HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #9581  
Old Posted Dec 24, 2018, 7:01 AM
zahav zahav is offline
Registered User
 
Join Date: Apr 2009
Location: Vancouver
Posts: 2,052
Quote:
Originally Posted by Tetsuo View Post
Outside downtown and high traffic commuter areas, plenty of coffee shops are local social hubs, be it an independent shop or a large chain.

The waves coffee near me seems to be a social hub for new immigrants to the country wanting to get together and socialize in their mother tongue (Amharic/Tigrinya)
Are you in Burnaby? (Edmonds or Metro?)
     
     
  #9582  
Old Posted Jan 22, 2019, 4:42 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
     
     
  #9583  
Old Posted Jan 22, 2019, 8:18 AM
fredinno's Avatar
fredinno fredinno is offline
Registered User
 
Join Date: Jan 2012
Posts: 2,317
I mean, if UBC offers up 1/3rd of the cash, it might actually be a possibility.
     
     
  #9584  
Old Posted Jan 22, 2019, 4:17 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,559
Quote:
Originally Posted by fredinno View Post
I mean, if UBC offers up 1/3rd of the cash, it might actually be a possibility.
That's over a Billion with the latest estimates. I doubt it. I'd be pleasantly surprised if they offered $500M.
     
     
  #9585  
Old Posted Jan 22, 2019, 7:39 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,616
Charge a toll for people to drive onto campus
     
     
  #9586  
Old Posted Jan 23, 2019, 1:59 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,521
Good to see them still suggesting a 2nd station at South Campus:


https://skytrain.ubc.ca/about-the-project/
     
     
  #9587  
Old Posted Jan 23, 2019, 5:33 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,075
Full Rail to UBC study is posted online:

https://www.translink.ca/-/media/Documen...9_01_24_technical_report_rail_to_ubc.pdf

A lot of detail in that report, perhaps the cost breakdown.

At-grade LRT = 70M/km
At-grade SkyTrain = 80M/km
Elevated SkyTrain = 140M/km
Tunnelled SkyTrain = 160M/km

At-grade station = 5M
Elevated station = 50M
Tunneled station = 100M




60% contingency!

Last edited by nname; Jan 23, 2019 at 5:45 AM.
     
     
  #9588  
Old Posted Jan 23, 2019, 6:57 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by nname View Post


60% contingency!
i have always wondered where they get contingency numbers from... 40-60% seems very very very high to me. shouldn't we be better at budgeting then this? even including inflation, that seems high.
     
     
  #9589  
Old Posted Jan 23, 2019, 7:02 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by VancouverOfTheFuture View Post
i have always wondered where they get contingency numbers from... 40-60% seems very very very high to me. shouldn't we be better at budgeting then this? even including inflation, that seems high.

It's quite standard practice to be using high contingencies at early stages of the project, given the potential risks without detailed designs.
     
     
  #9590  
Old Posted Jan 23, 2019, 7:03 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by deasine View Post
It's quite standard practice to be using high contingencies at early stages of the project, given the potential risks without detailed designs.
yeah and i get that, but still, 40-60%? that still seems crazy high.
     
     
  #9591  
Old Posted Jan 23, 2019, 7:09 AM
misher's Avatar
misher misher is offline
BANNED
 
Join Date: Jul 2018
Posts: 4,537
Quote:
Originally Posted by VancouverOfTheFuture View Post
yeah and i get that, but still, 40-60%? that still seems crazy high.
Seen this all the time in projects. The quotes always come in super low. Also with inflation being around 2-3% this contingency drops quite a bit.
     
     
  #9592  
Old Posted Jan 23, 2019, 8:06 AM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is online now
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,201
Quote:
Originally Posted by nname View Post
Full Rail to UBC study is posted online:

https://www.translink.ca/-/media/Documen...9_01_24_technical_report_rail_to_ubc.pdf



60% contingency!
Quote:
Originally Posted by VancouverOfTheFuture View Post
i have always wondered where they get contingency numbers from... 40-60% seems very very very high to me. shouldn't we be better at budgeting then this? even including inflation, that seems high.
Quote:
Originally Posted by VancouverOfTheFuture View Post
yeah and i get that, but still, 40-60%? that still seems crazy high.


Welcome to the tunnelling industry.

Anything geotechnical depends hugely on what ground conditions may be encountered. No matter how much money you spend on exploratory activities, you may still end up missing something which costs lots of money and time to mitigate. Most of that time, those activities also end up on the critical schedule path as well.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #9593  
Old Posted Jan 23, 2019, 3:47 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,559
Quote:
Originally Posted by officedweller View Post
Good to see them still suggesting a 2nd station at South Campus:
https://skytrain.ubc.ca/about-the-project/
Yes but I'll be disappointed if that's all UBC wants to pay for.

Also, that's quite the corner on that map. They'll need some real estate to get the train turned like that, I wonder how well that has been mapped out.
     
     
  #9594  
Old Posted Jan 23, 2019, 3:53 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,559
So a $20M/km premium to put it underground? I think that's within the City of Vancouver's budget to pay for that premium. Perhaps another tax on high end west side homes that will benefit?
     
     
  #9595  
Old Posted Jan 23, 2019, 3:56 PM
M00dy M00dy is offline
Registered User
 
Join Date: Nov 2016
Posts: 136
Quote:
Originally Posted by nname View Post
At-grade station = 5M
Elevated station = 50M
Tunneled station = 100M
That doesn't seem even close to right to me. At-grade stations on the Skytrain system aren't that much smaller or easier.

For a recent example look at Moody Station (at-grade) vs. Burquitlam (elevated) on the Evergreen Extension.
     
     
  #9596  
Old Posted Jan 23, 2019, 7:49 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,586
At the end of an article: "It hasn't been decided whether that line would run underground or on an elevated track." Oh suuure the west side will have an elevated Skytrain line. At most some of the line on UBC land might be on-ground or in a trench.

     
     
  #9597  
Old Posted Jan 23, 2019, 7:57 PM
csbvan's Avatar
csbvan csbvan is online now
Registered User
 
Join Date: Aug 2013
Location: Vancouver
Posts: 3,289
By the time they begin construction on the line out to UBC, nobody will actually live on the West Side to complain about the elevated track.
     
     
  #9598  
Old Posted Jan 23, 2019, 10:38 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,521
Quote:
Originally Posted by M00dy View Post
That doesn't seem even close to right to me. At-grade stations on the Skytrain system aren't that much smaller or easier.

For a recent example look at Moody Station (at-grade) vs. Burquitlam (elevated) on the Evergreen Extension.
I think that figure refers to the at-grade stations for the LRT options (but doesn't differentiate)

Quote:
Originally Posted by WarrenC12 View Post
Also, that's quite the corner on that map. They'll need some real estate to get the train turned like that, I wonder how well that has been mapped out.
The write up says they haven't examined detailed routing. I think that map is just "connect the [station] dots".
If it's tunnelled, they'd need to keep it away from vibration-sensitive research labs (This was an issue at University of Washington).
I suspect Wesbrook Mall would be the corridor, as that leads to the village centre at South Campus, Main Mall is too close to engineering, and East Mall is close to hospital and biological sciences labs.

Interference From Magnetic Light Rail Trains Forces UW to Move Labs
https://interferencetechnology.com/interference-magnetic-light-rail-trains-forces-uw-move-labs/#

Sound Transit to pay $43 million for relocation of College of Engineering labs
http://www.dailyuw.com/news/article_240ef421-8c4f-5e82-bc84-36e3134f2619.html
     
     
  #9599  
Old Posted Jan 23, 2019, 11:39 PM
Aroundtheworld Aroundtheworld is offline
Registered User
 
Join Date: Oct 2013
Posts: 623
Quote:
Originally Posted by deasine View Post
It's quite standard practice to be using high contingencies at early stages of the project, given the potential risks without detailed designs.
As a former civil engineer, the number I usually see is 30% contingency. 60% strikes me as ridiculously high.
     
     
  #9600  
Old Posted Jan 24, 2019, 12:10 AM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,559
Quote:
Originally Posted by Aroundtheworld View Post
As a former civil engineer, the number I usually see is 30% contingency. 60% strikes me as ridiculously high.
It's for inflation too. Reasonable to assume that's half of the 60% number.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:56 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.