Regardless of runoff any exposed soil not under active use must be seeded and strawed. Just looking at the pic shown, I would say it is clear much of the lot should be grassed at the moment. I’ve had inspectors site 0.1 acre lots for possible violations of runoff at the top of the lots that had a 9% grade slope with no possible way water would flow uphill. Was completely illogical but they were right under the law. This site definitely fails even without knowing their exact plan under bare minimum standards required.

This poor fella does have a small amount of knowledge from his 21 years in the field and a graduate degree to boot. Lol!
__________________
I live in my own little world but it's ok, they know me here!

The next time you are contemplating what the hell went wrong in your life, look in a mirror!

Last edited by Atlriser; Feb 26, 2019 at 7:31 PM.
Reply With Quote
     
     
  #11522  
Old Posted Feb 26, 2019, 7:36 PM
MARTAisSmarta MARTAisSmarta is offline
Registered User
 
Join Date: Jul 2017
Posts: 263
Quote:
Originally Posted by Atlriser View Post
Regardless of runoff any exposed soil not under active use must be seeded and strawed. Just looking at the pic shown, I would say it is clear much of the lot should be grassed at the moment. I’ve had inspectors site 0.1 acre lots for possible violations of runoff at the top of the lots that had a 9% grade slope with no possible way water would flow uphill. Was completely illogical but they were right under the law. This site definitely fails even without knowing their exact plan under bare minimum standards required.

This poor fella does have a small amount of knowledge from his 21 years in the field and a graduate degree to boot. Lol!
Your first sentence is what I was angling for. They may claim it is "active use" and that they are simply delayed due to weather.
Reply With Quote
     
     
  #11523  
Old Posted Feb 26, 2019, 8:18 PM
Atlriser's Avatar
Atlriser Atlriser is offline
Registered User
 
Join Date: May 2006
Location: Atlanta - Grant Park
Posts: 1,269
They have updated the rules since I was last certified in 2013, but I think the rule was any exposed land not in use for 30 days had to be covered by vegetation. Even if part of the lot is under construction, those that aren’t must be seeded. You can see this on all active construction sites where there is new green grass always growing at the perimeter or even parts that have been graded but won’t be used for a month or two.

Someone please correct me on the exact rule but this whole site being exposed as is would not meet criteria. Even if it was under active use, there are parts that would still need protection such as around the perimeter and I see no protection for runoff prevention or even into any construction retention pond onsite. As stated, given the size and lack of activity covering the entire lot there is no way it is in compliance. They could already be sited for all we know.
__________________
I live in my own little world but it's ok, they know me here!

The next time you are contemplating what the hell went wrong in your life, look in a mirror!
Reply With Quote
     
     
  #11524  
Old Posted Feb 26, 2019, 8:39 PM
daharris80's Avatar
daharris80 daharris80 is offline
Development Spectator
 
Join Date: Jan 2007
Location: Atlanta
Posts: 348
Do we know if there is any active permit for anything activity at the site? One way to give the impression you're under construction would be to put fencing around the lot and make it appear as if its ready for construction, but not actually pay for the construction permit, and avoid inspections.... From the looks of the site they should have a land disturbance permit. I wonder if one was issued, is it still open? Because as much as its a shame how they've allowed the lot to get into this state - it would be even more of a concern that a site with an active permit of any type was allowed to get to this state without any inspection, notice, fine....
Reply With Quote
     
     
  #11525  
Old Posted Feb 26, 2019, 8:48 PM
Atlriser's Avatar
Atlriser Atlriser is offline
Registered User
 
Join Date: May 2006
Location: Atlanta - Grant Park
Posts: 1,269
Even if not an active permit they could be fined and found in violation by the state. A few years back the state had gotten very strict with these types of issues because of the Supreme Court cases with AL and FL over water rights. It was a focus on every site and inspectors would visit randomly. It seems that has lightened up in some counties the past couple years including Fulton but it’s still not something Olympia would want to ignore. Once the state targets a site or company it can get ugly quickly and be a never ending battle. The fines can pile up quickly and can even lead to court filings. I’d say this project is DEAD for sure unless another equity partner appears very soon as in last week lol!

As someone else said, the type of clientele being sought wouldn’t even walk in the sales center with the way the fencing and site appears today.
__________________
I live in my own little world but it's ok, they know me here!

The next time you are contemplating what the hell went wrong in your life, look in a mirror!
Reply With Quote
     
     
  #11526  
Old Posted Feb 26, 2019, 8:59 PM
ATL CTO ATL CTO is offline
Registered User
 
Join Date: Mar 2017
Posts: 74
Quote:
Originally Posted by Atlriser View Post
Even if not an active permit they could be fined and found in violation by the state. A few years back the state had gotten very strict with these types of issues because of the Supreme Court cases with AL and FL over water rights. It was a focus on every site and inspectors would visit randomly. It seems that has lightened up in some counties the past couple years including Fulton but it’s still not something Olympia would want to ignore. Once the state targets a site or company it can get ugly quickly and be a never ending battle. The fines can pile up quickly and can even lead to court filings. I’d say this project is DEAD for sure unless another equity partner appears very soon as in last week lol!

As someone else said, the type of clientele being sought wouldn’t even walk in the sales center with the way the fencing and site appears today.
They had been taking significant deposits from interested buyers for some time now, wonder how much of that money is gone from their burn rate of the past two years.

If I was one of those who put a deposit down, I would be very, very concerned at this point to say the least.
Reply With Quote
     
     
  #11527  
Old Posted Feb 26, 2019, 9:39 PM
Sura Sura is offline
Registered User
 
Join Date: Sep 2016
Location: NoSoNo
Posts: 474
At the end of last year they said they were starting construction early 2019. This is an opinion, but Jan/Feb qualify as early 2019. March 1 is the official day of death for (n)Opus to me.
Reply With Quote
     
     
  #11528  
Old Posted Feb 26, 2019, 10:42 PM
dpoulos27 dpoulos27 is offline
Just a dude
 
Join Date: Nov 2018
Posts: 127
Sad, was excited when it was announced but maybe just too ambitious. Working in hotels, I was more excited when it was going to have a luxury component attached as I feel Midtown is such a great spot to put a Park Hyatt or comparable brand.
Reply With Quote
     
     
  #11529  
Old Posted Feb 26, 2019, 10:59 PM
robertjhajek robertjhajek is offline
Registered User
 
Join Date: Nov 2014
Location: Ormewood Park
Posts: 360
Quote:
Originally Posted by Sura View Post
At the end of last year they said they were starting construction early 2019. This is an opinion, but Jan/Feb qualify as early 2019. March 1 is the official day of death for (n)Opus to me.
Lots of things are suppose to start in Atlanta but are always pushed back. PCM was suppose to open like 2 or 3 years prior. Let's take a second before we pronounce this EVIVA'd
Reply With Quote
     
     
  #11530  
Old Posted Feb 27, 2019, 1:04 AM
Atlriser's Avatar
Atlriser Atlriser is offline
Registered User
 
Join Date: May 2006
Location: Atlanta - Grant Park
Posts: 1,269
This was originally announced 2/5/2014 in the AJC by Olympia. If that doesn’t qualify as DEAD or EVIVA’d I don’t know what does. Five years in development and we have what looks like an abandoned site basically?
__________________
I live in my own little world but it's ok, they know me here!

The next time you are contemplating what the hell went wrong in your life, look in a mirror!
Reply With Quote
     
     
  #11531  
Old Posted Feb 27, 2019, 12:39 PM
MARTAisSmarta MARTAisSmarta is offline
Registered User
 
Join Date: Jul 2017
Posts: 263
Quote:
Originally Posted by robertjhajek View Post
Lots of things are suppose to start in Atlanta but are always pushed back. PCM was suppose to open like 2 or 3 years prior. Let's take a second before we pronounce this EVIVA'd
If you haven't noticed, everyone here wants to be the first to declare something dead or ugly. It's a common pattern.
Reply With Quote
     
     
  #11532  
Old Posted Feb 27, 2019, 2:38 PM
GeorgiaPeanuts GeorgiaPeanuts is offline
Registered User
 
Join Date: Sep 2014
Posts: 1,637
I see the sale center open sign on the sidewalk when I've walked by and the lights are still on there at night so who knows.
Reply With Quote
     
     
  #11533  
Old Posted Feb 27, 2019, 2:41 PM
Sura Sura is offline
Registered User
 
Join Date: Sep 2016
Location: NoSoNo
Posts: 474
Quote:
Originally Posted by MARTAisSmarta View Post
If you haven't noticed, everyone here wants to be the first to declare something dead or ugly. It's a common pattern.
I've always been a proponent of Opus. I'd hate for Librarian to be right about this one after calling him out on it several months ago when they allegedly started construction.
Reply With Quote
     
     
  #11534  
Old Posted Feb 27, 2019, 4:18 PM
ATL CTO ATL CTO is offline
Registered User
 
Join Date: Mar 2017
Posts: 74
Quote:
Originally Posted by GeorgiaPeanuts View Post
I see the sale center open sign on the sidewalk when I've walked by and the lights are still on there at night so who knows.
I went in with my girlfriend a year or so ago to take a look, the sales person was very rude and tried to shoo us out even though we had an appointment. Keep in mind we are well dressed folks rolling up in a new model BMW M6. They deserve to fail with their poor attitudes and lack of professionalism in sales.
Reply With Quote
     
     
  #11535  
Old Posted Feb 27, 2019, 6:09 PM
bigstick's Avatar
bigstick bigstick is offline
Registered User
 
Join Date: Mar 2012
Location: 30327
Posts: 1,980
Quote:
Originally Posted by ATL CTO View Post
I went in with my girlfriend a year or so ago to take a look, the sales person was very rude and tried to shoo us out even though we had an appointment. Keep in mind we are well dressed folks rolling up in a new model BMW M6. They deserve to fail with their poor attitudes and lack of professionalism in sales.
I just talked to the sales center and he told me that ground breaking or going vertical, would be in April, and that it will be 54 stories now,,,,,,
Reply With Quote
     
     
  #11536  
Old Posted Feb 27, 2019, 7:05 PM
jwbab jwbab is offline
Registered User
 
Join Date: Feb 2016
Location: Atlanta, Georgia
Posts: 420
Quote:
Originally Posted by bigstick View Post
I just talked to the sales center and he told me that ground breaking or going vertical, would be in April, and that it will be 54 stories now,,,,,,
That's an ambitious timeline, considering they haven't even filed for a building permit yet.
Reply With Quote
     
     
  #11537  
Old Posted Feb 27, 2019, 7:31 PM
shivtim's Avatar
shivtim shivtim is offline
Registered User
 
Join Date: Aug 2008
Location: Midtown Atlanta
Posts: 2,623
Some movement on 903 Peachtree. They filed today for a planning permit to combine lots.

Reply With Quote
     
     
  #11538  
Old Posted Feb 27, 2019, 8:43 PM
shivtim's Avatar
shivtim shivtim is offline
Registered User
 
Join Date: Aug 2008
Location: Midtown Atlanta
Posts: 2,623
On Monday 99 West Paces Ferry filed their land development building permit. 12 stories with 312 units and 5,900sqft retail.

Reply With Quote
     
     
  #11539  
Old Posted Feb 27, 2019, 8:52 PM
shivtim's Avatar
shivtim shivtim is offline
Registered User
 
Join Date: Aug 2008
Location: Midtown Atlanta
Posts: 2,623
Also the Otis Building in Castleberry Hill filed a land development building permit. This may not seem exciting, but I think it's one of the best examples of infill we've seen in Atlanta. Take a look at the current streetview on Google. This slots in perfectly between two existing people-scaled buildings, and it's built right to the lot line on each side.

Reply With Quote
     
     
  #11540  
Old Posted Feb 27, 2019, 9:57 PM
bigstick's Avatar
bigstick bigstick is offline
Registered User
 
Join Date: Mar 2012
Location: 30327
Posts: 1,980
I called OPUS and this is the email I got.

I truly am interested in buying. S this is very legit..And it will now be 54 floors


It was a pleasure chatting with you earlier. Per our conversation please see below and attached:

2BR & 3BR Plans w/Pricing (attached)
Occupancy: Spring/Summer 2021
HOA Overview: (attached)
Deposit Schedule: (attached)
More Amenities/Highest Level of Service of any residential building in ATL: http://opusplaceatlanta.com/the-opus-club
Teaser Video: https://www.youtube.com/watch?v=ZKLQI5lrrmA
Views: http://opusplaceatlanta.com/views/?v=45th-floor&m=n


As you might have heard the Developer received the greenlight to build the building back in December and the Developer is now full-speed ahead finalizing construction plans and permits with the Architects and City with the goal of going vertical by May/June.

Because this project is a completely new level of luxury for the city the Developer built a fully-furnished 3-BR model with our over-the-top standard finishes in the back of our sales gallery. Here your client can walk through one of our homes and see the views from every 5th floor and every corner on our 10' tall video wall.

We are in the Sales & Model Gallery Monday-Friday (11am-5pm) and Sunday (Noon-4pm). Let me know when you get back and we can schedule a time for you to see the model. NOTE: because we have been so busy appointments are recommended.

Please let me know if you have any questions or how I can assist.

Thanks!

-Matt


Matthew Doyle
No.2 Opus Place

98 14th Street NE
Atlanta, GA 30309
404.459.3091 (o)
561.707.6139 (c)
[email protected]
www.OpusPlaceATL.com
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 4:18 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.