Old Posted Nov 28, 2018, 4:28 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Catenary View Post
Siemens has seemed like the most likely option, considering their current offerings of the Charger, ACS, and Brightline/state Amtrak cars.
Yup, I called it in post number #894:

Quote:
Originally Posted by roger1818 View Post
Personally I think Siemens is the one to beat. They are the only company to have both locomotives and coaches in production in North America. Personally it is my favourite.
Speaking of Brightline, they have entered a strategic partnership and trademark licensing agreement with the Virgin Group and will become "Virgin Trains USA." I wonder if the Virgin Group would be interested in investing in VIA's HFR plan?

http://press.gobrightline.com/showPressRelease/100056754

Quote:
Originally Posted by Catenary View Post
They're building cab cars with the non-aerodynamic Charger design for the Amtrak order, so those combined with a locomotive to allow push-pull operation would fit VIA's needs quite nicely.
What do you mean by "non-aerodynamic Charger design?" The Charger seems rather aerodynamic to me. This is the first I have heard of Amtrack ordering cab cars from Siemens, do you have more information? I always assumed via would do like Brigthline Virgin Trains USA and have a locomotive at each end.
Reply With Quote
     
     
  #922  
Old Posted Nov 28, 2018, 7:07 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,402
Quote:
Originally Posted by roger1818 View Post
Yup, I called it in post number #894:



Speaking of Brightline, they have entered a strategic partnership and trademark licensing agreement with the Virgin Group and will become "Virgin Trains USA." I wonder if the Virgin Group would be interested in investing in VIA's HFR plan?

http://press.gobrightline.com/showPressRelease/100056754



What do you mean by "non-aerodynamic Charger design?" The Charger seems rather aerodynamic to me. This is the first I have heard of Amtrack ordering cab cars from Siemens, do you have more information? I always assumed via would do like Brigthline Virgin Trains USA and have a locomotive at each end.
I don't have a great way to describe this, but the Brightline/Virgin chargers have the aerodynamic fairing over the front couplers, while the state Amtrak units lack that fairing and have the more chop-nosed look.

The cab cars have the Amtrak design. Photo here:
http://www.capradio.org/articles/2017/11/09/new-railcars-set-to-be-built-in-sacramento/
Reply With Quote
     
     
  #923  
Old Posted Nov 28, 2018, 7:51 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Catenary View Post
I don't have a great way to describe this, but the Brightline/Virgin chargers have the aerodynamic fairing over the front couplers, while the state Amtrak units lack that fairing and have the more chop-nosed look.

The cab cars have the Amtrak design. Photo here:
http://www.capradio.org/articles/2017/11/09/new-railcars-set-to-be-built-in-sacramento/

Ahh, now I see what you mean. I wonder if Amtrak didn't want a cowling to cover the coupler. It also looks like the Amtrak locomotive has a lower window to allow the engineer to see the front coupler, which may have also been a design requirement. Both make sense if they plan to run split trains and thus frequently couple two trains together.

Here are a couple pictures showing Brightline SCB-40 and an Amtrak SC-44:


Image: Siemens SCB-40 Charger BLF 109 at Oakland Park, Florida
Image Source: railpictures.net


Image: A Siemens SC-44 Charger in Denver, CO, 2016.
Image Source: Wikimedia
Reply With Quote
     
     
  #924  
Old Posted Nov 28, 2018, 9:36 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,402
Quote:
Originally Posted by roger1818 View Post
Ahh, now I see what you mean. I wonder if Amtrak didn't want a cowling to cover the coupler. It also looks like the Amtrak locomotive has a lower window to allow the engineer to see the front coupler, which may have also been a design requirement. Both make sense if they plan to run split trains and thus frequently couple two trains together.

Here are a couple pictures showing Brightline SCB-40 and an Amtrak SC-44:
If we're looking at the same thing, that lower window is a dot-matrix destination display.

The difference between the units does seem to be purely cosmetic though, the arrangements of the headlights is the same, they're just behind some polycarbonate on the Brightline units.
Reply With Quote
     
     
  #925  
Old Posted Nov 28, 2018, 9:44 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Catenary View Post
If we're looking at the same thing, that lower window is a dot-matrix destination display..
Ahh, you are right. Seems a strange to have a destination display on a locomotive. This picture shows it better:

Reply With Quote
     
     
  #926  
Old Posted Dec 4, 2018, 8:10 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by capital_urbanite View Post
LaPresse is reporting today that Siemens might be the one to supply new dual-mode rolling stock for the Windsor-Quebec city corridor.

https://www.lapresse.ca/affaires/economi...via-rail-siemens-a-double-bombardier.php
Here is the same story in English from the Montreal Gazette.

Quebec blasts Ottawa over $1B Via Rail contract to Siemens
Reply With Quote
     
     
  #927  
Old Posted Dec 4, 2018, 9:09 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,789
Quote:
Originally Posted by roger1818 View Post
Here is the same story in English from the Montreal Gazette.

Quebec blasts Ottawa over $1B Via Rail contract to Siemens
So this allows for potential electrification of portions of the corridor?
Reply With Quote
     
     
  #928  
Old Posted Dec 4, 2018, 9:52 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by lrt's friend View Post
So this allows for potential electrification of portions of the corridor?
We will know more once VIA officially announces this (supposedly before Christmas) but I did previously say:
Quote:
Originally Posted by roger1818 View Post
Wikipedia says “Siemens said they might produce a dual-mode variant of the Charger with onboard energy storage for use by Metro-North and Long Island Rail Road, as well as intercity service, on Amtrak's Empire Corridor.”
So the answer is a definite maybe.
Reply With Quote
     
     
  #929  
Old Posted Dec 4, 2018, 10:40 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,869
I agree the Feds should have had a 25% Canadian Content clause in the contract (similar to what Ottawa had with the Confederation Line), but whoever complains that Bombardier didn't get the contract is nuts. I for one am glad that VIA didn't fall into the same trap as many cities across the country who ordered trains from Bombardier and now regret it.
Reply With Quote
     
     
  #930  
Old Posted Dec 5, 2018, 12:28 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
Legault is just playing politics. You can't re-open a trade agreement every time your local firm doesn't get a contract... Ontario and Quebec have specific exemptions in CETA for mass transit vehicle procurement domestic content, with a potential sunset clause to revisit after 5 years or if the US lowers its requirements below that threshold. In any case, Bombardier's rail divisions headquarters are in Berlin, and they make 3x as much revenue in Europe than in North America.
Reply With Quote
     
     
  #931  
Old Posted Dec 5, 2018, 12:41 AM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,847
That’s true, but European countries are pretty good at writing tenders to ensure locally-built trains win these procurements.
Reply With Quote
     
     
  #932  
Old Posted Dec 5, 2018, 2:25 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,869
Quote:
Originally Posted by waterloowarrior View Post
Legault is just playing politics. You can't re-open a trade agreement every time your local firm doesn't get a contract... Ontario and Quebec have specific exemptions in CETA for mass transit vehicle procurement domestic content, with a potential sunset clause to revisit after 5 years or if the US lowers its requirements below that threshold. In any case, Bombardier's rail divisions headquarters are in Berlin, and they make 3x as much revenue in Europe than in North America.
Didn't realize the trade agreement prevented VIA from asking for Canadian content.
Reply With Quote
     
     
  #933  
Old Posted Dec 12, 2018, 4:59 PM
White Pine White Pine is offline
Registered User
 
Join Date: Jan 2010
Posts: 398
I've just heard that VIA might make an announcement on FB in a couple of minutes (noon). Rolling stock?

Edit: I can't find any sign of a stream but Bloomberg is reporting that Siemens won.

EDIT2: https://www.facebook.com/pg/viarailcanada/videos/?ref=page_internal

Last edited by White Pine; Dec 12, 2018 at 5:10 PM.
Reply With Quote
     
     
  #934  
Old Posted Dec 12, 2018, 5:23 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
They just confirmed Siemens.
__________________
I've always struggled with reality. And I'm pleased to say that I won.
Reply With Quote
     
     
  #935  
Old Posted Dec 12, 2018, 5:28 PM
White Pine White Pine is offline
Registered User
 
Join Date: Jan 2010
Posts: 398
Hmm. Not sure I'm a fan of the change in livery colour scheme, but it's okay.
Reply With Quote
     
     
  #936  
Old Posted Dec 12, 2018, 5:46 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
Video Link


This will be a nice change. I'll be able to take European friends to Montreal by train without embarrassment

All we need now is HFR frequencies and travel times.
__________________
I've always struggled with reality. And I'm pleased to say that I won.
Reply With Quote
     
     
  #937  
Old Posted Dec 12, 2018, 6:05 PM
c_speed3108 c_speed3108 is offline
Registered User
 
Join Date: May 2007
Posts: 1,858
Reply With Quote
     
     
  #938  
Old Posted Dec 12, 2018, 6:47 PM
GoTrans GoTrans is offline
Registered User
 
Join Date: Jan 2010
Posts: 695
Quote:
Originally Posted by J.OT13 View Post
Didn't realize the trade agreement prevented VIA from asking for Canadian content.
Siemens is supposedly purchasing 20% Canadian content.
Reply With Quote
     
     
  #939  
Old Posted Dec 12, 2018, 7:25 PM
JohnnyRenton JohnnyRenton is offline
Registered User
 
Join Date: Nov 2018
Posts: 253
This will be the first time since the 80ès that VIA has had trains that look even remotely modern. It is not a game changer, but I like how they look and this well help VIA in boosting its image as a modern service.


And as Aylmer said, now that a new fleet is sorted out, lets see some big changes to the network next...
Reply With Quote
     
     
  #940  
Old Posted Dec 12, 2018, 10:44 PM
GoTrans GoTrans is offline
Registered User
 
Join Date: Jan 2010
Posts: 695
Quote:
Originally Posted by Aylmer View Post
Video Link


This will be a nice change. I'll be able to take European friends to Montreal by train without embarrassment

All we need now is HFR frequencies and travel times.
Unfortunately until the infrastructure is improved the trains won't be any faster or reliable. The scheduled time between Ottawa and Toronto was 4 hours even in the 1980's whereas it is now over 4 hours. We need more double track and less freight train interference now in order to shorten the trip times.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 3:41 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.