If the City will be on the hook for extra costs, Ryan McGreal had a good idea a while back that would eliminate the need for a new bridge over the 403. Have the train turn before the 403 and go adjacent to the CP right of way (behind Fortinos) and over to Innovation Park. The train can then go over the 403 at Longwood (which is going to happen anyway).

Also, they are delaying the project start-up to 2020 while maintaining the staff, which will add to the cost. The City shouldn't be on the hook for those costs.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Hamilton > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:47 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.