HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


Closed Thread

 
Thread Tools Display Modes
     
     
  #11921  
Old Posted Feb 4, 2019, 11:29 PM
SpongeG's Avatar
SpongeG SpongeG is online now
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 39,945
oops something went wrong

the link doesn't work
__________________
belowitall
     
     
  #11922  
Old Posted Feb 5, 2019, 3:40 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
     
     
  #11923  
Old Posted Feb 9, 2019, 6:09 PM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 601
YEG Future Extensions Conceptual Plans

From January 21, 2019 council meeting.

http://sirepub.edmonton.ca/sirepub/mtgviewer.aspx?meetid=2291&doctype=AGENDA

Getting it closer to "shovel ready."

https://edmontonjournal.com/news/local-n...crossing-plans-for-future-lrt-extensions

Quote:
... For the Capital Line [South] extension, among the major changes is an extra station added at Twin Brooks. The changes also formalized the location of a maintenance and operations facility.

Administration wanted council approval on their design suggestions for both lines so it can move ahead with engineering work on the plans, said Brad Smid, director with LRT expansion and renewal.

Smid said the city is committed to finalizing the preliminary design plans by March 2020. But there’s still no firm timeline on when construction could begin. ...

The Metro Line extension updates will see underpasses for the train as it travels north on 113A Street at 137 Avenue and west along 153 Avenue at 127 Street. The transition as the line turns west along 153 Avenue from Castle Downs Road will be at grade. ...
     
     
  #11924  
Old Posted Feb 12, 2019, 5:16 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,452
3D Tour of Lyon Station in Downtown Ottawa now available.

http://www.octranspo.com/ready4rail/my_station

Along with project update. See "February 2019 FEDCO update".

http://keithegli.ca/ottawas-light-rail-transit-updates/
     
     
  #11925  
Old Posted Feb 12, 2019, 5:17 PM
p_xavier p_xavier is offline
Registered User
 
Join Date: Dec 2006
Posts: 3,568
Québec's transportation minister confirmed that the government requested the CDPQi 40km+ of REM extensions to be studied for construction.
     
     
  #11926  
Old Posted Feb 13, 2019, 4:20 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,664
Quote:
Originally Posted by d_jeffrey View Post
Québec's transportation minister confirmed that the government requested the CDPQi 40km+ of REM extensions to be studied for construction.
Now I really hope Quebec and VIA can figure something out regarding the Mount Royal Tunnel.

==========

As for Toronto, here are some photos that I took at Kennedy Station of Eglinton Crosstown LRT construction:
https://imgur.com/a/M3qeko4
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
     
     
  #11927  
Old Posted Feb 13, 2019, 5:43 PM
MalcolmTucker MalcolmTucker is online now
Registered User
 
Join Date: May 2007
Posts: 11,578
Quote:
Originally Posted by Dengler Avenue View Post
Now I really hope Quebec and VIA can figure something out regarding the Mount Royal Tunnel.

==========

As for Toronto, here are some photos that I took at Kennedy Station of Eglinton Crosstown LRT construction:
https://imgur.com/a/M3qeko4
There is nothing to figure out. It will have to be replaced, or the route entirely different.
     
     
  #11928  
Old Posted Feb 14, 2019, 1:47 AM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 601
GO RER Update from IO

https://canada.constructconnect.com/dcn/.../io-tackle-go-rer-reworked-planning-team

GO RER RPFs (Pkg 2 is Off-Corridor projects) possible this spring and a $13.5b deficit slaying conundrum...

Quote:
… Toigo said the RER project is not immune from the provincial government’s review of all major projects planned for the province. He said the government is doing its due diligence on the project and if the next phases receive a green light in the provincial budget, expected in late March, both package 2 and OnCorr could go to market with an RFP anticipated in late spring or early summer. ...
     
     
  #11929  
Old Posted Feb 15, 2019, 2:02 PM
giallo's Avatar
giallo giallo is online now
be nice to the crackheads
 
Join Date: Apr 2002
Location: Vancouver
Posts: 12,669
A well shot and detailed video of the Skytrain going from Surrey to Vancouver's newly renovated Commercial/Broadway station.

Video Link
     
     
  #11930  
Old Posted Feb 18, 2019, 5:44 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
Construction at Kennedy for the ECLRT: https://youtu.be/xbA3uINsSCk

Curious if anyone knows what a future Kennedy without the RT guideway going through it would look like?

Would be a GREAT location for TOD . . .
     
     
  #11931  
Old Posted Feb 18, 2019, 8:43 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,452
Update on Ottawa's rail projects. It seems the Confederation Line's builder (RTG) will miss a third deadline. Although the system and stations are essentially complete, not all trains have been certified and tested. Two of the trains are supposedly unusable for unspecified reasons and so we are fast-tracking two of the Stage 2 trains in order to have a full fleet upon opening. RTG believes they can meet the March 31 deadline, but the head of OC Transpo and Mayor are highly skeptical.

https://www.cbc.ca/news/canada/ottawa/ottawa-buys-light-rail-train-no-track-record-1.5017483
https://www.cbc.ca/news/canada/ottawa/lrt-ottawa-opening-schedule-1.5014673

A bigger problem is funding availability for Stage 2. Although Doug has promised support for the next phase numerous times since the election campaign, he hasn't come through with the province's $1.1 billion contribution yet. Council is supposed to sign the contracts February 28. That can't happen without guarantees from all three levels of government. Note that the contracts have been delayed twice already; signing was supposed to be Q1 2018 however, the bidders asked for an extension to finalize their submissions. The timeline was pushed to Q4 2018. That did not happen because of the "lame duck" council, where fewer than 75% of the former council returned after the election.

https://www.cbc.ca/news/canada/ottawa/lrt2-contract-delayed-lame-duck-1.4878101
https://www.cbc.ca/news/canada/ottawa/funding-for-lrt2-not-confirmed-1.5008971
     
     
  #11932  
Old Posted Feb 18, 2019, 9:12 PM
SpongeG's Avatar
SpongeG SpongeG is online now
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 39,945
Quote:
Originally Posted by giallo View Post
A well shot and detailed video of the Skytrain going from Surrey to Vancouver's newly renovated Commercial/Broadway station.

Video Link
from Joyce to Nanaimo there is so much underdeveloped land and some surprisingly large fields of grass, for a city that seems to brag how good they are and in the midst of a housing crisis it is odd to see so much wasted opportunity
__________________
belowitall
     
     
  #11933  
Old Posted Feb 18, 2019, 10:04 PM
mintzilla mintzilla is offline
Registered User
 
Join Date: Aug 2009
Location: on a boat
Posts: 742
Questions for the calgary posters. What are your transit plans for using ship cards for fare? I think it is extremely important that the Edmonton system and Calgary system are interchangeable. Maybe one day we can get that high speed rail (pipe dream I know) and would make it easy to take transit in both cities.
__________________
Beuno
     
     
  #11934  
Old Posted Feb 18, 2019, 10:07 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,664
Quote:
Originally Posted by mintzilla View Post
Questions for the calgary posters. What are your transit plans for using ship cards for fare? I think it is extremely important that the Edmonton system and Calgary system are interchangeable. Maybe one day we can get that high speed rail (pipe dream I know) and would make it easy to take transit in both cities.
Is there political will for Alberta as an entire province to implement something equivalent to Ontario’s presto card (although negotiation with the region of Waterloo absolutely failed)?
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
     
     
  #11935  
Old Posted Feb 19, 2019, 12:13 AM
MalcolmTucker MalcolmTucker is online now
Registered User
 
Join Date: May 2007
Posts: 11,578
Nah. Edmonton region is spending $50 million trying to implement a smart fare system. https://www.edmonton.ca/projects_plans/transit/smart-fare.aspx

No thoughts to province wide implementation.

After two failed procurements of smart card products, Calgary has abandoned attempts to implement a smart fare product, except for exploring an app based system. With no fare gates, and other systems in the region being super tiny, there isn’t really a reason to try to do smart cards. They just don’t offer features that are better than paper. Current fare vending machines take credit cards, debit, etc. The app will fill the gap for fares for buses.

If Calgary has the choice to implement a smart card or buy 15 more light rail vehicles, it would choose the light rail vehicles.
     
     
  #11936  
Old Posted Feb 19, 2019, 6:17 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,664
https://www.youtube.com/watch?v=ZfUKvPdRQIo

$297,616 of taxpayers' money for advertisement...
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
     
     
  #11937  
Old Posted Feb 19, 2019, 7:55 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,890
It's not that much for an advertsing campaign. They are provider a customer based service. Makes sense to have a good sized advertising budget. It's just a bit of a stretch to call it taxpayer money.
     
     
  #11938  
Old Posted Feb 19, 2019, 8:26 PM
rbt rbt is offline
Registered User
 
Join Date: Jun 2006
Posts: 1,387
Quote:
Originally Posted by WhipperSnapper View Post
It's not that much for an advertsing campaign. They are provider a customer based service. Makes sense to have a good sized advertising budget. It's just a bit of a stretch to call it taxpayer money.
Indeed. At ~$7/trip for a typical GO bus it would take about 12 people to decide to take the bus for their daily commute for this campaign to break even.

If 13 do, will they call it taxpayer profit?
     
     
  #11939  
Old Posted Feb 19, 2019, 8:33 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Moreso, if they have existing capacity for those 12 extra customers.

If they have to build additional capacity to handle those additional riders the advertising campaign might be a wash.
     
     
  #11940  
Old Posted Feb 19, 2019, 8:53 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,452
Confederation Line images from last week's update.

Rideau Station West Concourse


https://twitter.com/OttawaPolitico/status/1096030485296398336

Rideau Station Platform


https://twitter.com/ReNewCanada/status/1095410196237746178

Lyon Station Concourse


https://twitter.com/OttawaCritic/status/1095938812902076419
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 9:22 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.