HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Feb 22, 2019, 5:42 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,050
Quote:
Originally Posted by Richard Eade View Post
If HSR happens, perhaps the VIA station could be moved to beside, and connect with, the Hurdman transit station; and the intercity bus facilities could be integrated at the same time. Such a move would form a real transportation hub and release the land VIA is using on Tremblay. It doesn't look as if VIA uses the array of tracks behind the Tremblay building.
1) HSR is not happening anytime soon. And possibly not in our lifetimes. We'll be lucky if HFR gets through unmolested.

2) HFR or HSR, Ottawa will not be a terminus, it will be a through station. As such, the station approaches are very much relevant. And VIA will not be interested in moving the station to facilitate a transit hub, if it negatively impacts the intercity train service.

3) What you propose is a billion dollar endeavour in a country where transit is at best, tolerated, in a city where we still can get sub-10 min bus service to most of the city. There's no way anybody is funding this billion dollar hub. Whatever gets built, it'll be done as cheaply as possible. Far easier and cheaper to build a rail/bus/transit hub at Tremblay than to move the VIA station to Hurdman. It's also questionable cost-benefit ratio when all you're adding is the SE Transitway.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 3:02 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.