Quote:
Originally Posted by Dengler Avenue View Post
Is it live or something? How did you all get the information in real time?
twitter...@jonathanwilling
Reply With Quote
     
     
  #1622  
Old Posted Mar 6, 2019, 8:29 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,682
Quote:
Originally Posted by daud View Post
twitter...@jonathanwilling
Okay thanks. I got rid of my account because it was too distracting. (Ironic enough, I still use it to check traffic on provincial highways.)

Ps: Funny name. I mean it in a good way.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #1623  
Old Posted Mar 6, 2019, 8:37 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,795
They really had no choice but to approve it. The alternative would have left the city in almost the same spot as 2006. We needed to move ahead.
Reply With Quote
     
     
  #1624  
Old Posted Mar 6, 2019, 8:39 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by lrt's friend View Post
They really had no choice but to approve it. The alternative would have left the city in almost the same spot as 2006. We needed to move ahead.
I agree. It was one of those situations where they had to plug their noses and vote yes. A no vote would have caused all sorts of issues.
Reply With Quote
     
     
  #1625  
Old Posted Mar 7, 2019, 12:56 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,625
Council OKs $4.6B Stage 2 transit contracts, the largest infrastructure approval in Ottawa's history

Jon Willing, Ottawa Citizen
Updated: March 6, 2019


Ottawa’s $4.6-billion Stage 2 transit expansion is a go.

City council voted 19-3 on Wednesday to sign contracts with two construction groups to extend the Confederation Line LRT to Trim Road, Algonquin College and Moodie Drive, and extend the Trillium Line to Limebank Road and the Ottawa International Airport.

Kiewit and Vinci, under the name East West Connectors, will construct the Confederation Line extensions, and SNC-Lavalin, under the name TransitNEXT, will construct the Trillium Line extensions and maintain the line.

Voting against the largest infrastructure project in the City of Ottawa’s history were councillors Rick Chiarelli, Diane Deans and Shawn Menard.

Self-described LRT supporter Deans said she doesn’t have confidence in the decision-making process, especially since she couldn’t get a straight answer on how the winning contractors scored in the bidding process.

“I got a song and a dance,” Deans said. “I got a hundred different ways of dancing around it and I didn’t get a simple answer.”

However, Coun. Jan Harder said council should be trusting city staff who put together the Stage 2 package and recommended the winning contractors.

“I don’t think anybody else has the expertise of the team that put this together,” Harder said, looking around the council table.

Mayor Jim Watson said no councillor can say he or she supports LRT and then vote against LRT. Council should be “visionary, bold and move forward,” he said.

“This is not a difficult decision to make at all,” Watson said.

“Residents in all parts of the city are demanding we bring light rail to their part of the city as soon as we can.”

Council plowed ahead with expanding the O-Train network without yet having a working Stage 1 LRT line. The Stage 1 builder, Rideau Transit Group, which is a partnership of SNC-Lavalin, ACS Infrastructure Canada and EllisDon, has missed three deadlines and now says it can deliver the 12.5-kilometre LRT line by the end of June.

The exact cost for Stage 2 is $4,657,445,229.

The cost is $1.2 billion more than what the city last estimated before asking for construction bids.

The federal and provincial governments had committed to providing $2.366 billion for Stage 2. The city will use gas tax transfers, development charge revenue, transit taxes and borrowed money to pay for its share. The city plans to borrow $1.6 billion at an interest rate of between 3.5 per cent and 4.75 per cent.

The Confederation Line expansion will continue to use Alstom Citadis Spirit LRT vehicles supplied through Rideau Transit Group, which will also maintain the full LRT line. The Trillium Line expansion will put Stadler trains on the main line and run the existing Alstom Coradia Lint trains on the airport spur.

There was a failed effort led by Coun. Catherine McKenney to delay the vote until March 27, but the city’s external procurement lawyer said it would be impossible to finalize the deals by March 29, which is the commercial close of the Trillium Line deal. Delaying could add millions of dollars to the contracts and the upper levels of government need a city commitment before confirming funding for Stage 2, council heard.

“I just find the drama off-putting,” Deans said.

“We have to ask ourselves whose interests are we here to protect today,” McKenney said, adding that she’s “desperate” for Stage 2, but she’s not comfortable with the short turnaround time to make a decision on the contracts.

There were two especially persistent lines of questioning by councillors during the meeting: the vetting of SNC-Lavalin as a contractor and the bid scoring of the winners.

Councillors like Carol Anne Meehan hammered away on the city’s decision to recommend hiring SNC-Lavalin for the Trillium Line work, especially considering the saga involving the company on Parliament Hill. City staff said the company’s financial capabilities and ability to complete the project cleared the due diligence.

But several councillors, like Deans, McKenney and Chiarelli, couldn’t get a straight answer about whether the recommended builders met a city-set score. City staff, based on outside legal advice, wouldn’t say if Kiewit/Vinci and SNC-Lavalin achieved a minimum technical score of 70 per cent. They wouldn’t even say who was tasked with scoring the bids.

Construction on Stage 2 is scheduled to begin this year.

The mammoth expansion project will come with transit and traffic headaches.

Shutting down more of the Transitway for rail conversion will eventually mean all sorts of bus detours and traffic slowdowns at various times over the course of construction.

There will be buses diverted to Scott Street between Tunney’s Pasture and Dominion Station. The southeast Transitway between Iris Station and Algonquin College will eventually close, diverting buses to Iris Street and Woodroffe Avenue. Most of the buses that normally travel on the Transitway between Pinecrest and Moodie stations will be diverted to Highway 417.

The most significant disruption for all sorts of traffic will likely happen in the Richmond Road corridor, where a cut-and-cover tunnel will be dug out on Byron Linear Park.

In the eastern leg, most of the significant re-routing will happen between Blair Station and Highway 174. As for other traffic, Montreal Road will be reduced to one lane under Highway 174 during the warm months to reconstruct bridge piers.

The biggest transit crunch will probably involve the Trillium Line. It has to close in May 2020 for more than two years. A replacement bus route will run.

Hunt Club Road around the Airport Parkway could see traffic snarls to allow construction of a bridge.

If the Stage 2 construction timeline holds up, the Trillium Line expansion will be done in 2022, the Confederation Line between Blair and Trim stations will be done in 2024 and the Confederation Line between Tunney’s Pasture, Algonquin College and Moodie Drive will be done in 2025.

The city has already spent about $600 million on Stage 2, considering the train purchase from RTG, property costs and initial design work.

Council members voting in favour of the Stage 2 contracts were Watson, Harder, McKenney, Meehan, Glen Gower, Keith Egli, Matthew Luloff, Jenna Sudds, Riley Brockington, Laura Dudas, Jean Cloutier, Theresa Kavanagh, Mathieu Fleury, Allan Hubley, Scott Moffatt, Eli El-Chantiry, Jeff Leiper, Tim Tierney and Stephen Blais.

George Darouze, whose father recently died, wasn’t at the council meeting.

[email protected]
twitter.com/JonathanWilling

https://ottawacitizen.com/news/local-new...frastructure-approval-in-ottawas-history
Reply With Quote
     
     
  #1626  
Old Posted Mar 7, 2019, 4:05 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,381
It was one of those cases where I wish it was closer than 19-3 to put some pressure on Watson, staff and contractors.

Chiarelli is such a baby. Why is he so pissed at Watson? I mean I get why urban councilors would be but Rick Chiarelli?
Reply With Quote
     
     
  #1627  
Old Posted Mar 10, 2019, 6:55 PM
Gat-Train Gat-Train is offline
BANNED
 
Join Date: Nov 2018
Posts: 508
It sounds like we're getting a subpar transit line, since they wouldn't answer whether or not the companies could be selected with a <70% score
Reply With Quote
     
     
  #1628  
Old Posted Mar 10, 2019, 10:46 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,627
Quote:
Originally Posted by Gat-Train View Post
It sounds like we're getting a subpar transit line, since they wouldn't answer whether or not the companies could be selected with a <70% score
I just don't think they are willing/able to comment on it at this time. This is a complex project and, despite the delays, it seems to be coming into form. Any activity out on the tracks today? Probably one of the last chances to test in the snow!
Reply With Quote
     
     
  #1629  
Old Posted Mar 10, 2019, 11:05 PM
pattherat pattherat is offline
Registered User
 
Join Date: Nov 2018
Posts: 197
Quote:
Originally Posted by O-Town Hockey View Post
I just don't think they are willing/able to comment on it at this time. This is a complex project and, despite the delays, it seems to be coming into form. Any activity out on the tracks today? Probably one of the last chances to test in the snow!
I saw no trains today from my Lebreton perch, but I did see the new melter they mentioned in the Fedco update, both yesterday and today.
Reply With Quote
     
     
  #1630  
Old Posted Mar 11, 2019, 12:55 AM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,800
Quote:
Originally Posted by pattherat View Post
I saw no trains today from my Lebreton perch, but I did see the new melter they mentioned in the Fedco update, both yesterday and today.
I was surprised to not see any out today; I figured they would have wanted to use the opportunity of the snowfall to do some winter ops testing.
Reply With Quote
     
     
  #1631  
Old Posted Mar 11, 2019, 12:47 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,943
Quote:
Originally Posted by pattherat View Post
I saw no trains today from my Lebreton perch, but I did see the new melter they mentioned in the Fedco update, both yesterday and today.
If the issue was clearing snow and not the train, it would make sense for them to take advantage of the weather to test out the new snow clearing equipment instead of the trains. At the same time, running 15 single trains would also have been a good snow clearing test.
Reply With Quote
     
     
  #1632  
Old Posted Mar 11, 2019, 10:57 PM
pattherat pattherat is offline
Registered User
 
Join Date: Nov 2018
Posts: 197
Quote:
Originally Posted by bradnixon View Post
I was surprised to not see any out today; I figured they would have wanted to use the opportunity of the snowfall to do some winter ops testing.
Plenty out today BTW. Worked from home, saw them all day and after 4PM or so the volume seemed to increase as well as the addition of coupled trains.
Reply With Quote
     
     
  #1633  
Old Posted Mar 12, 2019, 12:07 AM
Mikeed Mikeed is offline
Registered User
 
Join Date: Jun 2013
Posts: 377
If someone could film the coupled trains and some traffic that would be great.
__________________
Long time reader.
Seldom post.
Reply With Quote
     
     
  #1634  
Old Posted Mar 12, 2019, 4:01 AM
Mikeed Mikeed is offline
Registered User
 
Join Date: Jun 2013
Posts: 377
https://youtu.be/idFiNcCfYBc

First glimpse of a coupled train in motion I've seen.
__________________
Long time reader.
Seldom post.
Reply With Quote
     
     
  #1635  
Old Posted Mar 12, 2019, 5:08 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,943
Quote:
Originally Posted by Mikeed View Post
https://youtu.be/idFiNcCfYBc

First glimpse of a coupled train in motion I've seen.
Thanks for the video!
Reply With Quote
     
     
  #1636  
Old Posted Mar 13, 2019, 3:48 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,943
One thing I'm trying to wrap my head around is the Stage 2 vehicle fleet. The 38 new trains, for a total of 72, will be ready by 2022. One, how can Belfast Yards accommodate that many trains, even with the expansion, and two, will we be constantly rotating through the entire stock to ensure all of them are used on a consistent basis? And when Moodie Yards opens around 2024 (I suspect it will be usable about a year before the west line opens), how much space will be cleared at Belfast? And how will testing work? Anyone know how they've done it in other cities?
Reply With Quote
     
     
  #1637  
Old Posted Mar 13, 2019, 4:00 AM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by J.OT13 View Post
One thing I'm trying to wrap my head around is the Stage 2 vehicle fleet. The 38 new trains, for a total of 72, will be ready by 2022. One, how can Belfast Yards accommodate that many trains, even with the expansion, and two, will we be constantly rotating through the entire stock to ensure all of them are used on a consistent basis? And when Moodie Yards opens around 2024 (I suspect it will be usable about a year before the west line opens), how much space will be cleared at Belfast? And how will testing work? Anyone know how they've done it in other cities?
If I'm not mistaken, the Stage 1 yard had space for more than just 34 vehicles. The expansion isn't big because a lot of the additional trains can be store in the existing space. A temporary storage tent is apparently being added in the southeast corner of the yard though.

Testing could be done overnight.
Reply With Quote
     
     
  #1638  
Old Posted Mar 13, 2019, 4:39 AM
jchilds72 jchilds72 is offline
Registered User
 
Join Date: Jun 2018
Posts: 69
Reply With Quote
     
     
  #1639  
Old Posted Mar 13, 2019, 12:03 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,943
Thanks!

So Belfast has space for 66 vehicles with an additional 6 in the temporary storage sheds. So it will be more than maxed out for a few years but have plenty of space to expand the fleet at Belfast and no doubt Moodie for quite some time thereafter.

The additional 38 vehicles should be ready by 2021, which made sense (for a good chunk) when the east line was to open by 2022 and west 2023. We've just added a couple years with an inflated fleet. Too bad we couldn't phase in the expanded fleet, though that might have effected the price.
Reply With Quote
     
     
  #1640  
Old Posted Mar 13, 2019, 8:11 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,627
Quote:
Originally Posted by Mikeed View Post
https://youtu.be/idFiNcCfYBc

First glimpse of a coupled train in motion I've seen.
Cool. Despite the setbacks, I still think it's great to see LRT running in Ottawa.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 1:23 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.