Just learn that BC added more funding for the high speed rail between Seattle and Surrey. It is planned to be built by 2035. I will be over 70 by that time. As usual, it will be delayed and delayed. I really don't know if I can see that in my life time. With World economy slowing down, GDP drops to 1.7 to 1.9 this year, not sure where they come up $42B by 2023 to start the project
Last year, Surrey also added funding to study LRT and all these millions are down the toilet now. I wonder how they can make use the real LRT demo train they built for the show. Let's hope they can really start the Expo Line Skytrain extension project to Langley or wherever before they run out of money. Construction and material cost is increasing so fast due to the mad man in white house in DC..... Our tax money is easily come and easily gone.