HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture


    The St. Regis Chicago in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Chicago Skyscraper Diagram

Map Location
Chicago Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Jan 11, 2019, 4:19 PM
lakeshoredrive lakeshoredrive is offline
Registered User
 
Join Date: Jul 2018
Posts: 494
Quote:
Originally Posted by Skyguy_7 View Post
I was speaking to one of the site superintendents yesterday and got some very good intel. They just poured the 90th floor two days ago. Core is at 94 and he says it's topped out. Must be 94 above upper Wacker. We'll see if they start disassembling core formwork or if it has to climb again to the roof level.

The hotel portion (up through 12th floor) which has changed ownership, is being entirely redesigned. All the brand new MEPs have to be demolished. New plans are coming out for the space and all the work that's already installed has to go. Absolutely insane.

Work has been slow going the last week with the weather getting worse. Tuesday or Wednesday, they clocked the wind speed on 70th floor at 80 MPH. It was 15mph on the ground. They had a piece of formwork collapse inward. Smashed a whole bunch of gangboxes and equipment.
What does MEP mean?
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture
Forum Jump



Forum Jump


All times are GMT. The time now is 12:47 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.