Quote:
Originally Posted by lrt's friend
There was also the desire by John Baird to stab Bob Chiarelli in the back politically, which was disgusting.
The original plan was a whole lot different with most of the rail lines restricted to inside the Greenbelt and busways to the outer suburbs. The exception being the southern suburbs which was designated rail because a rail line already existed across the Greenbelt.
Of course the flaw was the lack of a downtown tunnel. Whether the tunnel should have been for rail or for buses, it would have solved the problem for decades. Buses on the surface, rail underground or visa versa.
We became obsessed with removing the vast majority of buses from downtown and with operational efficiencies, which I am thinking are more of a phantom than we wish to admit. The city's investment has to be repaid.
Don't forget also the Carling LRT plan that survived the new TMP but I doubt will ever be built.
So when we changed the TMP, it switched from mainly an urban rail network to a mainly commuter rail network.
Funny how so many are now wishing for an urban plan while also saying the original concept was garbage.
|
Ahhh yes. I forgot about that whole Baird nonsense. It was pretty shameful.
One of the tough parts about the existing plan, and perhaps it was designed just for this reason, is that once they started building Phase 1 of the Confederation Line, it pretty much meant they have to continue and replace all the existing Transitway with LRT. It is necessary if the network, as a whole, is to function to its maximum efficiency.
And yes, the new plan does risk the potential for it to set a precedent of LRT being more of a commuter rail system, than an urban LRT system.
That said, I don't think it is all doom and gloom either. Having a large number of buses removed from downtown is going to make a difference, and make it more appealing to live in, work in, and to simply visit. And once the satellite suburbs are on track to get their LRT service, then it makes it a lot easier for the city to focus their attention back on improving the inner urban network. I also think it will be at least 3-5 years before discussions about what to do after the suburbs are sorted will really start to happen, which is fine. It just means more time for urban development and growth to take hold. And every building that goes up, and parking lot that disappears is just one more tick in favour of shifting transit planning back to the urban core and inside the greenbelt.