initial estimates for LRT at the time. Now LRT could have also been over budget, but we can't assume the system would have been cheaper.

Quote:
Of course, those thoughts only take into account the CAPITAL cost of the system; the operating costs are undoubtedly higher with buses.
And that is not trivial either.
     
     
  #9855  
Old Posted Mar 24, 2019, 5:13 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,044
Quote:
Originally Posted by roger1818 View Post
Were hybrid buses available 30 years ago? There were trolley buses but I don't know of anyone using a hybrid bus then. Because you can't use the wheels for a return feed, trolley buses require two pickups and aligning them is typically a manual process, so the transition would have required the driver getting out and manually connecting it, which would slow everything down.
Seattle has been using dual-mode transit buses in its bus tunnel since 1987. Diesel on street and electric trolley in the tunnel.

Here's a pic from 1990.


https://en.wikipedia.org/wiki/Downtown_Seattle_Transit_Tunnel
     
     
  #9856  
Old Posted Mar 24, 2019, 6:56 PM
corynv corynv is offline
Registered User
 
Join Date: Jun 2018
Posts: 171
Quote:
Originally Posted by swimmer_spe View Post
The Transitway is about 30 years old.... Show me one bus that is that old in the fleet.
There's a pretty big difference in replacing buses as they get too old versus replacing nearly every transitway bus with dual mode (or electric) in the time it would have taken to build a bus tunnel.
     
     
  #9857  
Old Posted Mar 24, 2019, 7:11 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by J.OT13 View Post
Seattle has been using dual-mode transit buses in its bus tunnel since 1987. Diesel on street and electric trolley in the tunnel.

Here's a pic from 1990.


https://en.wikipedia.org/wiki/Downtown_Seattle_Transit_Tunnel
True, but they had to shut it down for two years when the built Link LRT, and it's to close permanently to buses in the next couple of years. Also, despite the tunnel Seattle also maintains frequent and heavy bus service above the tunnel on 3rd street.

Link has 10 minute headways during the day, when I was there I only took the train from the airport to downtown, after that it was easier to just take the bus, which was free downtown.
     
     
  #9858  
Old Posted Mar 25, 2019, 3:18 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,082
Quote:
Originally Posted by swimmer_spe View Post
You do know they make dual mode buses? The Silver Line in Boston makes use of them. So, the arguement about ventilation is moot.
Ventilation is only part of the equation. Buses require wider tunnels for their wider margins of error, being driven by human operators and not on rails or other guideways. Compare the Seattle bus tunnel or even the St. Laurent tunnel-like thing for the kinds of geometries that would be required.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #9859  
Old Posted Mar 25, 2019, 3:20 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,082
Quote:
Originally Posted by PHrenetic View Post
The new bus shelters along Queen should have been 'operational' long ago, just after Queen was re-opened - just no reason for their delay.
They should also have been designed with humans in mind, but they were designed by the same anti-social psychopaths who have designed too much of the rest of Ottawa's transit system.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #9860  
Old Posted Mar 25, 2019, 10:00 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by J.OT13 View Post
We had plenty of buses 10-40 years old when the N/S was cancelled. They were all scrapped when we switched to 100% accessible, which is a good thing, but brings up a lot of questions around the quality of the newer generations of buses.
Quote:
Originally Posted by corynv View Post
There's a pretty big difference in replacing buses as they get too old versus replacing nearly every transitway bus with dual mode (or electric) in the time it would have taken to build a bus tunnel.
Quote:
Originally Posted by Uhuniau View Post
Ventilation is only part of the equation. Buses require wider tunnels for their wider margins of error, being driven by human operators and not on rails or other guideways. Compare the Seattle bus tunnel or even the St. Laurent tunnel-like thing for the kinds of geometries that would be required.
If they planned it right, they could have bought the new buses long before shovels were in the ground for the tunnel.

I also know that there is more than just road surface and ventilation for the tunnels.

Point is, it could have been done, but in a way, it is good that it wasn't.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:22 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.