Posted Feb 5, 2019, 6:01 PM
|
 |
Moderator
|
|
Join Date: Mar 2012
Location: Ottawa
Posts: 27,635
|
|
Always did find Vancouver's system identification scheme quite strange. The entire time Evergreen was under construction, I thought it was going to be its own independent line. If they treat the Broadway subway (two phases) the same way as Evergreen, that will make it even worse.
|