Quote:
Originally Posted by Truenorth00
We will literally be at those levels at launch of Phase 2. Whatever the frequency on the branches, it will be double in the central portion. So 10 min headways at a branch, means 5 min headways in the tunnel. 8 min headways at Baseline and Moodie mean 4 minute headways in the tunnel. Are you starting to see why interlining is becoming problematic?
|
And as I wrote in a post, just as you were writing this one I assume, 4 minute headways would be at half the capacity of the tunnel, and probably even less than half if the automated systems can push headway to every 90 seconds (which is quite likely). At that headway you could run 10 trains an hour from the T-Line and still have enough capacity to serve Barrhaven and Kanata with 14 trains an hour, each.
Quote:
Originally Posted by Truenorth00
Where do people get the idea that something like this would be free? Aside from the infrastructure needed to enable a connection, the operational complexity involved absolutely incurs costs.
|
Yes, a cost is incurred if it is built. But leaving the option open means just that. They probably don't even have to do anything. If Bayview station is kept in its same location, or just a bit further south, that leaves plenty of room to the north to build interline, a POW connections, if that is what is decided would work best in the future.
Quote:
Originally Posted by Truenorth00
More broadly, when interlining occurs elsewhere, in my experience, you have a much more even load between branches. This is not what we'd have at Bayview. Indeed, I'm not sure interlining would see Bayview actually served by the Trillium Line.
|
There is no reason Bayview wouldn't be served. Doing so would be rather simple.
Quote:
Originally Posted by Truenorth00
What we left open is the possibility of a connection across the river. There's no specific requirement for the Trillium line to go across. And depending what happens in Gatineau, it may make more sense for their LRT to cross than the Trillium Line.
|
This is true. That might be the case. I have always stated that the proposition of using the POW bridge for LRT (be it Ottawa's or Gatineau's) is a questionable idea. I'm inclined to think it would be a waste to put transit connections across the river, at that location, but like interlining, the option should definitely be left open until it is properly explored.
Quote:
Originally Posted by Truenorth00
Or it's a sign that money doesn't grown trees and the planners made the most of the resources they were allocated.
|
Or it is a sign that the city tried to find a way to expand the T-Line even though pressure from the satellite suburbs put it into second class status, and so many compromises were made that it became a garbage plan. Or it was design by a bunch of mapinistas that found a way to add a maximum amount of lines and dots to the cities transit map despite how it functioned on the ground.
Or it is everything I said, and what you said, and more. You could argue who's fault it was that the T-Line has became a rubbish plan, but in the end that doesn't matter. At this point it should be about figuring out what the options are going forward so that the T-Line actually has a real path towards modernization, and that money isn't being wasted on a line, and corridor, that will deliver sub-par service with a 20 year old design.