Quote:
Originally Posted by mykl
Last night I had an interesting encounter with someone close to the project at a high level. They weren't willing to give full details obviously, but here's what I took from the conversation:
Get ready for another delay.
Apparently there are big issues and related to who will pay for various problems. They said — is going to hit the fan in a meeting on Monday, and tonight on CBC news they were talking about a major update coming on Tuesday.
Apparently there have been problems such as a fire at a substation. And everything, especially the catenary system is —, and the maintenance group will spend the next 30 years patching and fixing basically everything. The contract was written in a way that has allowed the system to be built at the bare minimum requested, which will screw the system as time goes on.
Also, regarding trains 33 and 34, whatever their issue is, it wasn't just a lost computer. Trains 35 and 36 were fast-tracked because 33 and 34 wont be ready.
Basically its just a disaster of issues and no one wants to take responsibility.
|
Called it.
Quote:
Originally Posted by J.OT13
Wonder if the delay is related to discussion surrounding who will be on the hook for the sinkhole(s), the replacement of the Ash wood and, well, the delays. That along with anything else we might not know about.
I could understand the first few delays. Anything more than a year is too much. We're passing by an essentially completed transit line everyday and we can't use it. This is getting frustrating.
|
Fixed price contract is only fixed if there are no issues. As soon as there are cost overruns, the contract is torn up. It's like an insurance scam; you pay a premium for piece of mind and as soon as you make a claim, you're no longer covered for reasons xyz.
Based on what I know about the contract, and granted I don't know much, RTG should be paying for the February 2014 sinkhole, the material replacing the Ash they destroyed (including re-doing Rideau and Lyon in WOOD as originally agreed upon, not that cheap paneling) and their million dollar chump change penalties for not meeting the second (and maybe third?) deadline(s).
The City of Ottawa should pay for the additional year+ of bus detours.
The Rideau Street sinkhole is still up for debate.