Quote:
Originally Posted by ilikeredheads
we've been over this several times. Canada Line is only designed to have their platforms at 50m MAXIMUM. The biggest constraint is Bridgeport Station, which features an island style platform sandwiched between 4 switches. It doesn't matter how much money you throw at it, as trying to extend beyond 50m will inevitably require rebuilding that section of the guideway and track, which will create a whole new set of problems and challenges.
|
I know the problems. I stated the line would likely require partial rebuilding of station platforms (at some of the less-steep sections, like 49th Ave and Oakridge), and rebuilding at many of the other station platforms, along with rebuilding on the Richmond and YVR spurs.
This would mean closing up the Canada Line because of its heavy fragmentation- which at that point, you may as well get on to adding station platforms at 16th, 33rd, and 57th while you're at it.
Also, rebuilding the Canada Line spurs means you'd have to rebuild the switches, most likely anyways.
Also, I noticed that the Canada Line spurs don't really look single-tracked on Google Maps. I'm counting 2 separate tracks. What's going on?
https://www.google.ca/maps/@49.1944817,-123.1290473,217m/data=!3m1!1e3
What I used to calculate grade:
http://www.heywhatsthat.com/profiler.html
So, how much would
that cost? 50% of the cost of the Canada Line? I mean, we should still be able to use
part of the old tracks when the line is done- and RE acquisition costs should also be less.
Quote:
Originally Posted by VancouverOfTheFuture
stop being this up people; just stop.
50m is all it will get, more trains, and trains with a middle car, i.e. A-C-A Vs the current A-A configuration will be it. also, this will be more than enough as doubling the # of trains without larger platforms is doable, and they are doing that. that'll make trains show up 2x as much, allowing for a lot more people to be moved.
so seriously people, stick with reality.
|
It's also more used than the Millennium Line...
Relief Lines on say, Victoria Dr might work to relieve some capacity problems, but it Canada is the most direct way to get from Downtown to Richmond. It needs to
eventually be expanded, regardless of difficulty.
Same with the Expo 30-40 years from now- there's no real easy replacement for the backbones of a system. Which is why the 41st Ave and Hastings B-line were not expected to (and did not) remove people off the Expo.