Quote:
Originally Posted by Multi-modal
This is my concern as well. Getting dropped off at the east Trillium line platform and transferring to westbound confederation line seems terrible. You'd have to walk all the way around the end of the trillium line tracks to get to the elevators and escalators, and it seems like you'd have to exit and re-enter the fair paid zone. I'm disappointed another set of escalators and elevators won't be added to the east side of the station.
|
You would think that the city would learn from its previous mistakes with the Trillium line, but it just keeps on making more mistakes. The first mistake was not keeping the original alignment and elevation of the CPR trackage. This would have moved the further west under the bridge on Scott Street and the Transitway. So given that they didn't do that when they built the Trillium line for supposed ease of access to the Transitway they should have changed the alignment back to the original when the tender was issued for the Confederation Line.
The best long term option would have been to build a concourse level from between the Trillium Line and the Confederation Line to provide access to both the eastbound and westbound Confederation Line. There may not be enough height to do this now. This would mean lowering the Trillium Line tracks back to their original elevation and rebuilding the escalators and stairs from the current platform.
If phase 3 ever proceeds with a link to Gatineau the problem becomes compounded because you will have both eastbound and westbound Confederation Line users transferring to north bound trains. This is why a concourse is required. Other wise you will have to build up and down escalators, stairs and elevators to allow for transfers in any direction.
As a short term solution until phase 3 is built, you could temporarily shorten the current track by moving the bumper post further south and extending the current platform at Bayview further east to connect to the new platform on the east side of the current tracks. By expanding the Fare Paid Area you would avoid the cost of additional escalators, stairs and elevators.
Once again; the city is penny wise and pound foolish. Bayview will be under construction for years and we will never have a station that will be able to handle the volume.
Quote:
Originally Posted by Multi-modal
Agreed. Trinity should instead build a second entrance from their more northern two towers to the north end of the platform. That would at least be helpful.
|
Why should Trinity pay for the city's prior mistakes?