HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


Reply

 
Thread Tools Display Modes
     
     
  #101  
Old Posted Mar 8, 2019, 8:50 PM
MichelKazan MichelKazan is offline
Registered User
 
Join Date: Dec 2008
Location: Gatineau, Quebec
Posts: 185
Quote:
Originally Posted by CityTech View Post
Sobeys Urban Fresh is the only banner I can see working for a new store in the inner core.. Its the highest margin store so they can afford the very high costs of rent on a brand new downtown space.
Not necessarily. In Toronto, not that far from Yonge Street and the Financial/Entertainment District:

Freshco:
https://www.google.ca/maps/@43.6595066,-...itch%3D0%26thumbfov%3D100!7i16384!8i8192
https://www.google.ca/maps/@43.6692084,-...3-TODo4ttVpGJo794jwkQ!2e0!7i16384!8i8192

Food Basics
https://www.google.ca/maps/@43.667622,-7...qGlwaEce4m4RilPVFyvxg!2e0!7i16384!8i8192
Reply With Quote
     
     
  #102  
Old Posted Mar 10, 2019, 9:24 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
'Downtrodden, old-fashioned, quiet': The Glue Pot Pub is closing

Bruce Deachman
Postmedia
March 10, 2019



340 Queen St., home to the Glue Pot Pub, Barbarella’s VIP Cabaret and Dana’s Indian Cuisine, is to be torn down to make way for three highrise buildings.

David Raynor sat at the copper-topped bar of the Glue Pot Pub on a recent afternoon, reading a book and nursing a beer, one of the last he’ll have there. A retired university professor, Raynor only rediscovered the bar a few months ago, after a long absence, and he now comes six days a week, making the half-hour bus ride from his home in Blackburn Hamlet.

“It’s not upscale,” he says. “A lot of people don’t like upscale. People like this … I don’t know what you call this: downtrodden, old-fashioned, quiet. You meet really interesting people, from construction workers to retirees to politicians. People come here to relax, and the prices are great.

“This is a good place.”

Two stools down sits Don, a LeBreton Flats resident who also rediscovered the bar, in his case about a year ago. He had his first beer here close to 25 years ago, when he was 18, (not quite) the legal drinking age.

“It’s a nice dive,” he says. “A nice, easy place to come to where you can have a drink and watch the game.”

But the Glue Pot’s 31-year reign at the corner of Queen and Lyon streets is coming to an end. At the end of March, it and two other businesses in the building — Barbarella’s VIP Cabaret and Dana’s Indian Cuisine — will close to make way for the building’s demolition and construction of a subsequent three-tower Claridge development that will include 389 condominiums, a 200-room hotel and a 23,000-square-foot supermarket.

“It’s going to be a loss for the neighbourhood when it goes,” Don says.

A laminated world map on one wall of the Glue Pot is covered with red dots, indicating how far its customers have come for drinks: the Aleutian Islands, Fiji, Siberia, China, Zimbabwe. General manager Doug Letcher estimates “hundreds of thousands” of people have passed through its doors since it opened in 1988.

Initially, though, most Glue Pot customer’s came from four blocks away. The bar’s original owner, Hugh Ireton and a couple of partners decided to open the Glue Pot in a disused second-floor space above the Dill Pickle restaurant, after Ireton’s favourite daytime bar, the Windsor Tavern at the corner of Metcalfe and Queen, announced it was closing, leaving the downtown core without a traditional brasserie.

“There’s got to be someplace you can go to sit down over a quart of beer without having to hack your way through a plate of radicchio,” Ireton said at the time.

He got a great deal on rent — “It was just bats and rats and storage and junk. There was nothing there. It had been derelict for some time” he recalls of the two-storey former Coca Cola bottling plant and onetime government printing warehouse — and began installing fixtures, some scavenged from the neighbourhood. The actual bar, beer fridges and wood paneling came from the Skyline Hotel across the street (now the Delta), when it closed its Rough Rider Lounge. The copper for the bar top came about when workers installing new copper on the Supreme Court roof came in for a beer one Saturday.

“They liked to drink beer and I’d always wanted a copper-topped bar,” Ireton recalls of that quid pro quo deal, “so one thing led to another.”


Doug Letcher, general manager of the Glue Pot Pub and Barbarella’s VIP Cabaret, has been associated with the businesses for 21 years.

Ireton hired Lou Roussy and Lorne Armstrong, longtime and beloved waiters from the Windsor Tavern, and many of their customers followed, including numerous government workers and NDP staffers who were habitués. The government employees still make up the lion’s share of the Glue Pot’s largely daytime clientele, Letcher says, but the NDPers have been supplanted by Tories.

In 1991, Ireton sold the Glue Pot to current owner Pierre Groulx, who also owns Barbarella’s strip club downstairs. Over the years, the Glue Pot hosted scores of live music acts of all types, as well as trivia nights, burlesque performances, and pool and darts leagues. The building also experienced some unsavoury drama. Groulx points to the spot in Barbarella’s where, in January 2012, arsonists attempted to burn it down. “Someone wanted me to do something I didn’t want to do,” is his cryptic explanation. Eight days later, someone fired shots into the front door.

In June 2015, two Barbarella’s employees were charged with aggravated assault following an attack on an Uber driver, and in January 2017, a male employee was stabbed outside the club, following an altercation that began inside.

The stories they’d prefer to remember, Letcher says, are of their customers. “People have packed this bar to watch Canada win gold medals. I remember the morning the towers went down in the States. The government workers here were let out, and the place was packed all afternoon, watching it.

“We’ve had people who’ve met here get married. Staff have gotten married.”

Rumours of the building’s demise, Groulx says, have circulated for a half dozen years or more. A year ago, the end seemed inevitable, and at the beginning of February Claridge finally told him he had until the end of March.

He looked around with the idea of opening elsewhere, but ultimately decided against moving the Glue Pot or Barbarella’s.

“I’d have to spend about five- or six-hundred thousand to open another place,” the 66-year-old says. “I feel bad for the employees, but, for me, I’ve had enough.”

Besides, he adds, he has other properties to manage, including a fishing camp near Maniwaki.

(Dana’s Indian Cuisine owner Mohammad Hossain says he’s looking to relocate his business, but hasn’t yet found a suitable spot.)

So, rather than move, Groulx is selling off everything: fixtures, TVs, signs, even the original tin ceiling. But, before it all goes, they’re planning a couple of farewell parties for March 21 and 22.

Meanwhile, letters of recommendation have been written for the bar and kitchen staff — about 25 people in total — while most of the 30 or so dancers will move to the Bare Fax in the ByWard Market.

“It’s disappointing,” says one, Annabelle, who commutes to work each day from Smiths Falls. “I’ll miss it here. It’s like family.”


Then and now: From 1912 to 1946, Coca Cola’s first bottling plant in Ottawa was located at 430 Queen St. Today the building is home to the Glue Pot Pub, Barbarella’s VIP Cabaret and Dana’s Indian Cuisine.

But it’s time, Groulx says. Business at the strip club has dropped about 60 per cent in the past four years following a general malaise in the industry. Recent construction of the LRT, with blasting and road closures and gas and water outages, have also hurt business.

“It seems a shame that it has to go,” Ireton says, “but its time has passed. It was far more than just a place to go and have a beer; it was a social phenomenon that has really changed, and young folks really wouldn’t understand. It’s the passing of an era, for better or ill.”

For Groulx, there’s really only one thing left to do. “I’ve been here since February 1991. Now I just want to finish it off. I’ve asked them to call me when they’re going to bring the building down, so I can watch.”

https://ottawasun.com/news/local-news/a-...wcm/f42d5e42-3483-4ac1-9fd3-7ac587d51b8b
Reply With Quote
     
     
  #103  
Old Posted Mar 10, 2019, 9:28 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Side note, here are Ottawa's Coca-Cola bottling plants through history. Bronson plant, located at on the south side of the Queensway across the off ramp, was I believe taken over by a school board for a few decades and was demolished a few years ago.

Sad to see these buildings (first two bottling plants) go.


https://www.facebook.com/photo.php?fbid=10161685466600171&set=p.10161685466600171&type=3&theater
Reply With Quote
     
     
  #104  
Old Posted Mar 11, 2019, 3:48 PM
danishh danishh is offline
Registered User
 
Join Date: Dec 2013
Posts: 429
Quote:
Originally Posted by J.OT13 View Post
Side note, here are Ottawa's Coca-Cola bottling plants through history. Bronson plant, located at on the south side of the Queensway across the off ramp, was I believe taken over by a school board for a few decades and was demolished a few years ago.

Sad to see these buildings (first two bottling plants) go.


https://www.facebook.com/photo.php?fbid=10161685466600171&set=p.10161685466600171&type=3&theater
the Bronson plant was demolished in 2015 I think. The site has been used for some sort of construction staging recently.
Reply With Quote
     
     
  #105  
Old Posted Mar 12, 2019, 3:10 PM
Jayday23 Jayday23 is offline
Registered User
 
Join Date: Sep 2017
Posts: 357
construction expected to start in may, occupancy in fall 2022.

https://ottawacitizen.com/life/homes/bui...wers-in-claridges-five-upcoming-projects
Reply With Quote
     
     
  #106  
Old Posted Mar 12, 2019, 5:36 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
So it took them a few months to build the sales centre starting in late July, they launch end of March and demolishing the Coca-Cola building and I guess sales centre in May to start construction? Was the sales centre really worth it? Would it not have been better to rent nearby space for a few years or evict one of the Coca-Cola tenants earlier?
Reply With Quote
     
     
  #107  
Old Posted Mar 20, 2019, 12:38 PM
McKellarDweller's Avatar
McKellarDweller McKellarDweller is offline
inner city
 
Join Date: Feb 2012
Location: Calgary/Ottawa
Posts: 490
Last night when we were there, Harley613 and I were discussing how much of a shame it is they we're losing the building. It really should have had a heritage designation.

Not everything in Ottawa has to be Victorian or Edwardian etc. to merit preservation, in my opinion. Those clay bricks and warehouse windows are an important part of Ottawa's manufacturing/blue collar history that can't be replaced the way basic, interchangeable condos can. A quick drive-by of the front of the building, or looking at a streetview photo of it doesn't do it justice.

It would have been great if they could have subtly reinforced the structure, and worked the building envelope into the podium like at 150 Elgin.
Reply With Quote
     
     
  #108  
Old Posted Mar 20, 2019, 1:49 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,691
Quote:
Originally Posted by McKellarDweller View Post
Last night when we were there, Harley613 and I were discussing how much of a shame it is they we're losing the building. It really should have had a heritage designation.

Not everything in Ottawa has to be Victorian or Edwardian etc. to merit preservation, in my opinion. Those clay bricks and warehouse windows are an important part of Ottawa's manufacturing/blue collar history that can't be replaced the way basic, interchangeable condos can. A quick drive-by of the front of the building, or looking at a streetview photo of it doesn't do it justice.

It would have been great if they could have subtly reinforced the structure, and worked the building envelope into the podium like at 150 Elgin.
Those great big warehouse windows with the steel mullions are great. I loved having breakfast at the Glue Pot Where else in the city could you sit by a window having good ol' bacon 'n' eggs and have a view like this:

Reply With Quote
     
     
  #109  
Old Posted Mar 21, 2019, 5:38 PM
Arcologist Arcologist is offline
Registered User
 
Join Date: Oct 2011
Location: The Nation's Capital
Posts: 696
Let's not forget, this is Claridge, so while the renderings look half-decent right now, the final product will be another Andaz or Tribeca with low-quality, eyesore cladding.
Reply With Quote
     
     
  #110  
Old Posted Mar 21, 2019, 7:14 PM
passwordisnt123 passwordisnt123 is offline
Registered User
 
Join Date: Mar 2015
Location: Ottawa (Centretown)
Posts: 643
Quote:
Originally Posted by Arcologist View Post
Let's not forget, this is Claridge, so while the renderings look half-decent right now, the final product will be another Andaz or Tribeca with low-quality, eyesore cladding.
I wouldn't mind another Tribeca-quality building one bit. It's one of the better downtown builds in recent memory IMHO.
Reply With Quote
     
     
  #111  
Old Posted Mar 21, 2019, 7:18 PM
JHikka's Avatar
JHikka JHikka is offline
ハルウララ
 
Join Date: Jul 2009
Location: Toronto
Posts: 12,853
Every time I see the name of this development I can't help but be reminded of Tom Cullen, a character in Stephen King's The Stand. "M-O-O-N spells Claridge"
Reply With Quote
     
     
  #112  
Old Posted Mar 22, 2019, 3:13 AM
Admiral Nelson Admiral Nelson is offline
Registered User
 
Join Date: Jun 2009
Posts: 519
Quote:
Originally Posted by passwordisnt123 View Post
I wouldn't mind another Tribeca-quality building one bit. It's one of the better downtown builds in recent memory IMHO.
Agreed. Claridge Plaza would be a different kind of comparison though. Definitely had enough of those.
Reply With Quote
     
     
  #113  
Old Posted Mar 22, 2019, 4:12 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Had the chance to go to Glue Pot yesterday with a work buddy and my girlfriend. The pub, and especially the building, will be missed.
Reply With Quote
     
     
  #114  
Old Posted Mar 28, 2019, 8:48 PM
Jayday23 Jayday23 is offline
Registered User
 
Join Date: Sep 2017
Posts: 357
If you check out Claridge’s instagram page, they have posted a story today which shows the integration of moon into the LRT station. Looks really good!
Reply With Quote
     
     
  #115  
Old Posted Mar 30, 2019, 3:55 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Quote:
Originally Posted by Jayday23 View Post
If you check out Claridge’s instagram page, they have posted a story today which shows the integration of moon into the LRT station. Looks really good!
Wasn't able to find the story, just a quick reminder of the launch with the logo.
Reply With Quote
     
     
  #116  
Old Posted Mar 30, 2019, 6:07 PM
trhgr's Avatar
trhgr trhgr is offline
Registered User
 
Join Date: May 2012
Location: Downtown Ottawa
Posts: 145
Quote:
Originally Posted by J.OT13 View Post
Wasn't able to find the story, just a quick reminder of the launch with the logo.
On their March 11 post showing a rendered picture of the condo. In the comments: "Register to be the first to receive info on Ottawa's first Condo tower to incorportate the #LRT".
Reply With Quote
     
     
  #117  
Old Posted Apr 14, 2019, 4:37 PM
YOWhopeful YOWhopeful is offline
Registered User
 
Join Date: Jan 2014
Posts: 183
Looks like Barbarella’s is boarded up. Awnings are down. Demolition should happen very soon.
Reply With Quote
     
     
  #118  
Old Posted Apr 25, 2019, 2:11 AM
MattRichling's Avatar
MattRichling MattRichling is offline
Kickass User
 
Join Date: Mar 2011
Location: Ottawa
Posts: 176
Claridge announced that sales for the project will begin on May 11th.
__________________
Matt Richling
Salesperson / Team Lead
New Purveyors Brokered by RE/MAX Hallmark Realty Group,

www.MattRichling.com
www.NewPurveyors.com
Reply With Quote
     
     
  #119  
Old Posted Apr 25, 2019, 10:48 AM
daud's Avatar
daud daud is offline
Registered User
 
Join Date: Jun 2012
Location: Ottawa
Posts: 763
Quote:
Originally Posted by JHikka View Post
Every time I see the name of this development I can't help but be reminded of Tom Cullen, a character in Stephen King's The Stand. "M-O-O-N spells Claridge"
Nice. It’s a hilarious name for a condo. I keep thinking Jackie Moon from Semi Pro.
Reply With Quote
     
     
  #120  
Old Posted Apr 26, 2019, 11:21 PM
Glenlivet Ave's Avatar
Glenlivet Ave Glenlivet Ave is offline
Registered User
 
Join Date: Feb 2010
Location: Ottawa
Posts: 191
I received an email from Claridge today:

"YOU'RE INVITED!


Join us at the VIP Launch Event to reserve your preferred Claridge Moon condo. Check out the views, review the interior finishes, compare the floor plans and meet with our sales reps.

Units will be reserved on a first come, first served basis.

The Claridge Moon Sales Office will be open to the public on Saturday, May 11th - reserve your condo in advance with exclusive access at the VIP Launch Event!

VIP LAUNCH EVENT
Thursday, May 9th
Doors Open at 4:00 pm
Claridge Moon Sales Office
383 Albert Street (Corner of Lyon and Albert)"
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 1:10 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.