  #3501  
Old Posted Feb 12, 2019, 4:48 AM
flipper316 flipper316 is offline
 
Join Date: Dec 2016
Posts: 887
Metrotown station kind of looks half assed. The open station entrances. The new glass that already looks old with stains scratches. Can anyone also explain why the mixture of old and new tiles on the ground. Joyce doesn't have that, it's all new tiles. How come there's no consistency?
Reply With Quote
     
     
  #3502  
Old Posted Feb 12, 2019, 5:20 AM
Waders Waders is offline
 
Join Date: May 2009
Posts: 1,361
Quote:
Originally Posted by flipper316 View Post
Metrotown station kind of looks half assed. The open station entrances. The new glass that already looks old with stains scratches. Can anyone also explain why the mixture of old and new tiles on the ground. Joyce doesn't have that, it's all new tiles. How come there's no consistency?
Also it was 'snowing'(literally) inside the east station house for the last 2 days! Snow covered the fare gate, the escalator and the floor was wet and slippery. Whoever designed the 'open top' station house must have forgot Vancouver rains a lot and does snow in winter

Platform tile replacement is quite 'disruptive'. Joyce station went through a few months partial platform closure in order to have all the floor tiles replaced.

Last edited by Waders; Feb 12, 2019 at 5:31 AM.
Reply With Quote
     
     
  #3503  
Old Posted Feb 12, 2019, 5:38 AM
MIPS's Avatar
MIPS MIPS is offline
 
Join Date: Mar 2013
Posts: 2,130
Quote:
Originally Posted by flipper316 View Post
Metrotown station kind of looks half assed. The open station entrances. The new glass that already looks old with stains scratches. Can anyone also explain why the mixture of old and new tiles on the ground. Joyce doesn't have that, it's all new tiles. How come there's no consistency?
Why be consistent when you can potentially save money each time an expansion is needed by going with a new designer/architect and fulfilling the on-paper capacity upgrades?

TransLink has a thing for Extreme Cost Cutting: Vancouver Edition which goes beyond the usual lack of funding they get (this partially everyone's fault for saying NO) and as a result we are not eligible to get streamlined or uniform station designs because doing so incurs extra cost. This again makes me bring up just how much I love the original Expo Line stations as the cost of making so many brand new stations was partially mitigated by using so many interchangeable parts that got cheaper to build by the dozen.
Reply With Quote
     
     
  #3504  
Old Posted Feb 12, 2019, 5:41 AM
SpongeG's Avatar
SpongeG SpongeG is offline
 
Join Date: Jun 2006
Posts: 40,140
Most systems can look like a mish mash of styles, just look at London's tube. Cost savings and function are better than the final look.
Reply With Quote
     
     
  #3505  
Old Posted Feb 12, 2019, 5:50 AM
Metro-One's Avatar
Metro-One Metro-One is offline
 
Join Date: Sep 2008
Posts: 18,041
Quote:
Originally Posted by SpongeG View Post
Most systems can look like a mish mash of styles, just look at London's tube. Cost savings and function are better than the final look.
Yeah, it is nothing out of the ordinary. All the rail lines around my area are extreme mosh mashes of styles, age, station scale, etc...
Reply With Quote
     
     
  #3506  
Old Posted Feb 12, 2019, 6:46 AM
SpongeG's Avatar
SpongeG SpongeG is offline
 
Join Date: Jun 2006
Posts: 40,140
well at least they have the extra platform now, sounds like commuter chaos with the snow.


twitter: @Kevin_Eastwood
Reply With Quote
     
     
  #3507  
Old Posted Feb 12, 2019, 6:55 AM
officedweller officedweller is online now
 
Join Date: Jul 2001
Posts: 41,847
Function over form and superficiality.
Reply With Quote
     
     
  #3508  
Old Posted Feb 12, 2019, 7:25 AM
Waders Waders is offline
 
Join Date: May 2009
Posts: 1,361
A picture from CBC news. I am glad the new platform at Commercial Broadway station has opened in time for the snow weather.


Source: CBC
Reply With Quote
     
     
  #3509  
Old Posted Feb 12, 2019, 8:30 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by flipper316 View Post
Metrotown station kind of looks half assed. The open station entrances. The new glass that already looks old with stains scratches. Can anyone also explain why the mixture of old and new tiles on the ground. Joyce doesn't have that, it's all new tiles. How come there's no consistency?
Quote:
Originally Posted by MIPS View Post
Why be consistent when you can potentially save money each time an expansion is needed by going with a new designer/architect and fulfilling the on-paper capacity upgrades?

TransLink has a thing for Extreme Cost Cutting: Vancouver Edition which goes beyond the usual lack of funding they get (this partially everyone's fault for saying NO) and as a result we are not eligible to get streamlined or uniform station designs because doing so incurs extra cost. This again makes me bring up just how much I love the original Expo Line stations as the cost of making so many brand new stations was partially mitigated by using so many interchangeable parts that got cheaper to build by the dozen.
Quote:
Originally Posted by officedweller View Post
Function over form and superficiality.
you would think, though, that for the ultimate function and saving money would be just manufacturing prefab trusses/panels/etc using the same style as the original expo line. you could change out the perforated panels for glass, and just bolt on the new trusses.

it would keep the system uniform, and the original construction technique was designed to be cheap.
Reply With Quote
     
     
  #3510  
Old Posted Feb 12, 2019, 9:19 AM
officedweller officedweller is online now
 
Join Date: Jul 2001
Posts: 41,847
That would be nice, wouldn't it?
Reply With Quote
     
     
  #3511  
Old Posted Feb 12, 2019, 10:16 PM
MIPS's Avatar
MIPS MIPS is offline
 
Join Date: Mar 2013
Posts: 2,130
That too has been brought up, here even.
The modular and pre-fabricated pieces make it cheap but everyone insisted on something different because they didn't want to be stuck in the 80's, even though everything offered has been either incompatible or in the case of the Millennium Line, way too expensive than it was functional.

Last edited by MIPS; Feb 12, 2019 at 10:40 PM.
Reply With Quote
     
     
  #3512  
Old Posted Feb 13, 2019, 11:23 PM
Jebby's Avatar
Jebby Jebby is offline
 
Join Date: Dec 2010
Posts: 3,330
Quote:
Originally Posted by MIPS View Post
That too has been brought up, here even.
The modular and pre-fabricated pieces make it cheap but....
Extremely ugly and dated.
Reply With Quote
     
     
  #3513  
Old Posted Feb 14, 2019, 10:21 PM
MIPS's Avatar
MIPS MIPS is offline
 
Join Date: Mar 2013
Posts: 2,130
I dunno. Berlin has done a great job keeping it looking appealing while occasionally upgrading the overall style.


UrbanRail.net


Markus Kaiser


Alamy Photos


Alamy Photos
Reply With Quote
     
     
  #3514  
Old Posted Feb 14, 2019, 10:46 PM
Galaxy's Avatar
Galaxy Galaxy is offline
 
Join Date: Mar 2017
Posts: 475
They also design their stations to prevent problems like pigeons. Overall I love Berlins stations. Mass production stations could totally save us money for transit and even social housing...
Reply With Quote
     
     
  #3515  
Old Posted Feb 14, 2019, 11:15 PM
officedweller officedweller is online now
 
Join Date: Jul 2001
Posts: 41,847
That first pic is totally similar to the Expo Line stations.
Reply With Quote
     
     
  #3516  
Old Posted Feb 14, 2019, 11:23 PM
Colin4567 Colin4567 is offline
 
Join Date: Oct 2017
Posts: 234
Quote:
Originally Posted by officedweller View Post
That first pic is totally similar to the Expo Line stations.
I read somewhere the SkyTrain stations on the Expo Line were designed to look like German train stations. They broke that with the Millennium Line when they asked like 6 different companies to each design 2 architecturally unique stations.

Source: Some document from years ago.
Reply With Quote
     
     
  #3517  
Old Posted Feb 15, 2019, 1:14 AM
MIPS's Avatar
MIPS MIPS is offline
 
Join Date: Mar 2013
Posts: 2,130
Quote:
Originally Posted by Colin4567 View Post
I read somewhere the SkyTrain stations on the Expo Line were designed to look like German train stations. They broke that with the Millennium Line when they asked like 6 different companies to each design 2 architecturally unique stations.

Source: Some document from years ago.
Expo Line stations were designed by German firm Architekten-Gruppe. The above and other portions of the U-bahn look so similar to our own stations because they both use the same design language. AG likely won the contract to design the Expo Line simply because they didn't need to draft all the framing and fixtures which brought down the cost. They just recycled what they already drafted.
Reply With Quote
     
     
  #3518  
Old Posted Feb 15, 2019, 2:16 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by MIPS View Post
AG likely won the contract to design the Expo Line simply because they didn't need to draft all the framing and fixtures which brought down the cost. They just recycled what they already drafted.
which is good since it gives us a cheap system to build. would have been better to just stick with that. cheap, no bird problems, and would prevent 3 decades of designs stuffed together without any of them complimenting each-other.
Reply With Quote
     
     
  #3519  
Old Posted Feb 15, 2019, 6:07 AM
jollyburger jollyburger is offline
 
Join Date: Dec 2015
Posts: 15,855
Quote:
Originally Posted by MIPS View Post
Expo Line stations were designed by German firm Architekten-Gruppe. The above and other portions of the U-bahn look so similar to our own stations because they both use the same design language. AG likely won the contract to design the Expo Line simply because they didn't need to draft all the framing and fixtures which brought down the cost. They just recycled what they already drafted.
They were from Austria (Buzzer corrected themselves when they mentioned the drawings)

Bonn



Bilbao



Even their works from the 2000s looks similar. Wien




http://www.agu.at/
Reply With Quote
     
     
  #3520  
Old Posted Feb 15, 2019, 6:09 AM
MIPS's Avatar
MIPS MIPS is offline
 
Join Date: Mar 2013
Posts: 2,130
I stand corrected. Thank you for pointing that out.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
   
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:56 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.