HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation


View Poll Results: Is SEPTA doing a great job in regards to bus, subway, and commuter rail overall??????
YES 61 48.41%
NO 65 51.59%
Voters: 126. You may not vote on this poll

Reply

 
Thread Tools Display Modes
     
     
  #1361  
Old Posted Feb 5, 2019, 6:07 PM
skyscraper skyscraper is offline
BANNED
 
Join Date: Feb 2006
Posts: 1,374
Quote:
Originally Posted by Skintreesnail View Post
investing in a TBM would make sense I guess if they had solid expansion plans, like the blvd subway or patco extension, but they don't as far as I'm aware. It feels more like they're trying to undermine the idea of the extension by putting such a high price tag on it. I'd be interested if anyone has insight into the different methods of tunnel construction, but from what I've read cut and cover is significantly less. Even if the majority of the cost is station-related, they only have one station planned. It just seems strange to me.
also they should go with one of the 2-station options: one of the stations is in the commercial office district, and one in the industrial district. maybe if they do cut and cover, they'd be able to afford both stations.
the blue option seems best for that; the office district station is closer to most of the offices than the pink option.
Reply With Quote
     
     
  #1362  
Old Posted Feb 6, 2019, 8:56 PM
mcgrath618's Avatar
mcgrath618 mcgrath618 is offline
Moderator
 
Join Date: Jan 2017
Location: Clark Park, Philadelphia, PA
Posts: 4,029
I just saw what was either the CSX Geometry Train or, more likely, the CSX Business Train go over the High Line today. Anyone know more about this?
Reply With Quote
     
     
  #1363  
Old Posted Feb 7, 2019, 3:02 PM
Parkway's Avatar
Parkway Parkway is offline
Registered User
 
Join Date: Oct 2007
Location: Philadelphia
Posts: 900
Quote:
Originally Posted by mcgrath618 View Post
I just saw what was either the CSX Geometry Train or, more likely, the CSX Business Train go over the High Line today. Anyone know more about this?
I don't know anything but I wish I did. I can see the High Line from my office.
__________________
"It's like a giant ball of peanut butter with a stick of Dynamite in the middle."
Reply With Quote
     
     
  #1364  
Old Posted Feb 8, 2019, 8:10 PM
mcgrath618's Avatar
mcgrath618 mcgrath618 is offline
Moderator
 
Join Date: Jan 2017
Location: Clark Park, Philadelphia, PA
Posts: 4,029
http://www.septa.org/rebuilding/news/route1-closure-2019.html
Looks like they're finally putting in the new bridge at Wawa.
Reply With Quote
     
     
  #1365  
Old Posted Feb 15, 2019, 6:02 PM
mcgrath618's Avatar
mcgrath618 mcgrath618 is offline
Moderator
 
Join Date: Jan 2017
Location: Clark Park, Philadelphia, PA
Posts: 4,029
It's PATCO's 50th anniversary today!
Fares are the same as they were in 1969, with basic fares at $0.30.
Reply With Quote
     
     
  #1366  
Old Posted Feb 25, 2019, 8:11 PM
mcgrath618's Avatar
mcgrath618 mcgrath618 is offline
Moderator
 
Join Date: Jan 2017
Location: Clark Park, Philadelphia, PA
Posts: 4,029
SEPTA's billion-dollar plan for new trolleys takes a step forward
https://www.philly.com/philly/business/t...rolleys-make-ada-compliant-20180111.html

$1 Billion? I feel like that that's a bit high...
Reply With Quote
     
     
  #1367  
Old Posted Feb 25, 2019, 9:37 PM
Busy Bee's Avatar
Busy Bee Busy Bee is online now
Closeted Normie
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 13,164
No that sounds about right. The article states half that cost for the new streetcar rolling stock, and that seems right in line with prevailing costs elsewhere of ~3,000,000 per light rail vehicle. The other costs will go towards quite involved physical infrastructure modifications to speed up the system with proper level boarding platforms and new streetscape around the stops. Honestly I would think the number if anything would be higher, it's quite the neccesary investment. Can't wait for it to begin.
__________________
The guy above me designs synthetic hairballs for ceramic cats

Sic semper tyrannis
Reply With Quote
     
     
  #1368  
Old Posted Feb 25, 2019, 10:08 PM
Skintreesnail Skintreesnail is offline
Registered User
 
Join Date: Apr 2006
Posts: 643
Quote:
Originally Posted by mcgrath618 View Post
SEPTA's billion-dollar plan for new trolleys takes a step forward
https://www.philly.com/philly/business/t...rolleys-make-ada-compliant-20180111.html

$1 Billion? I feel like that that's a bit high...
This is good news, I had been reading some things about the turnpike lawsuit that made it seem like this would be delayed. the cost is high, but the system really needs the upgrade. Having something more like light rail with spaced out stops (similar to Boston's green line) makes a lot of sense. the trolley tunnel really provides west Philly with some great transit. Even if the trolley is delayed at the surface, once the tunnel is hit you get to center city in no time. Too bad there's nothing similar for the rest of the city. They could do something similar with the city branch tunnel for north Philly.
Reply With Quote
     
     
  #1369  
Old Posted Feb 25, 2019, 10:15 PM
hammersklavier's Avatar
hammersklavier hammersklavier is offline
Philly -> Osaka -> Tokyo
 
Join Date: Apr 2008
Location: The biggest city on earth. Literally
Posts: 5,630
Quote:
Originally Posted by mcgrath618 View Post
SEPTA's billion-dollar plan for new trolleys takes a step forward
https://www.philly.com/philly/business/t...rolleys-make-ada-compliant-20180111.html

$1 Billion? I feel like that that's a bit high...
The infrastructure upgrades are also a significant part of the project. But I can't help but think that reducing the overall vehicle count rather goes against the whole idea of increasing capacity (even if the new vehicles are larger). As someone who uses the 10 on a more-or-less daily basis as it is, I can tell you that its frequency can get quite iffy at times...

Anyway, trying to pull some images out of the article:


Bumpout design 1 -- This would probably be used on the narrowest streets the trolley runs along (e.g. Lansdowne Ave)


Bumpout design 2 (with bike lanes directed around the bumpouts) -- This is probably going to be the typical design, as Baltimore, Lancaster, Chester, and Woodland all have bike lanes on them IIRC


Carstop design 1 -- This will probably be used on Girard from Front to Broad


Carstop design 2 -- This would look amazing on Girard in Fishtown
__________________
Urban Rambles | Hidden City

Who knows but that, on the lower levels, I speak for you?’ (Ralph Ellison, Invisible Man)
Reply With Quote
     
     
  #1370  
Old Posted Feb 25, 2019, 10:30 PM
Skintreesnail Skintreesnail is offline
Registered User
 
Join Date: Apr 2006
Posts: 643
Quote:
Originally Posted by hammersklavier View Post
But I can't help but think that reducing the overall vehicle count rather goes against the whole idea of increasing capacity (even if the new vehicles are larger). As someone who uses the 10 on a more-or-less daily basis as it is, I can tell you that its frequency can get quite iffy at times...
Yeah, I was kind of skeptical about the reduced number of cars too. Maybe they're thinking the reduced number of stops will speed it up enough to make up the difference, but 39 cars seems like an awful lot to give up.
Reply With Quote
     
     
  #1371  
Old Posted Feb 25, 2019, 10:42 PM
Busy Bee's Avatar
Busy Bee Busy Bee is online now
Closeted Normie
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 13,164
I would not be the slightest bit surprised though if the trolley contract includes options for future cars as well. Something along the lines of at the tail end of deliveries SEPTA could option for 30 additional vehicles... something like that.
__________________
The guy above me designs synthetic hairballs for ceramic cats

Sic semper tyrannis
Reply With Quote
     
     
  #1372  
Old Posted Feb 25, 2019, 10:52 PM
Skintreesnail Skintreesnail is offline
Registered User
 
Join Date: Apr 2006
Posts: 643
Quote:
Originally Posted by mcgrath618 View Post
SEPTA's billion-dollar plan for new trolleys takes a step forward
https://www.philly.com/philly/business/t...rolleys-make-ada-compliant-20180111.html

$1 Billion? I feel like that that's a bit high...
I just noticed the article was from last Jan. So I guess the turnpike lawsuit is going to be a problem. Sigh...
Reply With Quote
     
     
  #1373  
Old Posted Feb 26, 2019, 1:29 AM
Delthayre Delthayre is offline
Registered User
 
Join Date: Feb 2010
Location: Philadelphia, Pennsylvania
Posts: 45
Everything's on fire

Quote:
Originally Posted by Skintreesnail View Post
I just noticed the article was from last Jan. So I guess the turnpike lawsuit is going to be a problem. Sigh...
Yes. Barring legislative action, should the lawsuit be decided in favor of the truckers associations, SEPTA would be very significantly short on funding until it begins receiving vehicle sales tax revenue beginning in fiscal year 2022-2023, per § 1506(c)(3.4) of Title 74 of the Pennsylvania Code, as amended by Act 89 of 2013. (Funding at that point will still be slightly less than originally envisioned as the Turnpike is still scheduled to transfer $ 50 million annually from that point, which it presumably will not if the judge rules against the Commonwealth) The authority has begun stopping work on projects in response, as listed in the article.

Quote:
Originally Posted by Jason Laughlin in the Philadelphia Inquirer on February 25th, 2019
SEPTA officials put almost 40 improvement projects on hold this month as it awaits the outcome of a lawsuit that could slash a third of its capital budget by this summer.
Construction that is underway is continuing, but design work on 21 projects has stopped. Those stalled include high-profile work such as the $1 billion plan to modernize the trolley network with new vehicles, a $59 million renovation of the transit hub beneath City Hall, and work on stations at Secane, Noble, Tasker-Morris, and Villanova. Purchasing for 16 other projects has also stopped.

...

List of postponed projects

...

Do not start design

...

Trolley modernization

Last edited by Delthayre; Feb 26, 2019 at 2:16 AM.
Reply With Quote
     
     
  #1374  
Old Posted Feb 26, 2019, 3:55 PM
Skintreesnail Skintreesnail is offline
Registered User
 
Join Date: Apr 2006
Posts: 643
WTF^^ that's a long list of projects impacted. The bridges are the most worrisome to me. Some are in pretty bad shape I think. It seems like truckers should be supporting rail projects because it takes cars off the road. Also, PA isn't even in the top 10 highest toll states:

https://ezfreightfactoring.com/blog/expensive-toll-roads-united-states
Reply With Quote
     
     
  #1375  
Old Posted Feb 28, 2019, 4:11 AM
City Wide City Wide is offline
Registered User
 
Join Date: Aug 2014
Posts: 1,627
Even if SEPTA wins the current lawsuit I still don't know where $1B for upgrading existing service is going to come from. Are the Feds going to come through with big bucks. If this plan does go forward my guess is that SEPTA will take one of it's lines, say the #34 since it isn't too long, and try to cobble together funding to redo that line as a demonstration model.
One way or another the trolleys are coming to the end of their service life so they'll need to be replaced or rebuilt (which SEPTA has already done once before with the present model) in the near future. I wonder how much infrastructure changes would be required to run the new style trolleys on the present lines; things like turning radius and entrance into the tunnel?
Reply With Quote
     
     
  #1376  
Old Posted Feb 28, 2019, 1:37 PM
electricron's Avatar
electricron electricron is offline
Registered User
 
Join Date: Aug 2008
Location: Granbury, Texas
Posts: 3,614
Lightbulb

Quote:
Originally Posted by City Wide View Post
One way or another the trolleys are coming to the end of their service life so they'll need to be replaced or rebuilt (which SEPTA has already done once before with the present model) in the near future. I wonder how much infrastructure changes would be required to run the new style trolleys on the present lines; things like turning radius and entrance into the tunnel?
The design specifications released for the new trolleys lists minimum turning radius of 34 feet, which is achievable with modern streetcars (I'm not including larger light rail vehicles). The key factor in any vehicle design for tighter turning radius is how far the wheel axels (in this case trucks or bogies) are apart.
Modern streetcar articulate designs allow adding trucks keeping this one dimension less than to equal to older non articulate streetcar designs.
Reply With Quote
     
     
  #1377  
Old Posted Feb 28, 2019, 4:26 PM
Skintreesnail Skintreesnail is offline
Registered User
 
Join Date: Apr 2006
Posts: 643
If they can get a billion for the KOP extension (which doesn't appear to be on the chopping block), I would hope they can do the same for the trolleys. The NHSL daily ridership less than each of the subway-surface trolley lines alone:

https://septa.org/strategic-plan/reports/route-statistics.pdf

The KOP extension is definitely needed and will drive the ridership way up/help with road congestion, but the trolleys are just as important. And there're some safety-related projects (bridges) that are getting deferred that I would think would be more important. There was some more news about the lawsuit yesterday:
https://www.phillymag.com/news/2019/02/27/septa-turnpike-lawsuit/

Hopefully that "obscure" federal law that NY was able to use to dismiss their suit can be applied in this case. It's still going to end up delaying some much-needed improvements.

In other news, SEPTA is working on some new maps:
http://www.septa.org/frequency/img/2019-full-frequency-map.pdf
http://www.septa.org/frequency/img/2019-high-frequency-map.pdf

Philly Voice article:
https://www.phillyvoice.com/septa-introduces-two-new-bus-map-concepts-feedback/
Reply With Quote
     
     
  #1378  
Old Posted Feb 28, 2019, 5:20 PM
Parkway's Avatar
Parkway Parkway is offline
Registered User
 
Join Date: Oct 2007
Location: Philadelphia
Posts: 900
Quote:
Originally Posted by Skintreesnail View Post
Yeah, I was kind of skeptical about the reduced number of cars too. Maybe they're thinking the reduced number of stops will speed it up enough to make up the difference, but 39 cars seems like an awful lot to give up.
If the cars hold twice as many people and you shift from 5 to 7 minute headways during the peak you are still seeing a big increase in overall capacity while freeing up operating funds to increase frequency during the off-peak and on weekends. That increased frequency combined with faster rides (due to fewer stops) should, in theory, drive a ridership increase.
__________________
"It's like a giant ball of peanut butter with a stick of Dynamite in the middle."
Reply With Quote
     
     
  #1379  
Old Posted Feb 28, 2019, 7:15 PM
mcgrath618's Avatar
mcgrath618 mcgrath618 is offline
Moderator
 
Join Date: Jan 2017
Location: Clark Park, Philadelphia, PA
Posts: 4,029
Reply With Quote
     
     
  #1380  
Old Posted Feb 28, 2019, 7:44 PM
Busy Bee's Avatar
Busy Bee Busy Bee is online now
Closeted Normie
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 13,164
Quote:
Originally Posted by electricron View Post
The design specifications released for the new trolleys lists minimum turning radius of 34 feet, which is achievable with modern streetcars (I'm not including larger light rail vehicles). The key factor in any vehicle design for tighter turning radius is how far the wheel axels (in this case trucks or bogies) are apart.
Modern streetcar articulate designs allow adding trucks keeping this one dimension less than to equal to older non articulate streetcar designs.



Yes, Philly's tight turns guarantee a minimum 3 bogie tram/trolley, likely 4.
__________________
The guy above me designs synthetic hairballs for ceramic cats

Sic semper tyrannis
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 6:31 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.