Quote:
Originally Posted by M00dy
That doesn't seem even close to right to me. At-grade stations on the Skytrain system aren't that much smaller or easier.
For a recent example look at Moody Station (at-grade) vs. Burquitlam (elevated) on the Evergreen Extension.
|
I think that figure refers to the at-grade stations for the LRT options (but doesn't differentiate)
Quote:
Originally Posted by WarrenC12
Also, that's quite the corner on that map. They'll need some real estate to get the train turned like that, I wonder how well that has been mapped out.
|
The write up says they haven't examined detailed routing. I think that map is just "connect the [station] dots".
If it's tunnelled, they'd need to keep it away from vibration-sensitive research labs (This was an issue at University of Washington).
I suspect Wesbrook Mall would be the corridor, as that leads to the village centre at South Campus, Main Mall is too close to engineering, and East Mall is close to hospital and biological sciences labs.
Interference From Magnetic Light Rail Trains Forces UW to Move Labs
https://interferencetechnology.com/interference-magnetic-light-rail-trains-forces-uw-move-labs/#
Sound Transit to pay $43 million for relocation of College of Engineering labs
http://www.dailyuw.com/news/article_240ef421-8c4f-5e82-bc84-36e3134f2619.html