Quote:
Originally Posted by Migrant_Coconut
I'm more concerned about all the New Urbanist half-block grade crossings instead of over/underpasses. People in inner Vancouver generally ignore traffic lights, so at best we have one vehicle turning right every cycle, and at worst a whole lot of accidents. Downtown and Broadway on a bus is a crawl as-is.
Not disagreeing, but then you've got the Massey Tunnel which has the same problem for the same demolition/construction cost, and the people who want the viaducts gone said "upgrading it is cheaper." Is there something I'm missing, or just ideology?
|
Where can you turn off the viaducts mid length 20 feet above the rest of the street grid?. There are countless locations in Vancouver missing proper turning lanes and the viaducts don't give you options for a different route once you are on them, you are stuck once on them

. Turning lanes could be added in the future, but it's not a problem specific to this project, it's a whole city planning thing. Half block grade crossings can be removed if too problematic and changed to traditional intersection crossings or pedestrian bridge can be built or change pedestrian crossing to every 2 blocks, there are options for change.
Who specifically in the viaduct removal game said upgrading the tunnel is cheaper? They are an idiot and shouldn't be listened to. It's my personal belief that they both have equal importance to be replaced, along with the 'heavy wind' susceptible Pattullo bridge. In all honesty what rapid transit train line would be damaged or road above or below the massey tunnel be blocked if the tunnel collapsed? None. There's no rerouting the skytrain downtown if that section adjacent to the viaducts get's damaged, downtown would effectively be without any rapid transit to most of the suburbs for likely years. The people out in the suburbs have come to rely on that connection for almost 35 years. That would be a bunch of people who would have to buy a car and start driving downtown, how badly would that affect traffic?
I do believe the mayors have been irresponsible with completely shutting down the Massey bridge replacement but the Liberals used it as an election pawn and wouldn't budge on any aspect of it's design so there was a stalemate that resulted in a huge delay with a ton of planning funds already spent. If it wasn't used as an election ploy by the Liberals and had been more reasonable with the mayors' cities' who would be directly affected I believe it would be under construction by now.