Quote:
Originally Posted by JohnnyRenton
You mean the line that started off as a pilot project and has basically remained in that state since it was opened, save a few upgrades along the way?
The city knows what to do. It has long had a bigger vision for it. But luck hasn't been on its side. You have had groups of people that don't want to shut it down in order to modernize it, even that is exactly what needs to happen if anything other than miniscule upgrades are to be made. You have the satellite suburbs, and their voting influence, to push the city to send LRT there way first. And you have a limited amount of funds which left it squeezed out of the first phase of LRT construction.
The Trillium Line will eventually get what it deserves. I am very curious to see what exactly they plan on doing when they make their announcement on Feb 27. Its expansion will obviously be phased, and hopefully they get all the shutdowns done and over with in the first wave of expansion. I see the Trillium Line as being something the city will have to "sneakily" get done. And by that I mean they upgrade it a few hundred million at a time, under the radar of the larger suburban projects, until they can sell its completion (complete with a link to the airport and interlining (you can debate whether this will happen or if its a good idea, this is just what I think)) as a smallish but critical LRT package. I could be wrong, but this is the feeling I have gotten since the city went forward with its current LRT plans and construction.
|
They have no plans to double track. The experts have assured them that the current plan is good until 2048.
Of course, we are shutting down for 16 months in 2020, and we will be lucky if it is only 16 months. But this does not give us double tracking. It doesn't likely buy us better frequency either. It just allows for double length trains.
When we finally have no choice, the line will be down for 3 years, which was what they expected in 2006. We have been doing the easy stuff so far. It is when we fully double track that we will be facing tunneling, blasting, and several bridge replacements. And if we increase ridership to 30,000 or 40,000, how do we get those people to their destination efficiently? There are no parallel roads that won't increase travel times except by 50% or 100%.
In the meantime, we better watch out when building several new towers around Carling and Gladstone stations. Every tower that goes up will shorten the useful life of Phase 2.
The future proofing that we are building into the Confederation Line is not being done for the Trillium Line because of the priorities chosen by the city.