Reading through the station descriptions, I wanted to critic the location and lay-out of each. I won't go into the design aesthetics; though I was initially disappointed that they value-engineered the design language of Stage 1, I understand that some sacrifices need to be made in order to expand the system. That might be how the winning consortium was able to get a price, not within budget, but within "affordability".
This is based off the document describing each station. In parentheses, I've indicated my preferred name for the station, should it be different from the presentation.
https://app05.ottawa.ca/sirepub/cache/2/03f5y2hirvcglz23htbtbodt/56880702232019112752335.PDF
Westboro: Wish they would have removed the busway on the north side and had the two bridges as pedestrian/cycling only. Any buses serving the station can do it via Scott.
Dominion (Kitchissippi): Shifting it west was a good move to make it more visible and accessible. Rendering shows the transformer station (or whatever it's called); wish they could be hidden from view by placing them within the trench wall.
Cleary (McKellar or Sherbourne): The station description provides an explanation for the shift to the Byron Strip. It was done to reduce "risks in relation to the tunnel alignment and construction adjacent to the West Nepean Collector Sewer". It was also done to save money by removing the ventilation requirements of an underground station and simplify the track alignment. I personally preferred the previous underground location. It would have provided an opportunity for a great shallow underground station design (see Westbrook in Calgary) and the possibility for integration with a new adjacent development. This could also be viewed as a betrayal by nearby residents who were consulted to death before they agreed with the previous design.
New Orchard (Ambleside or Woodland): Functional as a local neighborhood station. Again, don't understand the glass wall in front of the entrance (as per my comments on the East Stage 2 thread for Montreal Station).
Lincoln Fields:I would have preferred a station design that provided access on both sides of Carling. This would also have provided more coverage at the platform level. I understand how this placement avoids the flood plains and provides better access to the bus loop.
Queenview: Hoping for some serious TOD between the Queensway and Queensview along with the south side of the Queensway.
Pinecrest (Dumaurier): As with New Orchard, this seems to be the best that could be provided the adjacent community. A pedestrian bridge to Redwood across the Queensway could have been useful.
Bayshore: I'm glad the consortium decided to use as much of the existing structure as possible in order to minimize costs and waste. The City's proposal to shift it east to better connect with the mall would have been detrimental to the local residents and push the price tag up significantly. This design is much more community oriented. Love the atrium at the north end.
Moodie: Nice to see the fare-paid area. The description talks about a DND HQ bus shuttle, which was very important in my view.
Iris: They were able to design the station without elevators, which is probably best for such a low-usage station. They have better keep the pathways and ramps clear in winter though.
Baseline (Algonquin): When they built the station box just a few years ago, they provided shafts for future vertical circulation. I know the City requested it be shifted south, but the proponent ignored many of the City's preliminary designs to save money. Why not this one? The main entrance should have been where it was supposed to be originally based on the aerial photograph below. The pedestrian bridge from Algonquin could have connected there instead, providing a direct line from the main campus, through the trades building into the station instead of the detour to the proposed main entrance.