Quote:
Originally Posted by Cirrus
1.3 miles for $285M is $219M/mile. Still a gigantic amount for a streetcar, but IDK how you got to $450M.
|
I misappropriated the Denominator and the Numerator? It was late?
That was rather unbecoming of me.
Getting around to it
Thinking of Seattle and other places, RTD's needs are starting to crystalize.
Approve $15 billion in new RTD funding. We'll call it
Smooth Operator. (And definitely use that song as a backdrop for promotional ads)
$5.5 billion for rail upgrades
$3.5 billion for Urban Rail- The vaunted Urban Signature Line
- The Colorado Blvd Connector Line
I learned recently how much higher Colorado Blvd traffic counts were compared to South Broadway. Light rail serving the Denver Zoo and Denver Museum of Nature and Science would be cool. Enhanced hubbing or strategic transfer points at I-25/Broadway, Colorado Blvd/I-25 Station, Colorado Blvd/Speer-Leetsdale Line and Colorado Blvd/40th and Colorado A Line Station is smart connectivity.
Seattle teaches that Grade Separation is a winning ticket so more is better than less when it comes to grade separated intersections.
$2 billion for FasTracks updates and upgrades- The A Line needs to (eventually) be 100% grade separated and double-tracked
- The R Line needs its Express tracks along I-225. Stupid happens; the bigger sin is not to correct one's mistakes.
- The B Line extended to Westminster's new downtown and Broomfield.
- Creating commuter rail during peak morning and afternoon periods between Longmont/Boulder and Broomfield using BNSF tracks
- Light Rail grade separation at Speer Blvd.
Additional options would be other grade separated intersections. Is the SW Extension still a desired thing?
N Line extension?
Name your own priority.