Quote:
Originally Posted by lrt's friend
It seems to me that there will be some rather complicated train maneuvers and signalling if the airport spur is the centre track at South Keys. Unless there is a flyover, which will require the southbound track to be bayed out to the west to accommodate the flyover, we are talking about two southbound trains crossing each other's path. The simplest approach is to have the airport spur be the most westerly track at South Keys so there is no cross-over required. Any train crossing operation will require a degree of train separation just as we already see at the passing tracks and to allow VIA trains to safely cross at Ellwood Junction. We are not going to see two southbound trains leaving South Keys 30 secounds apart.
|
It isn’t as complicated as one would think. South Keys is a passing track for the north and south trains, so both will be there at the same time. Also, for optimal transfers, the airport train will need to arrive just before the northbound train arrives and depart just after the southbound train departs.
To achieve that, the airport train can always use the western most track and the trains to/from the south always use the eastern track. Obviously northbound both trains can head into the eastern and central platform tracks easily. Southbound, the airport train waits for the southbound train to leave, cross over from the western platform track to the eastern track, clear the switch, for the switch to throw, and for it to get the all clear. It’s can then proceed to the airport on the western track. Since the route to the airport is shorter, the extra delay should be inconsequential (certainly less than was panned with only 2 platform tracks).