HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #1501  
Old Posted Feb 22, 2019, 7:24 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,110


New map shows dotted blue lines indicating future LRT extensions including the alignment decided on in the Kanata EA. Also has Barrhaven... and Gatineau!
Edit: Does this make Gatineau "officially" part of the Stage 3 plan?
Reply With Quote
     
     
  #1502  
Old Posted Feb 22, 2019, 7:41 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,773
Quote:
Originally Posted by OCCheetos View Post
Edit: Does this make Gatineau "officially" part of the Stage 3 plan?
Ottawa' showing the Trillium cross into Gatineau while Gatineau is proposing to cross their future network at both PoW and Alexandra.

Both cities need to get their act together and discuss who's system will cross which bridge(s).
Reply With Quote
     
     
  #1503  
Old Posted Feb 22, 2019, 8:02 PM
Ottawaresident Ottawaresident is offline
BANNED
 
Join Date: Jan 2019
Location: Guess! Hint: It's in my username
Posts: 317
Hooray! LRT that actually goes places! And not just Blair through downtown to Tunney's (Useless)
Reply With Quote
     
     
  #1504  
Old Posted Feb 22, 2019, 8:06 PM
corynv corynv is offline
Registered User
 
Join Date: Jun 2018
Posts: 171
Quote:
Originally Posted by Ottawaresident View Post
Hooray! LRT that actually goes places! And not just Blair through downtown to Tunney's (Useless)
It's not useless. If we didn't have this in place 1st we'd never have gotten funding at all. Plus Tunney's isn't nowhere, it's a pretty big employment area.
Reply With Quote
     
     
  #1505  
Old Posted Feb 22, 2019, 8:13 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,110
https://twitter.com/jchianello/status/1099037596980838401

Holy $$$$ Batman
$4.6 billion? Where's that extra $1 billion going to come from? We still don't even have the $1.2 billion from the province?
Reply With Quote
     
     
  #1506  
Old Posted Feb 22, 2019, 8:19 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,773
I'm not impressed with the people working on our LRT projects at the City. They under-estimated the cost of Stage 1 by $400 million and blew the budget even worse this time around. And that's with the cheapest Confederation bidder. Will they be doing shoddy-ass work to stay within budget?
Reply With Quote
     
     
  #1507  
Old Posted Feb 22, 2019, 8:21 PM
Ottawaresident Ottawaresident is offline
BANNED
 
Join Date: Jan 2019
Location: Guess! Hint: It's in my username
Posts: 317
Oh my, accidents?
Reply With Quote
     
     
  #1508  
Old Posted Feb 22, 2019, 8:26 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,777
Way over budget. That is not good news. Will the plan be cut back?
Reply With Quote
     
     
  #1509  
Old Posted Feb 22, 2019, 8:27 PM
Ottawaresident Ottawaresident is offline
BANNED
 
Join Date: Jan 2019
Location: Guess! Hint: It's in my username
Posts: 317
Hopefully not
Reply With Quote
     
     
  #1510  
Old Posted Feb 22, 2019, 8:28 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,110
Quote:
Originally Posted by lrt's friend View Post
Way over budget. That is not good news. Will the plan be cut back?
Doesn't look like it. They intend to go through with the full thing and the city will take on the additional $1 billion.

https://twitter.com/meganshawCTV/status/1099038910599127042
Reply With Quote
     
     
  #1511  
Old Posted Feb 22, 2019, 8:32 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,777
It looks like South Keys station will work the way I thought with the airport shuttle arriving on the west side. A little awkward with two way busway, two way Trillium Line and airport shuttle lined up next to each other.
Reply With Quote
     
     
  #1512  
Old Posted Feb 22, 2019, 8:34 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,777
Are they relocating Walkley Station? The picture has it next to a pedestrian overpass, which is presumably Walkley Road. The original plan had adjacent to a condo a fair distance to the south of Walkley.
Reply With Quote
     
     
  #1513  
Old Posted Feb 22, 2019, 8:37 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,110
Quote:
Originally Posted by lrt's friend View Post
Are they relocating Walkley Station? The picture has it next to a pedestrian overpass, which is presumably Walkley Road. The original plan had adjacent to a condo a fair distance to the south of Walkley.
Those renders don't include adjacent buildings (just look at Bayview). The overpass in the picture is just a poor rendering of the existing overpass over the tracks right next to the condos. That is, unless it's rebuilt (which wasn't part of the plan).
Reply With Quote
     
     
  #1514  
Old Posted Feb 22, 2019, 8:41 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,777
Wow! We are shutting the Trillium Line down for over 2 years, and we still don't get double tracking. This is just incredible.

It makes 2006 look like a steal considering what it was going to accomplish.
Reply With Quote
     
     
  #1515  
Old Posted Feb 22, 2019, 8:42 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,773
Quote:
Originally Posted by OCCheetos View Post
Those renders don't include adjacent buildings (just look at Bayview). The overpass in the picture is just a poor rendering of the existing overpass over the tracks right next to the condos. That is, unless it's rebuilt (which wasn't part of the plan).
Where did you see a image of Bayview? I've only seen what Megan Shaw posted so far.
Reply With Quote
     
     
  #1516  
Old Posted Feb 22, 2019, 8:44 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,110
Quote:
Originally Posted by J.OT13 View Post
Where did you see a image of Bayview? I've only seen what Megan Shaw posted so far.
It was in the same tweet as the other Trillium Line images


https://twitter.com/meganshawCTV/status/1099033023029407747

Hoping these slides get posted somewhere soon.
Reply With Quote
     
     
  #1517  
Old Posted Feb 22, 2019, 8:45 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,773
Oooops. Missed that one. Bayview is still single track?
Reply With Quote
     
     
  #1518  
Old Posted Feb 22, 2019, 8:46 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,777
Quote:
Originally Posted by J.OT13 View Post
Where did you see a image of Bayview? I've only seen what Megan Shaw posted so far.
It was one of her pictures. I don't get why Bayview was there and there appeared to be some pedestrian walkway going somewhere. I couldn't figure why Bayview was even being displayed. I guess they need to change the station with the longer FLIRT trains.
Reply With Quote
     
     
  #1519  
Old Posted Feb 22, 2019, 8:47 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,110
Quote:
Originally Posted by lrt's friend View Post
It was one of her pictures. I don't get why Bayview was there and there appeared to be some pedestrian walkway going somewhere. I couldn't figure why Bayview was even being displayed. I guess they need to change the station with the longer FLIRT trains.
The pedestrian walkway would be linked to the Trinity developments. It was included in some of their renders IIRC.
Reply With Quote
     
     
  #1520  
Old Posted Feb 22, 2019, 8:51 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,773
Dominion



Cleary, now in the Byron Linear Park instead of integrated with a building across the street. Winner.


https://twitter.com/DenVan/status/1099029913061928962

Them shitty looking stations.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 5:16 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.