HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


Reply

 
Thread Tools Display Modes
     
     
  #821  
Old Posted Nov 15, 2018, 6:40 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,646
City announces preferred architects for super library on LeBreton Flats

Jon Willing, Ottawa Citizen
Updated: November 15, 2018


Diamond Schmitt Architects of Toronto and KWC Architects of Ottawa have won a competition to design a $192.9-million super library operated by the Ottawa Public Library and Library and Archives Canada.

The City of Ottawa announced Thursday that the firms, which formed a joint venture for the library procurement, are the preferred proponent to design the facility. Thirty-three submissions were narrowed to five in a request for proposal process, leading an evaluation committee to recommend entering into negotiations with the Diamond Schmitt Architects/KWC Architects team.

The facility will be built at 555 Albert St. on LeBreton Flats. (The property’s address has been changed from the previous 557 Wellington St.) The city-owned property is between Booth Street and Bronson Avenue.

The city has agreed to pay $104.2 million, plus $18.1 million for an underground parking garage, and Library and Archives will pay $70.6 million for the joint-facility, which would replace the OPL’s main branch at Laurier Avenue and Metcalfe Street. The current public library is being sold for $20 million to help fund the city’s construction bill.

The city expects the new facility to be complete in 2024.

Public consultations on the design are scheduled to begin in early 2019, the city said.

Diamond Schmitt and KWC also teamed up on a design to transform the Government Conference Centre into a temporary home for the Senate.

[email protected]
twitter.com/JonathanWilling

https://ottawacitizen.com/news/local-new...ects-for-super-library-on-lebreton-flats
Reply With Quote
     
     
  #822  
Old Posted Nov 16, 2018, 2:48 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
Diamond Schmitt does some really nice work but are relatively conservative compared to some of the other teams. Was really hoping for one of the European teams to win.
Reply With Quote
     
     
  #823  
Old Posted Nov 16, 2018, 3:57 AM
Admiral Nelson Admiral Nelson is offline
Registered User
 
Join Date: Jun 2009
Posts: 519
Quote:
Originally Posted by waterloowarrior View Post
Diamond Schmitt does some really nice work but are relatively conservative compared to some of the other teams. Was really hoping for one of the European teams to win.
It does seem like the usual suspects get contracts here. I wonder what's penalizing foreign design firms...
Reply With Quote
     
     
  #824  
Old Posted Nov 16, 2018, 4:07 AM
White Pine White Pine is offline
Registered User
 
Join Date: Jan 2010
Posts: 398
The Harris library in North Bay is nice enough, but the glass study rooms were notorious for blistering heat, and they had no air conditioning. Hopefully they think of that this time around.
Reply With Quote
     
     
  #825  
Old Posted Nov 16, 2018, 6:15 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,971
Quote:
Originally Posted by waterloowarrior View Post
Diamond Schmitt does some really nice work but are relatively conservative compared to some of the other teams. Was really hoping for one of the European teams to win.
Very... Ottawa. Very Federal Government.

I wish they would have done a design competition instead. For the life of me, I can't understand why that wasn't done, other than saving money? An extra 5-10 million to produce various bold visions seems like a small price to pay in the grand scheme of things.

That said, Diamond and Scmitt has produced some good work over the years, including the NAC expansion. Whatever they come up with should be pretty solid.
Reply With Quote
     
     
  #826  
Old Posted Nov 16, 2018, 2:24 PM
FutureWickedCity's Avatar
FutureWickedCity FutureWickedCity is offline
Registered User
 
Join Date: Mar 2016
Posts: 336
Checked out the projects on their web site. Most of them are ok, a few stand out (https://dsai.ca/projects/global-innovation-exchange-building/). I would agree that they are definitely trend followers, not trend setters. We can expect a boxy glass building with generic interiors of white walls and white pine everywhere.
Reply With Quote
     
     
  #827  
Old Posted Nov 16, 2018, 2:32 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,971
It worries me that these other architectural firms will give up on Ottawa and we'll end up stuck with the same rotation of 5-6 firms.
Reply With Quote
     
     
  #828  
Old Posted Nov 19, 2018, 1:42 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,971
From this angle, Claridge's LeBreton doesn't look too bad.


https://www.canadianarchitect.com/archit...central-library-and-archives/1003745263/
Reply With Quote
     
     
  #829  
Old Posted Nov 19, 2018, 2:45 AM
m0nkyman m0nkyman is offline
Registered User
 
Join Date: Oct 2006
Location: Ottawa
Posts: 2,032
In all fairness it was designed to be part of a neighbourhood. Most buildings would look like crap isolated in the middle of a field.
__________________
--Between build-and-run developers, budget-conscious planning departments, reactionary community associations and their city councillors, and the unaccountable OMB, we have more than enough bad actors sharing more than enough pathologies and perverse incentives.-David Reevely--
Reply With Quote
     
     
  #830  
Old Posted Nov 19, 2018, 4:02 AM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by m0nkyman View Post
In all fairness it was designed to be part of a neighbourhood. Most buildings would look like crap isolated in the middle of a field.
That's been my feeling all along - the colour is a little odd, and we all like to crap on Claridge cladding, but when you're up close the buildings and street scape seem nice. It's when you cross the street and realize you're in a barren wasteland that things seem odd.
Reply With Quote
     
     
  #831  
Old Posted Nov 19, 2018, 5:48 PM
HypoteMoose HypoteMoose is offline
Registered User
 
Join Date: Nov 2015
Posts: 11
The MacOdrum library at Carleton, while not the most interesting building to look at, is fantastic functionally as an actual library. My biggest gripe with MacO is that it's not big enough. Lots of my friends at uO even come to Carleton just to study and use the library.

I think that this project will be a tough one to judge until it's done and actually in use. I hope that they come up with an interesting and unique design, but first and foremost I hope they provide a library that people actually want to use and return to over and over again.
Reply With Quote
     
     
  #832  
Old Posted Nov 19, 2018, 5:57 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,646
Quote:
Originally Posted by HypoteMoose View Post
The MacOdrum library at Carleton, while not the most interesting building to look at, is fantastic functionally as an actual library. My biggest gripe with MacO is that it's not big enough. Lots of my friends at uO even come to Carleton just to study and use the library.

I think that this project will be a tough one to judge until it's done and actually in use. I hope that they come up with an interesting and unique design, but first and foremost I hope they provide a library that people actually want to use and return to over and over again.
Welcome to the forum!
Reply With Quote
     
     
  #833  
Old Posted Dec 6, 2018, 11:56 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,646
OPL considering fundraising campaign to raise at least $10M for super library

Jon Willing, Ottawa Citizen
Updated: December 6, 2018


The Ottawa Public Library will have to share its “story” with potential donors if it wants a chance at fundraising at least $10 million to put toward a $192.9-million super library on LeBreton Flats, a consultant says.

The OPL hired consulting firm KCI to gauge the fundraising potential for the library organization as it plans a new main branch in a joint facility with Library and Archives Canada. The building will be constructed at 555 Albert St., west of Bronson Avenue, and is scheduled to open in 2024.

The library on Thursday published KCI’s fundraising feasibility study.

The consultant talked with philanthropists, business leaders and other city leaders to determine what the OPL will need to do to raise that kind of money. A $10 million-$15 million fundraising campaign is attainable, the consultant concludes.

There are some immediate challenges, including competition from other organizations with major fundraising programs. The Ottawa Hospital, for example, will have a campaign for a new Civic hospital campus at the eastern end of the Central Experimental Farm.

KCI says the library will need to invest in planning and organizing a fundraising campaign and start building relationships with potential donors.

Ideally, the OPL would attract a single $5-million donation, but for now that kind of gift is being considered “aspirational.”

A capital fundraising campaign run by the OPL would help the city fund its $122.3 million share of construction. Over the longer term, fundraising revenue could provide the OPL with extra operational money to run programs.

During a meeting on Tuesday, OPL will ask library trustees for permission to hire two staff for the fundraising and communications program, which would cost $1.72 million over five years.

Mayor Jim Watson stood by the super library project this week, even though the future of the western part of LeBreton Flats is unknown under the National Capital Commission redevelopment program.

“We can’t go back to the good old days where we dither and flip-flop time and time again,” Watson said after Wednesday’s city council meeting. “The reason why I think we garnered some credibility in the last couple of terms of council is because we made decisions on things like LRT. We went out for public consultation, we voted on a plan, we stuck to the plan.”

The mayor predicted Ottawa’s new main library will rival celebrated libraries built recently in other cities.

“We’ll match up with Halifax and Calgary. I’m very confident of that,” Watson said.

[email protected]
twitter.com/JonathanWilling

https://ottawacitizen.com/news/local-new...-to-raise-at-least-10m-for-super-library
Reply With Quote
     
     
  #834  
Old Posted Dec 8, 2018, 8:22 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,634
Quote:
Originally Posted by J.OT13 View Post
From this angle, Claridge's LeBreton doesn't look too bad.


https://www.canadianarchitect.com/archit...central-library-and-archives/1003745263/
This cluster is a nice start to what should be a beautiful neighbourhood. The brick is a bit ugly but the density and street level interaction is well done.
Reply With Quote
     
     
  #835  
Old Posted Dec 12, 2018, 6:23 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,646
Glass reading room, a 'beacon', added to Rosemount library branch for $400K

Kelly Egan, Ottawa Citizen
Updated: December 12, 2018


<snip>

The board also had a progress report on the new central library, being built in partnership with Library and Archives Canada on a site on Albert Street — its new street number is 555 — right next to LeBreton Flats and close to the Pimisi light-rail stop.

The board was told the contract with the architectural firms, Diamond Schmitt Architects and KWC Architects, should be signed in the next week. The first quarter of 2019 will be the start of a major public engagement on the $193-million “super library,” of which the City of Ottawa is contributing about $122 million. The current main branch on Metcalfe has been sold.

The board also approved the direction of a major fundraising campaign that hopes to raise between $10 million and $15 million by the time the library is scheduled to open in 2024.

Among the first steps is a $1.72 million expenditure (over five years) to hire two full-time fundraisers to head a program that would find major and minor donors. The best-case scenario sees a single “aspirational” donor contributing as much as $5 million.

To contact Kelly Egan, please call 613-726-5896 or email [email protected].
Twitter.com/kellyegancolumn

https://ottawacitizen.com/news/local-new...ded-to-rosemount-library-branch-for-400k
Reply With Quote
     
     
  #836  
Old Posted Dec 20, 2018, 3:56 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,646
Library design a blank slate, architects promise
Public consultations to begin early next year

CBC News
Posted: Dec 20, 2018 8:02 AM ET | Last Updated: 33 minutes ago


The architects designing Ottawa's new central library say residents will shape the building's design.

"Design doesn't happen in a vacuum. It happens in a place, in a culture, in a context and that's what we really want to hear about, because that's what generates the ideas," said Don Schmitt of Diamond Schmitt Architects.

"We're not dropping in a design from some other place. It's really got to be embedded in this community."

That vision could include virtually anything from a recording studio to a demonstration kitchen to a media lab, with residents shaping the ultimate decisions for what the space should or should not include.

At an event on Wednesday, Schmitt said public consultations will likely take place starting in January and February.

"Libraries are no longer the store houses of books with tables and nice light where you sit quietly and read. They're much more active," he said, adding the partnership with Library and Archives Canada will likely mean museum-quality exhibition spaces.

The nearly $200 million building at 557 Wellington St., near LeBreton Flats, is set to be a partnership between the Ottawa Public Library and Library and Archives Canada.

It is expected to open in 2024.



Diamond Schmitt Architects remodelled the National Arts Centre and teamed up with KWC Architects on redoing the Government Conference Centre on Rideau Street, which will house the Senate for the next decade.

Both Halifax and Calgary recently unveiled major new libraries, each with their own unique designs and components.

Schmitt said he believes Ottawa can aim for similar grand projects.

Many of those Library and Archives artifacts that could be displayed are currently in storage, said Ottawa Centre MP Catherine McKenna, whose riding includes the area the library will sit on.

She hopes the public consultations will make the library a green community hub that people of all ages want to visit.

Diamond Schmitt Architects has a history of designing LEED-certified buildings that have low environmental footprints.

"It's not just a library anymore. It's a space that engages people that gets people excited, that's open to everyone and I think that's really critical," McKenna said.

"This should be a destination for residents of Ottawa and also for Canadians."

https://www.cbc.ca/news/canada/ottawa/ottawa-residents-will-design-new-public-library-1.4953497
Reply With Quote
     
     
  #837  
Old Posted Dec 20, 2018, 7:17 PM
FutureWickedCity's Avatar
FutureWickedCity FutureWickedCity is offline
Registered User
 
Join Date: Mar 2016
Posts: 336
I would LOVE to see an indoor winter garden. Being winter half the year, Ottawa is sorely lacking an indoor green space where people can relax and just escape from the winter for a little while. We should have more than one, in fact. One at the library and one at the Rideau Center would be perfect. They could easily do it at Rideau by just putting a glass roof on the rooftop outdoor area and filling the whole place with plants. They could do the same with the library.
Reply With Quote
     
     
  #838  
Old Posted Dec 20, 2018, 9:06 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,801
Quote:
Originally Posted by FutureWickedCity View Post
I would LOVE to see an indoor winter garden. Being winter half the year, Ottawa is sorely lacking an indoor green space where people can relax and just escape from the winter for a little while. We should have more than one, in fact. One at the library and one at the Rideau Center would be perfect. They could easily do it at Rideau by just putting a glass roof on the rooftop outdoor area and filling the whole place with plants. They could do the same with the library.
We would have had something like this when we had the Botanical Garden proposal, but too many Ottawa residents called it Disneyland. Ottawans don't like nice things.
Reply With Quote
     
     
  #839  
Old Posted Dec 22, 2018, 4:46 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,894
Quote:
Originally Posted by FutureWickedCity View Post
I would LOVE to see an indoor winter garden. Being winter half the year, Ottawa is sorely lacking an indoor green space where people can relax and just escape from the winter for a little while. We should have more than one, in fact. One at the library and one at the Rideau Center would be perfect. They could easily do it at Rideau by just putting a glass roof on the rooftop outdoor area and filling the whole place with plants. They could do the same with the library.
I LOVE this idea. It is sorely lacking in Ottawa. I would spend a lot of time there in the winter.
Reply With Quote
     
     
  #840  
Old Posted Dec 28, 2018, 3:01 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,646
Super library architects trying to balance civic focus with national prominence

Jon Willing, Ottawa Citizen
Updated: December 27, 2018


Politicians and designers brought up the recording studio at the new Halifax library so many times during a recent meet-the-architects event for the Ottawa super library project, it might be a major bummer if the new facility on LeBreton Flats doesn’t have a killer jam space.

They harped on the studio for one main reason: to give the public a heads-up that this $192.9-million facility, a joint project between the City of Ottawa and Library and Archives Canada, will be more than just a depot for books and old stamps.

Diamond Schmitt Architects and KWC Architects won a competition to design the building on city-owned land at 555 Albert St., just west of Bronson Avenue. After finalizing the contract, the city introduced the architects at the National Arts Centre on Dec. 19, using the Parliament Buildings as a backdrop.

The architects are tasked with designing a building that has national importance, since it will be home to a federal institution, but also one that reflects a local significance as the municipality’s flagship library. When the new building is done in late 2024, the Ottawa Public Library will close its main library on Metcalfe Street and truck the collection west to the Flats.

Expect a bright and airy building with less attention on book stacks and more focus on gathering spots, reading nooks and creative labs. It might even be a bit noisy compared to today’s library standards.

What the city is about to build might more resemble a recreation centre, but not necessarily for sports.

Since the opening is still six years away, it might be hard to predict what will be in vogue when architects begin drawing the interior and outdoor spaces of the building.

Will the maker movement still be chic? Will even more people be using tablets to read? Will macramé make another comeback?

Donald Schmitt, a principal at Diamond Schmitt, predicted the design will consider a “civic dimension with a national perspective,” giving architects the challenge of creating an internationally recognized, landmark building with intimate spaces.

“We want a community facility that really accommodates a scale of 2,000, of 200, of 20 and of two … as a comfortable place for all groups in the community,” Schmitt said. “The design of the program will be unusual in that it includes museum-quality exhibition spaces, diverse library spaces, music studios, maker spaces, all of those elements, and as well accessible service points for Library and Archives Canada.”

Gary McCluskie, also a principal at Diamond Schmitt, said the architects are watching closely how other libraries have included studios for video production, music and sewing. Even if the library is tricked out with the latest technology, there will still be places for students to study and for families to enjoy story time, he said.

“These are the things we value in libraries and archives and it is a respect for the facility of the past and an optimism for the facility of the future,” McCluskie said.

The design team is about to embark on a significant consultation campaign before sketching out the spaces.

Schmitt emphasized that the architects will pore over feedback provided during the consultation process, which is expected to begin early in 2019. He said the design team wants to meet as many people as possible, through sessions in the morning, afternoon, and evening, and during pop-up consultations at library branches across Ottawa.

“Our process is collaborative because we know from experience that our best projects are the result of a collaborative process, a conversation, a synthesis of program and a resolution of functional need,” Schmitt said.

While the chosen library property on LeBreton Flats has some critics, like Somerset Coun. Catherine McKenney, who’s concerned it’s too far away from an LRT station and the downtown core, the architects seem fired up about a site that’s between the downtown and an emerging part of the city, plus near the Parliamentary precinct. They like that the Ottawa River is just to the north and that an aqueduct shoots behind the library site, providing the potential to highlight the natural environment on LeBreton Flats through building design.

Schmitt characterized Pimisi Station as “almost at the front door of the library” in his praise for the location, although there are other parcels of land zoned for tall buildings that separate the LRT station from the library site along Albert Street.

“In our view, the site is extraordinary, almost heroic, and it will be celebrated in our design” Schmitt said.

[email protected]
twitter.com/JonathanWilling

https://ottawacitizen.com/news/local-new...nce-civic-focus-with-national-prominence
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 3:48 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.