Quote:
Originally Posted by J.OT13
Buses won't be much of a back-up plan when all the Transitways are ripped out and downtown bus lanes are removed.
I agree with lrt's freind that our reliance on one line through downtown will be a major issue should it be shutdown for whatever reason. If Gatineau could somehow find a way to fund and built a tunnel to connect the planned Bayview and Rideau termini, that would be a huge help.
In most other cities, there is an alternative. Montreal had two lines through downtown day 1.
Toronto built the "U" within a few years.
Calgary surface route can be used by buses, should the need arise.
Vancouver took a few decades before a second line though downtown was built (and this new line has capacity limitations).
Edmonton has had one rail route through downtown for the last 40 years however, it caries half the passengers as Confederation. They are now building a second line through downtown.
Does anyone have stats on how often rail lines breakdown in other cities?
|
Here's an article about Montreal's reliability.
https://www.google.ca/amp/s/www.cbc.ca/amp/1.1367912
However when talking shutdowns, it's unlikely that the entire line would be shutdown for any extended time. Parts of it are more likely, which would require a bus bridge like most other cities do. The Trillium line is a bad comparison point, because it's single track nature causes the whole thing to go down whenever there's a problem somewhere on the line.
Toronto's U is still a single line, so it's not a big improvement than what we have. It provides a bit of redundancy but not in comparison to Montreal.
Vancouver is in a worse boat then us, 70% of the traffic comes from a single direction, and the Canada line is too far to the West to make any difference if the expo line shuts down