It's already a fantastic project, but with all the nonsense happening south of Zibi, I'm all the more grateful that Windmill is able to competently pull this off.
__________________
I've always struggled with reality. And I'm pleased to say that I won.
Reply With Quote
     
     
  #102  
Old Posted Nov 28, 2018, 1:39 PM
agl agl is offline
Registered User
 
Join Date: Oct 2010
Posts: 93
Agree that Zibi is a fantastic project. The only regret I have is that Gatineau is not far enough ahead with LRT to plan a route through the Zibi lands south of Taché/Laurier, even to protect a corridor for the future.
Reply With Quote
     
     
  #103  
Old Posted Nov 28, 2018, 2:39 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
Although Gatineau will hopefully have a better idea by time the phases touch Laurier (Phases 3-6). The Étude Complémentaire should be finished by the end of 2019, and that document would lay out a definitive corridor. Then the STO will be able to start developing detailed schematics in 2020. Behind the scenes, Zibi has apparently been enthusiastic about collaborating with the City on LRT so I wouldn't be suprised if they worked together on the planning for the Laurier St corridor to rough in space for LRT.
__________________
I've always struggled with reality. And I'm pleased to say that I won.
Reply With Quote
     
     
  #104  
Old Posted Nov 28, 2018, 3:45 PM
agl agl is offline
Registered User
 
Join Date: Oct 2010
Posts: 93
That is good news. With the demolition underway at the corner of Eddy and Laurier I feared a final site plan has already been committed to by Zibi. If there`s room for flexibility to work with the city and integrate an LRT corridor in the plan that would be fantastic.

Of course, then we`ll just have to see if the newly installed QC gov`t will support the plan as the previous gov`t had.
Reply With Quote
     
     
  #105  
Old Posted Nov 28, 2018, 8:32 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,398
Still some unsold units left at "O" facing North. No one wants their balconies overlooking the construction zone I guess.
Meanwhile, South-facing side was sold out in the first couple of days. And the view is pretty good.



Full size: https://i.imgur.com/twolH4t.jpg
Reply With Quote
     
     
  #106  
Old Posted Dec 4, 2018, 7:05 PM
MattRichling's Avatar
MattRichling MattRichling is offline
Kickass User
 
Join Date: Mar 2011
Location: Ottawa
Posts: 176
Below is a photo from the Traverse floorplan, which has not had its final cleaning, but pretty cool views...

This is the view from a south facing one bedroom...


A corner unit facing south and west...
__________________
Matt Richling
Salesperson / Team Lead
New Purveyors Brokered by RE/MAX Hallmark Realty Group,

www.MattRichling.com
www.NewPurveyors.com
Reply With Quote
     
     
  #107  
Old Posted Jan 26, 2019, 3:38 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,688
Come for the views: Zibi 'pioneers' start move-in to future One Planet Community

Anita Murray, Ottawa Citizen
Updated: January 25, 2019




Three years after beginning the long process of reclaiming the old Domtar lands in the Ottawa River, the site that is becoming Zibi still has the feel of an industrial wasteland.

But as residents move in to the first condo building, a new sales/tourist centre gets ready to open, demolition nears the end and the painstaking restoration of many of the property’s dozens of buildings progresses, there’s a sense that — finally — significant signs of the rebirth of the area are beginning to emerge.

Zibi is the 37-acre redevelopment of abandoned downtown waterfront straddling the Quebec and Ontario border, encompassing Chaudière and Albert islands as well as a portion of the Gatineau shoreline. The property is being developed by Dream Unlimited and Theia Partners, a spinoff of Windmill Development Group, who have an ambitious plan to bring upwards of 1,500 condos and rental apartments, more than 1.5 million square feet of commercial, retail, cultural and institutional space and almost eight acres of greenspace to the site.

Zibi president Jeff Westeinde sees the project as a much-needed fourth corner of the national capital’s tourist sector.

“If you look right now, you’ve got the War Museum, all the way down past Parliament, the National Gallery, across the bridge to the (Canadian) Museum of History (then) it stops and there’s really nothing on this side of the river to bring tourists along Laurier (Street),” he says on a recent tour of the development. “Zibi is for sure going to change the face of Gatineau.”

Designated a One Planet Community, which is a growing global network of über-green neighbourhoods that are the cutting edge of sustainable development, even beyond the industry-leading LEED program (Leadership in Energy and Environmental Design), Zibi will emphasize people through the Dutch concept of woonerfs, which promotes streets that give pedestrians priority over cars, as well as public plazas and squares.

So far, besides demolition and remediation, the focus on the Gatineau side has been on a section along Laurier Street, between Eddy Street and an extended Laval Street. This phase encompasses the first condo to be finished, a 70-unit six-storey building called O and built along the shoreline. Next to it, the hardscaping for a waterfront plaza is complete, with furniture, lighting and public art to be added in the spring.



Along Laurier, an old eyesore of a warehouse that had blocked the view to the river is now gone, as is a neighbouring servicing garage, completely opening up this corner of the property.

Just west of O, restoration continues on a pair of old buildings fronting Eddy (they’re actually a collection of several buildings that were all fused together over the years). The buildings will house commercial space that is expected to be ready later this year and feature a glass atrium between them that extends to a linear park with a view of Parliament Hill.

“From everywhere in that park you’re going to see Parliament Hill framed by our development and that’s one of the main pedestrian entrances onto the site,” says Westeinde.

Next door, Zibi’s new sales centre, which boasts a tree growing in the middle of it, is scheduled to open this winter. “We’re curating a five-senses experience,” explains Zibi events co-ordinator Scott Simpson. “Yes, it’ll be a sales centre but, if anything, it’s more like a tourist destination.” It’s designed, he says, so that one would be able to experience the five senses using the history of the site.



Meanwhile, construction continues on the first condo released on the Ottawa side, a 71-unit six-storey building that’s a mix of stacked townhomes and condo flats along the Buchanan Channel between Chaudière and Albert islands. It’s expected to be ready by the end of this year. And now open — if covered in snow — is the park overlooking the Chaudière Falls, the jewel of Ottawa that had been closed off to the city for so long.

Up next is a 14-storey rental building in Gatineau on the east side of Eddy that will boast prime views of the falls. And the sister building to O is expected to launch later this year.

Despite the progress, it’ll be some time before the site looks like the One Planet Community it’s designed to be and it’s perhaps appropriate that initial residents have been labelled by Westeinde as pioneers, even if the label conjures up comparisons to settler predecessors, who tamed the falls that have been deemed so important to the area’s Indigenous Peoples. (There is still a contingent — and probably always will be — of those who believe there should be no development of the area; that it should be returned to its natural state.)

“We really are pioneers,” says Danny Jeannot, who moved in with his partner, Jinny Jobin, at the end of November. He’s referring partly to the fact that it will be some time before much of the site is built — that doesn’t bother them at all — and partly to the sparse furnishings in their apartment, which is due to a complicated housing arrangement that is seeing their possessions temporarily scattered across three properties.

Both triathletes who work in the downtown core — he at Place du Portage in Gatineau, she at the Canadian Nurses Association across from the University of Ottawa — they were seeking a lifestyle change from their Aylmer bungalow. They loved the idea of being both close to work and of having a weekend cottage getaway where they could train in a lake. That meant finding a cottage and a sort of pied-à-terre in the middle of it all. Zibi fit the bill.

“It was my dream to come closer to downtown,” says Jobin.

Getting to work is now just a 10-minute walk for Jeannot and a short bike ride for Jobin. Plus, they’re close to the places they like to frequent downtown.

“When we saw everything that they’re planning to have here, I thought, ‘Oh my god, it’s going to be nice, beautiful,’ and also with the project at LeBreton Flats that’s going to come, this area will become the new downtown, pretty much, even more than the (ByWard) Market,” says Jeannot. “On top of that, with all the One Planet Community (aspect) I was in love with the idea of the project.”

They’re keeping their bungalow as an investment, renting it initially to a family that lost everything in last fall’s tornados. As a result, Jeannot and Jobin are leaving the family much of their furniture until a new home is built for them later in the year.

“All of these things are coming together at the same time,” Jeannot says of the chaotic couple of months ahead of them. Adds Jobin, “It’s exciting and stressful at the same time.”

And as far as being at Zibi before many of the development’s features are in place, Jeannot keeps a positive attitude. “Even if they do only 25 per cent of what they’re planning to do, it’s going to be great.”

With Citizen files




Zibi

What: A very green, 37-acre mixed-use community of condos, townhomes and rentals, as well as commercial, retail, cultural and institutional tenants, on the former Domtar industrial site along the Ottawa River.
Builders: Dream Unlimited and Theia Partners
Prices: From $339,900 in Gatineau and $639,900 in Ottawa
Sales centre: 6 Booth St.
Hours: Weekends noon to 5 p.m.; otherwise by appointment
Information:zibi.ca; 613-224-0134

https://ottawacitizen.com/life/homes/con...t-move-in-to-future-one-planet-community
Reply With Quote
     
     
  #108  
Old Posted Jan 26, 2019, 5:20 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
CBC article from November 2018. Similar to the Citizen article posted by rocketphish.

Zibi's 'pioneers' take up residence

Laura Osman
CBC Ottawa
November 29, 2018


1st residents of controversial development will have to wait for promised amenities.

The first residents of a major development straddling the Ottawa River might have to wait a while before meeting their new neighbours.

Condo owners have started moving into their new homes in the first finished building of the new Zibi development, to be built on former Domtar lands on Chaudiè​re and Albert islands, as well as a swath of riverfront property in Gatineau.

For years now, Zibi has been advertized as a thriving, self-sufficient community where residents will "live, work and play," as developers love to say. The $1.5-billion project will eventually be home to 5,000 residents, according to Dream and Theia Partners, a spinoff of Windmill, the development company that launched the project.

But it will be some time before that dream is fully realized, and the neighbourhood residents are moving into now bears little resemblance to the bustling community in the glossy brochures.

An 'intriguing' opportunity

Marc-Antoine Massicotte is among the first to take up residence. In 2015, with a little help from his father, Massicotte purchased a one-bedroom condo on the fourth floor of the newly opened O Condos building on the Gatineau side of the river.

"I thought it was so intriguing at first that we would finally have access to those lands," he said. "I thought, why not be a pioneer and get into it?"

Massicotte isn't deterred by the 15 years it will take before the community's complete. He understands that for now there won't be much in the way of shops and other amenities outside his front door, but said he's looking forward to watching the neighbourhood grow.

"It's going to be fun to see it happen," he said.



A controversial development
The community is being developed in phases on previously contaminated industrial land.

The developer said it's designed with the environment in mind, including a net-zero carbon district energy system and a recycling and composting program tailored to residents.

Zibi also promises to open up Chaudière Falls to public view for the first time in over a century.

'You don't build condos in the Vatican': Tensions linger as 1st tenants move in to Ottawa-Gatineau development
But the project has also generated controversy. There have been protests, land claims, lawsuits and appeals to the Ontario Municipal Board over the land, considered sacred to the Algonquin people precisely because of its proximity to the once-spectacular falls, a traditional gathering place for Indigenous people.

For all those reasons, it could be a challenge to attract a critical mass of eager early adopters like Massicotte, according to Steve Pomeroy, a senior research fellow with the Centre for Urban Research at Carleton University.



Some condos remain vacant
At this early stage, it's difficult to predict the project's success based on uptake: after three years of presales, 14 of the 70 condos in Massicotte's building remain vacant. In total, the developer has sold 83 per cent of the roughly 143 units it's put on the market.

So far, no commercial tenants have been announced.

Pomeroy said while Ottawa's condo market is currently in good health, developments like Zibi face a special challenge because they're ultimately striving to build self-contained communities from the ground up.

While most new condos are surrounded by existing amenities, Zibi's pioneers will have to go without for years or even decades.



"You tend to like to try on what you're going to buy," Pomeroy said. "It is a harder sell when you're in an emerging transitional area."

The next building in the Zibi development is expected to open next year, this time on the Ottawa side of the river.

https://www.cbc.ca/news/canada/ottawa/zibi-condo-move-in-1.4923814
Reply With Quote
     
     
  #109  
Old Posted Jan 26, 2019, 10:18 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,398
Quote:
Originally Posted by rocketphish View Post
Up next is a 14-storey rental building in Gatineau on the east side of Eddy that will boast prime views of the falls. And the sister building to O is expected to launch later this year.
Wonder which one is that, the one that was originally 10-floor or 18-floor?
Reply With Quote
     
     
  #110  
Old Posted Jan 27, 2019, 3:07 AM
Multi-modal Multi-modal is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,154
Talking

Quote:
Originally Posted by zzptichka View Post
Wonder which one is that, the one that was originally 10-floor or 18-floor?
I would assume its the former 10 floor if it's got good views of the falls. I bet they are finishing the row of buildings at the furthest south edge of the gatineau side. Those will have the best views and will be the easiest to sell at the early stages of Zibi.
Reply With Quote
     
     
  #111  
Old Posted Jan 27, 2019, 4:53 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Why waste such a prime location for rentals?
Reply With Quote
     
     
  #112  
Old Posted Jan 28, 2019, 2:51 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Le Trou-du-Diable? I've heard that term before, but I didn't realize there was a feature in Hull that held the name.


http://geo-outaouais.blogspot.com/2015/01/la-grande-caverne-aux-chaudieres.html

That could be a tourist destination in itself. The Chaudière Falls could also become a major destination, as it was nearly two centuries ago before it was closed off to the public. I'm sure Zibi will include a few cultural venues. It will feature at least one hotel. The development will improve access to Victoria Island and the Aboriginal Experience. The district as a whole, with its many restaurants, retail, restored industrial buildings (all similar to Dream's Distillery District in Toronto) and the waterfronts will no doubt attract a significant amount of tourism as well.
Reply With Quote
     
     
  #113  
Old Posted Jan 28, 2019, 4:16 PM
Acajack's Avatar
Acajack Acajack is offline
Gros Méchant Loup
 
Join Date: Aug 2006
Location: SSP Graveyard
Posts: 72,949
Quote:
Originally Posted by J.OT13 View Post
Le Trou-du-Diable? I've heard that term before, but I didn't realize there was a feature in Hull that held the name.
.
There used to be a tavern in the Vieux-Hull called Le Trou du Diable. Named for one of the waterfalls or whirlpools of the Chaudière.
__________________
Gone... but never forgotten.
Reply With Quote
     
     
  #114  
Old Posted Jan 28, 2019, 4:32 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by Acajack View Post
There used to be a tavern in the Vieux-Hull called Le Trou du Diable. Named for one of the waterfalls or whirlpools of the Chaudière.
That might be where I remember it from.
Reply With Quote
     
     
  #115  
Old Posted Jan 28, 2019, 4:44 PM
Acajack's Avatar
Acajack Acajack is offline
Gros Méchant Loup
 
Join Date: Aug 2006
Location: SSP Graveyard
Posts: 72,949
Quote:
Originally Posted by J.OT13 View Post
That might be where I remember it from.
There is also a microbrewery called Le Trou du Diable but it's based in Shawinigan - they brew the Shawinigan Handshake, among others.

That city has a similar geography and history with waterfalls, so the name works for them too.
__________________
Gone... but never forgotten.
Reply With Quote
     
     
  #116  
Old Posted Mar 26, 2019, 12:12 PM
Jayday23 Jayday23 is offline
Registered User
 
Join Date: Sep 2017
Posts: 357
anyone know where this plaza is supposed to be? Really intrigued by the design of the building to the right...

Link: https://www.buzzbuzzhome.com/ca/zibi--o#image-All-1
Reply With Quote
     
     
  #117  
Old Posted Mar 26, 2019, 7:37 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Behind the restored buildings in Hull, south-east corner of Eddy an Laurier. That new tower would right on the street corner.

https://www.google.com/maps/place/Ottawa...131dd15ed!8m2!3d45.4215296!4d-75.6971931
Reply With Quote
     
     
  #118  
Old Posted Mar 26, 2019, 8:38 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,698
You can see that building in this map:

Reply With Quote
     
     
  #119  
Old Posted Apr 14, 2019, 7:17 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by Glenlivet Ave View Post
Have they hinted as to which residential building will be next for sales and construction? Will there be any rental apartments in the pipelines? At this rate, this development will take an eternity to complete.
Next will be "O2" in Hull next to the "O" and a rental tower corner of Eddy and Laurier, also in Hull. Not sure what's next in Ottawa.

Hoping for a new Federal office building in Hull for some proper swing space while Terrasses and Portage are renovated.
Reply With Quote
     
     
  #120  
Old Posted May 22, 2019, 1:50 AM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,398
One of the industrial buildings along Eddy being rebuilt as commercial.
You can see "O" and container tower in the reflection.


Last edited by zzptichka; May 22, 2019 at 1:22 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Gatineau
Forum Jump



Forum Jump


All times are GMT. The time now is 11:41 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.